Schedule Overview Current Site Activities Site Preparation [Fencing, tree clearing, access] Sheet Pile and wellfield installations Construction of Thermal Treatment Treatment Area – Phase 2 Thermal Beede-Community Work and upcoming Open Houses EPA: Five Year Review
2
July 24, 2017 – Plaistow BOS Update
3
Schedule Overview 2017 2018 Complete Phase 2 thermal system design
Begin Phase 2 thermal construction 2018 Complete Phase 2 thermal construction Operate Phase 2 thermal system Begin soil and landfill excavation design
4
Current Site Activities
July Open house and baseline bat count – July 27 from 7 to 9 pm Start sheet pile prep work August & September Phase 2 area thermal design Sheet pile installation (mid August start) Phase 2 thermal area wellfield installation (mid August start) October – December Construction of Phase 2 thermal system Annual MOM groundwater, surface water, and residential monitoring event
5
Phase 1 and 2 Thermal Treatment Areas
Groundwater Treatment System) Phase 2 Area Phase 1 Area (Completed)
6
Recent Community Activities
Worked with Timberlane High School STEM teachers Zoology class – bat study & bat house project Turtle rescue - site visit and presentation Engineering week – presentation to civil engineering class
7
Habitat Restoration Area
Brush piles Bird boxes
9
Five Year Review September 2017
12
Five Year Review Outcomes