LANGSAT TERMINAL (ONE) Tanjung langsat, pasir gudang, johor
Group Johor present EIA Auditing on : LANGSAT TERMINAL (ONE) Tanjung langsat, pasir gudang, johor UiTM Kampus Puncak Alam
2
SITI MASHALIDA BT JOHAR UiTM Kampus Puncak Alam
GROUP MEMBERS GROUP JOHOR LEADER : MOHD RUHAIZIE RIYADZI SECRETARY : NORADILLAH BT AB RAZAK TASK MANAGER : SITI AISYAH BT MAHADI SAFETY OFFICER : SITI MASHALIDA BT JOHAR UiTM Kampus Puncak Alam
3
UiTM Kampus Puncak Alam
Objectives GENERAL To measure and monitor the reading for several parameters in EMP of the LgT-1 for it compliances to the regulations /standards SPECIFIC Air quality monitoring Boundary noise exposures monitoring Water quality monitoring Public survey Qualitative Risk Assessment Recommendation OBJECTIVE UiTM Kampus Puncak Alam
4
UiTM Kampus Puncak Alam
LEGAL REQUIREMENT Guidelines for Environmental Noise, Limit and Control, DOE 2004 Environmental Quality Act (Industrial Effluents) Regulation 2009 LEGAL REQUIREMENT Environmental Quality Act, 1974 under Section 34A, Section 33(A) Environmental Quality (Prescribed Activities) (Environmental Impact Assessment) Order 1987 Malaysian Ambient Air Quality Guidelines DOE UiTM Kampus Puncak Alam
5
UiTM Kampus Puncak Alam
INTRODUCTION 1993: Tanjung Langsat Industrial Park (TLIP) EIA Tanjung Langsat Port EIA Tanjung Langsat Industrial Area EIA 2007: Langsat Terminal (One) (LgT-1) EIA LgT-1 EMP LgT-1 EA We are here UiTM Kampus Puncak Alam
6
Background (tlip) Petroleum, Gases & Oil Industries
Chemical Industries Steel Processing Industries Timber & Wood Proc. Industries Transportation Services
7
CENTRALISED TERMINALS Langsat Terminal (One) UiTM Kampus Puncak Alam
Background (LgT-1 ) Key facts : Capacity of 476,000m3 Land area: 40 acres 30 years concession 55% 45% CENTRALISED TERMINALS SDN BHD PUMA ENERGY ASIA PACIFIC BV (TRAFIGURA) USERS 80% 20% Global energy trader World’s 3rd largest independent oil trader Annual turnover of USD51 billion Assets above USD750 million 54 offices in 37 countries worldwide Langsat Terminal (One) TRAFIGURA PTE LTD TERM AGREEMENT Blending, Storage & Distribution of MIDDLE DISTILLATES & NAPHTHA FUEL OILS GASOLINE UiTM Kampus Puncak Alam
8
UiTM Kampus Puncak Alam
Background (LgT-1) Location Tanjung Langsat, Pasir Gudang, Johor Registered Land Owner Tanjung Langsat Port Sdn. Bhd. (a wholly owned subsidiary of Johor Corporation Bhd.) Land Lease Period 30 years Land Acreage 40 acres Jetty/Berth Owned by Tanjung Langsat Port 5 berths for coastal to Aframax-size vessel Buffer Zone 500 m surrounding Nearest Residential Area Kg. Tanjung Langsat (80 houses) – 2.5 km Kg. Perigi Acheh (90 houses) – 3.0 km UiTM Kampus Puncak Alam
9
UiTM Kampus Puncak Alam
Phase 1: Sept. 2009 7 storage tanks 130,000 m3 Gasoil & Naphtha Phase 2: April 2010 13 storage tanks 270,000 m3 Fuel Oil, Blend Stock & Gas Oil Phase 3: 3rd Qtr. 2011 12 storage tanks 76,000 m3 Gasoline & Biodiesel Background (LgT-1 ) Load/Unload Vessel to Tank Tank to Vessel Storage Blending Inter-tank Transfer Distribution Land Transsportation UiTM Kampus Puncak Alam
10
Middle Distillate Products & Naphtha Fuel Oil, Blend Stock & Gasoil
