Presentation is loading. Please wait.

Presentation is loading. Please wait.

Various Gave presentation at TIG meeting on p5 control room. Feedback included… Proposal should explicitly cover all phases of CMS operations Running.

Similar presentations


Presentation on theme: "Various Gave presentation at TIG meeting on p5 control room. Feedback included… Proposal should explicitly cover all phases of CMS operations Running."— Presentation transcript:

1 Various Gave presentation at TIG meeting on p5 control room. Feedback included… Proposal should explicitly cover all phases of CMS operations Running Technical stops Recovery from equipment failure People have very different feelings for who should sit where… Recall: presently, each area has a unique workstation configuration Idea: if the workstation config were identical for all areas, this would… increase flexibility allow us to test different seating placements Updated Run Coordination google calendar based on... LHC schedule (no change w.r.t. March 2013 schedule) CMS week Tech. Coord. (Magnet test now 15 Oct-4 Nov 2014) 23 July Run Meeting (subsystem needs up to Global Run In Nov.) 29 July 2013 G. Rakness (UCLA)

2 To do Discuss with Christoph Schwick about...
DPG coordinator Run Coordination job description How should we be planning to prepare for Run 2... starting now? Brainstorming session? Have each group assemble list of commissioning tasks? Recall what we did in ? All of the above? Run Coordination boxology Operations Shifts Tools Pick up neutron note Read it again… what all is left to be done? Chad’s analysis documented here: 29 July 2013 G. Rakness (UCLA)


Download ppt "Various Gave presentation at TIG meeting on p5 control room. Feedback included… Proposal should explicitly cover all phases of CMS operations Running."

Similar presentations


Ads by Google