Presentation is loading. Please wait.

Presentation is loading. Please wait.

Greening the Campus: From the Data Center to the Classroom

Similar presentations


Presentation on theme: "Greening the Campus: From the Data Center to the Classroom"— Presentation transcript:

1 Greening the Campus: From the Data Center to the Classroom
Oscar Ramos, Link Alander & Shah Ardalan | 10/15/2010

2 Presentation Overview
Introduction to Lone Star! Active Green Initiatives Data Center Advanced Power Management Asset Recovery New Green Initiatives Classroom Technology Questions

3 Overview LSCS - Enterprise
13 Locations across 1,400 square miles 5 Colleges 2 University Centers 5 Instructional Centers Systems Office and Training Center 21 new buildings this year 5 new geographic locations Our Customers (90,000 strong) 69,363 Credit Students 21,000 Non Credit Students Average 25% growth per semester Over 4,800 employees Supported by 152 OTS staff members

4 Enterprise Transformation – Technology Services
Technology Foundation Best Practices Business Alignment Transformation using Best Practices, Business Alignment and a solid Technology Foundation to become a Strategic Partner and raise our enterprise IT Maturity. Strategic Alignment Strategic Plan for IT aligned with the College Systems Strategic Plan Organizational Transformation Infrastructure Transformation Business Transformation Reorganized 6 into 1 (May 08) WAN redesign (Apr 08) ERP Assessment (Jan 09) IT Standards (Jun 08) AD/Exchange redesign (Nov 08) ERP Selection (May 09) Restructured Positions (Sep 08) 5-nines Standard (Jan 09) ERP Implementation (Sep 09) IT Governance (Oct 08) IT Service Continuity (Apr 09) - Finance Live (Jan 10) Established KPI’s (Dec 08) Client Management (Mar 09) - Employee Portal Live (Jan 10) 24/7 Service Desk (Jan 09) Green Computing (Mar 09) - Student Portal (Jun 10) ITSM Alignment (Feb 09) Advanced Power Mgt. (Dec 09) - Campus Solution (Dec 10) Executive Reporting (Feb 09) New Data Center (Jan 10) - HR (Dec 10) Managing Change (Oct 09)

5 There are two major factors that lead to this shift in focus.
Green IT Principles As the trends of the Technology Industry move toward a more energy conscience, sustainable model; the LSCS Office of Technology Services has committed to being a leader in this arena by engaging in more Eco friendly practices. There are two major factors that lead to this shift in focus. As an institution of Higher Education, we have a social responsibility to address this issue and be a leader in our community As stewards of tax payers’ dollars, we have a fiscal responsibility to manage costs and improve efficiencies.

6 Data Center Oscar Link Alander, Associate Vice Chancellor

7 Constant – Evaluation and Measurement
Going Green – Data Centers The most Challenging and Complex part of our Green Initiative LSC has created new standards and policies for our 14 Data Centers throughout the system. The main focus is the conversion and consolidation of physical servers to virtual servers, advanced power management and high density blade servers. Objectives VM First Policy New System-wide VM Farms New Campus VM Farms New Center VM Farms Consolidation System data centers New High Efficiency Data Center Campus and current data center redesign Storage virtualization Constant – Evaluation and Measurement

8 Savings over Traditional Hardware
Going Green – Data Centers Virtualization VM First Policy - ELA Significant benefits in savings and availability Site and Disaster Recovery Our VM Farms 2 – HP C- Class Blade enclosures 12 – BL460’s dedicated to the farm Average consolidation ratio 20:1 High Availability design and data center co-location Increased capacity and flexibility Savings over Traditional Hardware $630,000 VM Power Savings 400+ virtualized servers Average cost per server per year $1,103 Projected 70 % savings per year Total $231,789 Note: does not include cooling savings

9 $73,742 $48,821.16 $21,843.90 $70,665.06 Going Green – Data Centers
In September 2009 we calculated the power savings for our new VM Farm design Projected Yearly Savings $48,821.16 Campus Instructional Server Room (Model) Avg. Rate for system = .1039 Design L.P.H Capacity Annual Cost Old 11.04 KwH 16 Physical $10,048.21 New 2.1 KwH 36 VMs $1,911.34 Delta 8.94 KwH 20+ VMs $8,136.86 Actual Savings Based on System Deployed for 12 Months $73,742 Projected Yearly Savings $21,843.90 Center Instructional Server Room (Model) Avg. Rate for system = .1039 Design L.P.H Capacity Annual Cost Old 5.5 KwH 8 Physical $5,005.90 New 1.5 KwH 15 VMs $1,365.24 Delta 4 KwH 7+ VMs $3,640.65 Total Yearly Savings $70,665.06 Calculation = L.P.H.*24 hrs*365 = Total KwH for year *rate*6 )

