Presentation is loading. Please wait.

Presentation is loading. Please wait.

BUS 611 Week 4 Assignment Integrated Project Management To purchase this material link

Similar presentations


Presentation on theme: "BUS 611 Week 4 Assignment Integrated Project Management To purchase this material link"— Presentation transcript:

1 BUS 611 Week 4 Assignment Integrated Project Management To purchase this material link http://www.assignmentcloud.com/BUS-611/BUS-611-Week-4-Assignment-Integrated-Project- Management Integrated Project Management Tools. Choose a project where you were a team member or Project Manager that lasted more than three months. Write a three page paper that identifies the importance of integrated project management tools. The introduction should describe the industry involved, high level deliverables of the project, and the number of resources assigned to the project. The body of the paper needs to describe at least three of the following tools that were used for building an integrated project management system, and if these tools were effective or not. a. Generic WBS b. Scheduling System c. Work Authorization System d. Decision making process e. Integrated cost or scheduling system f. Project Status Reports Your conclusion should be a summary of your essay and should repeat the main ideas. In academic writing, a conclusion serves to remind the reader of what the paper is about and allows you to make a final point without introducing new information. For more courses visit our website http://www.assignmentcloud.com/


Download ppt "BUS 611 Week 4 Assignment Integrated Project Management To purchase this material link"

Similar presentations


Ads by Google