Download presentation
Presentation is loading. Please wait.
1
FOIL ERP
2
Modules Coil Inward Foil Return to Supplier Printing
Coil Planning Card QC of Inward Foils Qc After Printing Rolling Stage - I Reel Planning After Inward Inward Reels at Dispatch Qc After Rolling State - I Coating Card Dispatch Reels Rolling Stage - II Lamination Card Sales Return of Issued Reels Qc After Rolling Stage - II Lamination Reel merging Slitting Shop Card QC After Lamination Change Reel Status Coil Slitting Coating Reports Reel Planning QC After Coating Annealing In Conversion Slitting Planning Annealing Out Conversion Slitting Contact US Qc After Annealing Qc After Conversion Slitting Other Raw Material Inward Printing Lot Card LDPE / POLY Inward Pre Printing Status Entry Foil Inward Other RAW Material Returned to Supplier Please Click on Link for Detailed Information. LDPE / POLY Returned to Supplier EXIT
3
Coil Inward With this module, you will be able to Inward Coils
GRN will be generated and can be printed Inward register will be generated Stock of coils It will also have effect in all stock related reports Back
4
Coil Planning card With this module, you will be able to
Make planning of Coil Coil card will be prepared and printed Back
5
ROLLING STAGE I With this module, you will be able to
Enter Rolling Mill stage I entry (pass 1,2,3) After this stage coil will go to WAIT QC AFTER ROLLING I Back
6
QC After ROLLING STAGE I
With this module, you will be able to Enter QC status of coil after rolling stage I After this stage coil will go to WAIT ROLLING STAGE II Back
7
ROLLING STAGE II With this module, you will be able to
Enter Rolling Mill stage I entry (pass 4,5,6) After this stage coil will go to WAIT QC AFTER ROLLING II Back
8
QC After ROLLING STAGE II
With this module, you will be able to Enter QC status of coil after rolling stage I After this stage coil will go to WAIT SLITTING PLANNING Back
9
Slitting Shop Card With this module, you will be able to
Plan for coil slitting planning You can mention slitting setting and expected no. of reels Back
10
Coil Slitting With this module, you will be able to
Enter slitting detail of coil Generate Reel no. Mention reel weight and specifications Back
11
Reel Planning With this module, you will be able to
Plan whether reel will go for annealing, dispatch Back
12
Annealing In With this module, you will be able to
Enter detail of reels on which annealing process is done Also we will be able to keep track of time in Reel status will be changed to ANNEALING IN Back
13
Annealing Out With this module, you will be able to
Enter detail of time out Reel status will be WAIT QC AFTER ANNEALING Back
14
QC After Annealing With this module, you will be able to
QC detail of reels for which annealing process is done Reel status will be WAIT QC REEL PLANNING Back
15
Other RAW Material Inward
With this module, you will be able to Inward other raw material (Other than foils and LDPE/Poly) GRN will be generated and can be printed Inward register will be generated Stock of other raw material will be increased. It will also have effect in all stock related reports Back
16
LDPE / POLY Inward With this module you will be able to
Inward LDPE/Poly reels along with their reel nos. GRN will be generated and can be printed Inward register will be generated Stock of reel no. wise LDPE / POLY will be increased. It will also have effect in all stock related reports Back
17
Foil Inward With this module you will be able to
Inward foils. – Reel no. will be auto generated on the basis of supplier and inward date. GRN will be generated and can be printed Inward register will be generated Stock of reel no. wise foils will be increased. It will also have effect in all stock related reports Foils will have status WAIT QC AFTER INWARD Back
18
Other RAW Material Returned to supplier
With this module you will be able to Return raw material to supplier SRN will be generated and can be printed Sales return register will be generated Stock of other raw material will be reduced. It will also have effect in all stock related reports Back
19
LDPE / POLY Returned to supplier
With this module you will be able to Return LDPE / POLY to supplier SRN will be generated and can be printed Sales return register will be generated Stock of LDPE / POLY will be reduced, also will have effect in reel no. wise stock It will also have effect in all stock related reports Back
20
Foil Returned to supplier
With this module you will be able to Return foils to supplier SRN will be generated and can be printed Sales return register will be generated Stock of foils will be reduced, also will have effect in reel no. wise stock It will also have effect in all stock related reports Back
21
QC OF INWARD FOILS With this module you will be able to
Enter QC status of foils after inward. You can pass reels or hold or reject them. In case of rejection it will ask you reason. After passing of QC reel will go to next stage i.e. REEL PLANNING AFTER INWARD Back
22
Reel Planning After Inward
With this module you will be able to Plan next stage of reel. It can be Lamination , Coating or direct dispatch Next stage of reel will be based on next stage selected. Back
23
Coating Card With this module you will be able to
Prepare coating card. In coating card you can mention input material, input weight, size, HSL type to be used, output weight etc… Lot no. will be generated on the basis of Month and year Reels to be used in the process will be also mentioned during entry. This will give 100 % accuracy because during selection process it will only show those reels which have specific input type, size, gauge and status. So only matching reels and reels which are not used in any process will be considered. Also when reel is selected or unselected total input weight will be displayed. This will give us information of exact input weight. Reels attached with coating card cannot be used with other lot card or process Lot card can be printed Back