10 Cooling and Heat Management
Going Green – Data Centers Cooling and Heat Management Provides the Fastest and Highest ROI for a Data Center Cooling Air Flow Management Floor and Rack Density Planning Heat Management Water Cooling - High efficiency and targeted cooling Thermal Plan Same Room Same Hardware Data Center Research and Planning Resources

11 New LSCS Tier IV Data Center
Going Green – Data Centers New LSCS Tier IV Data Center Green – High Density Design Dual Commercial Power Feeds Dual Generator Plants 240KW load capacity – per A/B Path 99.9 % Efficient and Scalable UPS Closed Loop Cooling (water cooled racks) In-Rack Fire Suppression System Packed into 970 square feet!

12 “Savings – Greening The Data Center”
Going Green – Data Centers “Savings – Greening The Data Center” Setup Cost $3,200,000 Projected Savings (3yr) $4,020,044 ROI - $820,044 by year 3 Benefits High Availability Design Projected - Data Center Energy Savings of $428,978 per year

13 Advanced Desktop Power Management
Oscar Oscar Ramos, Executive Director

14 Standard Power Management Tool
Advanced Desktop Power Management Why vPro? Efficiency Standard Power Management Tool Automation Schedule Overnight PC power shutdowns

15 Central Management shared with Local Management
Advanced Desktop Power Management Centralization Central Management shared with Local Management Patch Management Access systems only when needed and verify with reports

16 $344,660 $728,650 Savings - Power Management
Traditional PC Annual cost $ 81.27 Carbon footprint lbs Equivalent to driving miles Intel vPro – add advanced power mgt Annual cost $ 40.80 Carbon footprint lbs Equivalent to driving 85 miles Savings Based on System Deployed for 24 Months $344,660 Year Baseline Annual Cost Carbon Equivalent to QTY Electric/Cooling Footprint (Lbs) driving (miles) Baseline costs 12,000 $ ,250 2,015,000 1,992,000 Year 1 - FY 2009 Total 2009 $ 867,415 1,834,250 1,814,750 Savings over base year $ ,835 180,750 177,250 Year 2 - FY 2010 Total 2010 $ 692,425 1,462,500 1,447,000 Savings over last year $ ,990 371,750 367,750 $ ,825 552,500 545,000 Estimated Savings Based on System Deployed for 36 Months $728,650

17 Asset Recovery Oscar Oscar Ramos, Executive Director

18 Definition Asset Recovery
E-waste - may be defined as all secondary computers, entertainment device electronics, mobile phones, and other items such as television sets and refrigerators, whether sold, donated, or discarded by their original owners. Contract Requirement Competitive Market Rate DOD Wipe Zero Landfill No Over Seas Dumping

19 Classroom Technologies
Oscar Oscar Ramos, Executive Director

20 Printers Tool HP Webjet Admin, Duplex Unit & Standardization Function
Utilizing Web Jet Admin to create reports on usage. With a duplex unit you can print on both side of a page. Benefit Reduce paper consumption Using Web Jet Admin reports, create a plan to reduce the number of printers Save $$$ via standardization

21 Tablets Tool HP EliteBook 2730p Function
Tablets are being used to make annotations in interactive classroom activities and grading. Benefit Electronic Grading Interactive tool for use with Lecture Capture system Save $$$ via reduction in paper print outs

22 Occupancy Sensors Tool Tekvox Control System Function
Occupancy Sensors in the classroom shut off the lights when no motion is detected after 15 minutes. Benefit Saving of money by only having the lights on when needed.

23 Thin Clients Tool HP t5740 Function
Thin Clients are used in classrooms as an alternative to traditional PCs. The image/applications are delivered via a server backend. Benefit Extend Life of Cycle Reduced Power Consumption Reduce application management costs Deliver apps instantly to users anywhere Enable user mobility on any device

24 Classroom Technologies provide new outlets for Green Initiatives!
Overview Data Center enhancements will lead to a yearly savings of $428,978 per year Advanced Desktop Power Management will save nearly $725,000 over three years! Asset Recovery will keep old equipment and components out of the landfill! Classroom Technologies provide new outlets for Green Initiatives!

25 Questions?

26 THANK YOU


Download ppt "Greening the Campus: From the Data Center to the Classroom"

Similar presentations


Ads by Google