Download presentation
Presentation is loading. Please wait.
Published byAlvin Gabzx Modified over 8 years ago
1
Procedures in Planning and Conducting Maintenance
2
At the end of the discussion, you must be able to: Identify the different maintenance procedures in taking care of computers; Differentiate preventive maintenance and corrective maintenance; Differentiate ideal computer laboratory atmosphere
3
Maintenance The act or activity of keeping something in an existing and usually satisfactory condition
4
Two Types of Maintenance Preventive Maintenance Corrective Maintenance
5
Two Types of Maintenance Preventive Maintenance - is given for maintaining equipment and facilities in satisfactory operating condition to extend the life of the component. - Two types of Preventive Maintenance 1. Planned Maintenance 2. Conditioned-Based Maintenance
6
Two Types of Maintenance Preventive Maintenance - is given for maintaining equipment and facilities in satisfactory operating condition to extend the life of the component. - Two types of Preventive Maintenance 1. Planned Maintenance 2. Condition Based Maintenance
7
Two Types of Preventive Maintenance Planned Maintenance (PM) - is any variety of scheduled maintenance to an object or an item of equipment. Condition Based Maintenance (CBM) - is maintenance strategy that uses the actual condition of the asset to decide what maintenance needs to be done.
8
Two Types of Maintenance Corrective Maintenance - is task performed to identify, isolate, and rectify a fault so that the failed equipment or system can be restored to an operational conditions within the tolerances or limits.
9
Learning Task – Analysis Picture 1Picture 2
10
Learning Task – Analysis Picture 1Picture 2
11
Learning Task – Analysis Picture 1Picture 2
12
Learning Task - Application Group yourselves into 3 groups. Then make 5 sentences, what are the most important things to consider to have an ideal computer laboratory?
13
Assessment - Identify the following sentences. Write your answers in a ¼ sheet of paper. _______ 1. Maintenance of systems BEFORE fault occurs. _______ 2. It is the act or activity of keeping something in an existing and usually satisfactory condition. _______ 3. It is a task performed to identify, isolate and rectify a fault.
14
Assessment - Identify the following sentences. Write your answers in a ¼ sheet of paper. _______ 4. It is to ensure that an item of equipment is operating correctly to avoid any unscheduled breakdown and downtime of an equipment. _______ 5. It dictates that maintenance should only be performed when certain indicators show decreasing performance.
15
Answers key: 1.Preventive Maintenance 2.Maintenance 3.Corrective Maintenance 4.Planned Maintenance 5.Condition-Based Maintenance
16
Assignment Write a reaction paper regarding the video presentation shown earlier.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.