Download presentation
Presentation is loading. Please wait.
Published byburtonjake harrison Modified over 7 years ago
1
BUS 307 Week 4 DQ 2 IT EOQ ROP Interrelationships Check this A+ tutorial guideline at http://www.assignmentcloud.com/BUS-307-ASH/BUS-307-Week-4- DQ-2-IT-EOQ-ROP-Interrelationships From the end of Chapter 14, answer Discussion Question 6: The just-in-time (JIT) movement has long argued that firms should a. Maximize their process flexibility so that ordering costs are minimal; b. Stabilize demand levels; c. Shrink lead times as much as possible; and d. Assign much higher holding costs to inventory than has traditionally been the case. Using the economic order quantity (EOQ) and reorder point (ROP) formulas, explain how such efforts would be consistent with JIT’s push for lower inventory levels. Respond to at least two of your classmates’ postings. For more classes visit www.assignmentcloud.com
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.