Presentation is loading. Please wait.

Presentation is loading. Please wait.

DU15: Internal Photometric Calibration Dafydd Wyn Evans, IoA

Similar presentations


Presentation on theme: "DU15: Internal Photometric Calibration Dafydd Wyn Evans, IoA"— Presentation transcript:

1 DU15: Internal Photometric Calibration Dafydd Wyn Evans, IoA

2 DU15: Personnel Dafydd Wyn Evans (DU15 manager) 100%
Francesca De Angeli % Marco Riello % Floor van Leeuwen %

3 DU15: Summary of Activities
Preparation for Cycle 4 simulations Gates for BP/RP, AC flux loss, non-linear CCD Million Star Sample, Billion Star Sample Data model – much work (see later presentation) Data flow diagram FDA-003 – finished Data model part went into DWE-009 Responding to PJR (CU5-Q) comments Not an ESA requirement Drain on manpower to continuously update or cross-reference Minimum changes to get it up-to-date and then freeze (Livelink) DU15 Wiki page started (click here) Simulation summaries Java Cookbook

4 DU15: Summary of Activities
Dummy pipeline done for accumulator (AccumPhot) Deciding on the MDS and ADS JavaDoc JUnit tests Mantis request for Persistence Manager Accumulation study (DWE-010) P values

5

6 DU15: Summary of Activities
Dummy pipeline done for accumulator (AccumPhot) Deciding on the MDS and ADS JavaDoc JUnit tests Mantis request for Persistence Manager Accumulation study (DWE-010) P values FVL-007 (BP/RP processing) still being worked on (see later presentation by FvL) Cycle 2 (2-A & 2-B)

7

8

9 DU15: Summary of Activities
Dummy pipeline done for accumulator (AccumPhot) Deciding on the MDS and ADS JavaDoc JUnit tests Mantis request for Persistence Manager Accumulation study (DWE-010) P values FVL-007 (BP/RP processing) still being worked on (see later presentation by FvL) Cycle 2 (2-A & 2-B) and 3 (3-F & 3-G) received IDT processing done on GaiaGrid using IoADPC nodes (by DU2 & 4) 3-G 7000 jobs, 289 Gbytes Preparation for Cycle 5 simulations Radiation damage

10 DU15: Plan for next 6 months
Pipeline Dummy pipeline (G & integrated BP/RP) Constant star detection Large-scale calibration Calibration application (Small-scale calibration) First algorithms Above 3 & AccumPhot BP/RP calibration (prototype implementation) Test pipeline with Cycle 3 & 4 data Monitoring of calibrations (quality control) Requirements definition Data model Request Cycle 6 data Photometric One-Day Calibration (PODC) Make sure that attitude methods are acquired from CU3

11 DU15: Risks Late delivery of CU3 attitude methods
Will have an impact on testing during Cycle 5 Lack of manpower Simulations Not enough data Not complex enough Computing Breakdown of hardware BP/RP calibration difficulties Varying dispersion etc. CTI effects (especially faint end) Volume of data

12 CU5 Data Model Dafydd Wyn Evans, IoA

13 CU5 Data Model Data model DWE-009 (from FDA-003)
PJR comments (mainly consistency and cross-referencing to FDA-003) Missing DU17 and DU18 data types DU13/14 consistency with DT definition (but not field names) Many data types are only the first attempt Fluxes not magnitudes Consistency of units is needed (to avoid conversions) Monitoring data types are missing Previous talk at CU5W03 here Current structure (differences) Folders for each DU Phot/Spec/Spss and Fov/Ccd naming convention (consistency)

14 CU5 Data Model Future responsibility will be with the DUs
A designated person from each DU (sometime in Cycle 5) Data Model Verification/Consolidation meeting 20 ESAC After this ESAC will lock the MDB(?) part of the Dictionary Tool Further changes will be done via a Configuration Control Board and Mantis Therefore 2 months to sort out all remaining issues Discussion and actions


Download ppt "DU15: Internal Photometric Calibration Dafydd Wyn Evans, IoA"

Similar presentations


Ads by Google