1 Early years school, Singapore Infant evacuation design
Chris Chennell – Fire Safety Engineer State Manager | Associate Director Olsson Fire & Risk - Australia

2 Who we are Olsson Fire & Risk is an engineering consultancy, specialising in performance based design, fire protection and fire risk assessment for building and development projects. Olsson Fire & Risk’s business focus is providing specialist engineering support to the building and development industry to provide innovative, cost effective and code compliant designs. We offer our clients the flexibility to access the complete life cycle of fire safety design as and when they require. We strive to offer a fire engineering design that is adaptive to suit the design aspirations of the proponent. QUALITY INTEGRITY PRAGMATIC PERSONABLE ACCOUNTABLE

3 The project

4 The project

5 The problem

6 The approach Use of the space Conceptual Design Management & Training
Agree Principles Principle Approval Analytical Design

7 The approach COST TIME Concept Detailed Design Specification
Cost: Value potential dependent in project Maximum Value / Minimal Cost Minimal Value / Greatest Cost TIME Concept Detailed Design Specification Construction Use

8 research

9 Concept

10 concept

11 analysis

12 Fire protection Cluster Protection Stair Smoke Protection
Fire Command Centre Sprinkler System Automatic Fire Detection & Alarm Emergency Voice Communication Engineered Smoke Control Compartmentation Stair Enclosure Lift Cores

13 training

14 summary Thank YOU Chris.chennell@olssonfire.com Chris Chennell