Download presentation
Presentation is loading. Please wait.
Published byAnis Parrish Modified over 8 years ago
1
D. BettATF Operations Meeting - 15 June 20121 FONT @ IP C. Perry G. Christian Y. Kim D. Bett N. Blaskovic Kraljevic
2
D. BettATF Operations Meeting - 15 June 20122 The goal: IP feedback This trip – preliminary work Week 1 Use the FONT5 board to digitize signals from Honda-san’s electronics instrumented on IPA, IPB Week 2 Verify operation of the new IP kicker
3
D. BettATF Operations Meeting - 15 June 20123 Week 1: Schematic Local Control Room (LCR) Final Focus Power Supply Room (FFPSR) IP Laser Room (IPLR) IPAIPB split IP-BPM signals to keep feeding the SLAC digitizers (currently a 1:1 split; plan to replace with a 1:9 split when Honda-san’s electronics are moved inside the tunnel) trigger signal (existing cable) trigger signal (borrowed 30 m cable) Honda-san’s electronics, FONT5 board (357 MHz digitizer) heliax from IPLR to IP
4
D. BettATF Operations Meeting - 15 June 20124 Week 1: Results phase-lock the LO two bunch mode QD0FF mover scan
5
D. BettATF Operations Meeting - 15 June 20125 Week 2 – add in IP kicker (IPK)
6
D. BettATF Operations Meeting - 15 June 20126 Week 2: Schematic IPAIPBMFB1FF FONT extraction line region IPK existing MFB1FF Σ, ∆, LO cables FONT scope existing FONT cables TMD amp. amp. trigger, drive signals 3 x borrowed 30 m cable for monitoring kicker and amp.
7
D. BettATF Operations Meeting - 15 June 20127 Week 2: IP-BPM results amplify LO level
8
D. BettATF Operations Meeting - 15 June 20128 Week 2: IP-BPM results
9
D. BettATF Operations Meeting - 15 June 20129 Week 2: IP-BPM results change the QD0FF current minimize the jitter at IPA change the QD0FF position observe the change in the position from EPICS and that from the FONT5 board BPM → QD current PREIPIPAIPBPIP 131.0179.67.219.029.9 137.2169.20.511.536.9 values in μm
10
D. BettATF Operations Meeting - 15 June 201210 Week 2: IPK results vary the magnitude of the kick ~10 μm kick possible while remaining in the linear region of the amplifier vary the amp. trigger time in the setup from shift, signals to amp. had to be sent by the FONT board ~600 ns before the signal from the bunch arrived at the board
11
D. BettATF Operations Meeting - 15 June 201211 Conclusions Multiple bunches easily resolved using Honda-san’s electronics on low-Q BPMs IP kicker provides ±10 μm kick at IP-BPMs Future plans –Move the IP feedback hardware to IP –New feedback algorithm(s) in firmware
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.