24
Lamination card With this module you will be able to
Prepare lamination card. In coating card you can mention input material, lamination instruction input weight, size, LDPE / POLY to be used, output weight etc… Lot no. will be generated on the basis of Month and year Reels to be used in the process will be also mentioned during entry. This will give 100 % accuracy because during selection process it will only show those reels which have specific input type, size, gauge and status. So only matching reels and reels which are not used in any process will be considered. Also when reel is selected or unselected total input weight will be displayed. This will give us information of exact input weight. Reels attached with coating card cannot be used with other lot card or process Lot card can be printed Back
25
Lamination With this module you will be able to
Enter reels used as an input along with used weight, hand over weight, taken down weight. Here only those reels will be available which are linked with selected lot. Enter LDPE / POLY used along with reel no. information Output reels generated with output weight. Reel no. will be generated in such a way that you can get detail of input reels used for that output reel. Generated output reels will be displayed as reels WAIT FOR QC AFTER LAMINATION. Back
26
QC after Lamination With this module you will be able to
Enter QC result of reels generated during lamination. QC passed reels will be available for conversion slitting. Back
27
Coating With this module you will be able to
Enter reels used as an input along with used weight, hand over weight, taken down weight. Here only those reels will be available which are linked with selected lot. Enter HSL material used in the process. Output reels generated with output weight. Reel no. will be generated in such a way that you can get detail of input reels used for that output reel. Generated output reels will be displayed as reels WAIT FOR QC AFTER COATING. Back
28
QC after coating With this module you will be able to
Enter QC result of reels generated during coating. QC passed reels will be available for conversion slitting. Back
29
Conversion Slitting Planning
With this module you will be able to In Conversion slitting there can be different cutter settings, size and sets. Also planning of core is also mentioned in this planning. Back
30
Conversion Slitting With this module you will be able to
Enter detail of input reels used in conversion slitting. Here only those reels which are generated in the given lot will be displayed for input reel information. In Conversion slitting there can be different cutter settings, size and sets. Also planning of core is also mentioned in this planning and lot no. output reel nos. will be generated automatically. Weight of output reel will be automatically calculation on the basis of core type, ID and OD and product density which will be very close to actual weight. All the reels generated in this process will have status WAIT QC AFTER CONVERSION SLITTING. In case of lamination lot card, software will also ask, if output reel will be used for printing or not Back
31
QC after Conversion Slitting
With this module you will be able to Enter QC result of reels generated during coating. QC passed reels will be available for dispatch or printing planning Back
32
Printing lot card With this module you will be able to
During conversion slitting which ever reels were marked as ‘TO BE USED FOR PRINTING’ will be available here also exceptionally you can use other slitted reels. In this form you can enter all printing related information. Back
33
Pre-Printing status entry
With this module you will be able to There are various stages of printing process. With this module you can mark various activity mile stones which are prerequisite before printing. This will give us clear idea of where we are standing during printing process Back
34
Printing With this module you will be able to
Enter detail of input reels (which are linked with selected lot) Output reels generated during printing process. Printing material used during process. Back
35
QC after printing With this module you will be able to
Enter QC result of reels generated during coating. QC passed reels will have status WAIT DESPATCH Back
36
Inward Reels at Dispatch
With this module you will be able to Reels which passed QC after printing or lamination or coating will be available in this module. Box wise reel packing detail will be entered in this module. It will also have link with weighing scale and ability to get automatic weight. Back
37
Dispatch Reels With this module you will be able to
Final dispatch will be done at this stage. Packing slip will be printed and finally reel will be removed from our stock data. Back
38
Sales Return of issued reels
With this module you will be able to Enter returned reels SRV will be printed and reel stock will be updated. Back
39
Reel merging With this module you will be able to
Merge two reels and generate one reel It will also affect, reel wise stock. Back
40
Change Reel Status With this module you will be able to
If reel is moved further to next stage by mistake or any process is to be repeated for a specific reel, you can use this module. Back
41
Reports We will fix report formats before, software installation Back
42
Technical Information
Whole software is developed in .NET technologies and VB as code behind. Back End (Database) will be SQL Server 2005 (Express Edition) It will be Multiuser (LAN) version. Reports will be designed considering Laser/Inkjet printer and A4 size page size. Application will run on Windows 2003 (or higher) Server and Windows XP or higher OS. Application will run on windows platform Back
43
WIPRA WORLD WIDE A-1, SHREE LAXMI APPARTMENT, B/H. AXIS BANK, LAW GARDEN, AHMEDABAD – GUJARAT (INDIA). Contact : Website : Back
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.