1 ACEC Presentation September 22, 2016
Chris Hassert, PE Planning & Engineering Director

2 Discussion Items Staff Overview Group Focus Areas
Capital Improvement Program Water/Sewer Rates Campus Solar/Battery Project

3 ASSIGNED FACILITIES, SYSTEMS OR PROGRAMS Water Resources Engineer
Planning and Engineering Team TITLE ASSIGNED FACILITIES, SYSTEMS OR PROGRAMS Water Resources EIT Process Control Assistance Water Resources Engineer Water Distribution System & Hydraulic Modeling Sewer Collection System, RWDS, IWDS Senior WR Engineer Asset Mgmnt, CGTF & Site 80, CAP WTP SROG Support, CWTP, Water Campus Reclamation Plant Principal WR Engineer Water/Sewer Planning & Development Interface Process Control Lead for CAP WTP, Chaparral WTP, Campus/AWT All Potable and Recharge wells, Westworld, Desert Mtn

4 Planning and Engineering Functions
Master Planning Infrastructure Improvement Plans (IIPs) CIP Development Asset Management IGAs and Other Agreements Studies and Evaluations Other Challenges – Salinity, Invasive Species, etc.

5 Planning and Engineering Functions
Troubleshoot system issues Develop project scopes and budgets Engaged in design and construction Guide developers Manage groundwater wells Treatment plant process control Hydraulic model management Monitor sewer flows Pilot test new technologies

6 Scottsdale Water Capital Improvement Program (CIP)

7 How do we pay for system capital needs?
Water and Sewer Rates – Monthly billing of customers pays for operating costs and asset rehab and replacement Development Fees – Pays for growth Water Development Fee Sewer Development Fee Water Resources Development Fee Agreement Revenue - Cost recovery Golf courses, adjoining systems

8 Scottsdale Water CIP FY16/17 to FY20/21 Took effect on July 1, 2016
CURRENT 5-YR CIP $176.7 M AVERAGE YEARLY CIP $35.3 M HIGHEST YEAR (FY 16/17) $70.3 M LOWEST YEAR (FY 19/20) $21.2 M NOTE: Approximately $131M of available funds going into this FY

9 CIP FUNDING BREAKDOWN FY17-FY21

10 Water Infrastructure Projects
Waterline replacements BPS upgrades Large meter replacement Reservoir rehab Well rehab and replace Membrane replacement Telemetry upgrades Security enhancements Treatment plant mods Other asset mgmnt. driven items

11 Highlighted Water Projects
Reservoir Rehab Gaseous Cl2 Conversions Electrical Upgrades BPS Upgrades FLW Transmission Main East Shea Improvements TGTF Design & Construction

12 Reclamation Infrastructure Projects
Sewer replacements Sewer lining and manhole rehab Odor control Lift station upgrades Membrane replacement Telemetry upgrades Security enhancements Treatment plant mods Advanced treatment mods Other asset mgmnt. Driven items

13 Reclamation Projects Sewer Assessment Program Lift Station Upgrades
Pumpback Rehab Telemetry Upgrades Campus Treatment Facility Mods Gainey Structural Repair

14 Asset Management Data base

15

16 Water and Sewer Rate Adjustment History
Fiscal Year Water Sewer Combined 2010/11 - 0 - 2011/12 2012/13 2013/14 (1.8%) 4.0% (0.2%) 2014/15 (1.2%) (0.3%) 2015/16 1.3% 2.6% 1.6% 2016/17 Cumulative (0.5%) 5.4% 1.1% Rate reductions resulted from rate structure changes driven by cost of service study results and revenue stability.

17

18 Water Campus Solar Project
Solar Services Agreement (SSA) with SolarCity for 2.3MW of solar infrastructure 2000 kWh Tesla lithium-ion battery storage 20-year agreement No capital required by Scottsdale Water SolarCity finances, designs, builds, operates and maintains system SSA approved by Council on July 5, 2016

19 Project Location – Scottsdale Water Campus

20 Project Benefits Estimated $1.4M energy savings over 20-year agreement
Solar/Battery combination reduces demand charges on electric bill Project will offset 10% of electric grid supplied power to Campus with clean renewable energy Battery storage will serve as an additional power back-up in the event of a regional power outage

21 Battery Storage Benefits Illustrated
Trim Peak Demand Reduce Demand Charges Lower Bills Demand Spike Batteries Trim Demand Spikes

22