Background (LgT-1 ) PHASE 1: 130,000 m3 capacity Middle Distillate Products & Naphtha PHASE 2 : 270,000 m3 capacity Fuel Oil, Blend Stock & Gasoil LgT-2 PHASE 3 : 76,000 m3 capacity Gasoline & Biodiesel Future Tank Terminal LgT-3
11
Background (LgT-1 ) PLO 119 and PLO 120 Site For The Third Terminal
Proposed 2 New Berths TLP Oil Terminal Langsat Terminal (One) Langsat Terminal (Two) PLO 119 and PLO 120 Site For The Third Terminal UiTM Kampus Puncak Alam
12
UiTM Kampus Puncak Alam
LgT-1 Plant operation Middle-distillate Low sulphur diesel/gasoil Ultra-low sulphur diesel/gasoil Jet Fuel A-1 or kerosene Ultra-low sulphur Jet Fuel A-1/kerosene Naphtha UiTM Kampus Puncak Alam
13
UiTM Kampus Puncak Alam
LgT-1 Plant operation Fuel Oil & Blend Stocks Fuel Oil 380 cST Fuel Oil 180 cST Fuel Oil 120 cST Marine Diesel Oil (MDO) Liquid Diesel Oil (LDO) Decant Oil Marine Gasoil UiTM Kampus Puncak Alam
14
UiTM Kampus Puncak Alam
LgT-1 Plant operation Marine Loading Arm 2,000 MT/hr Middle-distillate Pump: 3 x 1,000 MT/hr 1,500 – 3,000 MT/hr depends on ship capability to received oil Ambient temp. No heat 3,000 MT/hr Ambient temp. No heat Atm. Pressure Tanks: 4 x 20,000 m3 ØT 37.4 m, HT m Ambient temp. No heat with Internal floating roof (not exceed lower explosive limit) UiTM Kampus Puncak Alam
15
UiTM Kampus Puncak Alam
LgT-1 Plant operation Marine Loading Arm 2 x 1,000 MT/hr Naphtha Pump: 3 x 1,000 MT/hr 1,500 MT/hr Ambient temp. No heat Small parcel 1,500 – 3,000 MT/hr Ambient temp. No heat Large parcel Atm. Pressure Tanks: 2 x 20,000 m3 ØT 37.4 m, HT m 1 x 10,000 m3 ØT 33.0 m, HT m Ambient temp. No heat with Internal floating roof (not exceed lower explosive limit) UiTM Kampus Puncak Alam
16
UiTM Kampus Puncak Alam
LgT-1 Plant operation Marine Loading Arm 2 x 2,000 MT/hr 2 x 2,500 MT/hr Fuel Oil & Blend Stocks 2, ,000 MT/hr 55°C – 60°C 1,000 – 3,000 MT/hr 55°C – 60°C Blending process: Pre-detect volume of source Air-Mixing System, Jet Mixer System Side Entry Mixer System Pump: 3 x 1,000 MT/hr, 2 x 750 MT/hr Pipeline: 1 x 3,000 – 4,000 MT/hr 2 x 2,500 MT/hr 2 x 1,000 MT/hr Atm. Pressure Tanks: 2 x 40,000 m3 ØT 54.0 m, HT m, 3 x 30,000 m3 ØT 48.0 m, HT m 3 x 20,000 m3 ØT 37.4 m, HT m, 3 x 10,000 m3 ØT 33.0 m, HT m 2 x 5,000 m3 ØT 22.8 m, HT m Without internal floating roof With internal hot oil heat exchange system (55°C) UiTM Kampus Puncak Alam
17
QUALITATIVE RISK ASSESSMENT
Hazards identification Fire & explosion Misconduct connection MLA Leakage Air crashes Lightning Fire & explosion Leakage Fire & explosion Leakage Petroleum Products Heat vapor Vehicle speed UiTM Kampus Puncak Alam
18
QUALITATIVE RISK ASSESSMENT
Hazards identification POOL FIRE (ignition of liquid spills) Air e Flammable vapor in the air layer above the liquid Liquid Ground e Absorb to the ground Substance flash point Fire/Explosion volume spilt fuel containment size burning rate UiTM Kampus Puncak Alam
19
QUALITATIVE RISK ASSESSMENT
Hazard/Risk Probability Severity Total Pool Fire 5 (Very High Freq.) 5 (Severe Fatality/Damage) 25 Tank/Pump/ Transmission Overpressure 3 (Moderate Freq.) 15 External fire & explosion (neighb.) 2 (Low Freq.) 4 (Fatality) 12 Vehicle Crashes 3 (Injury) 6 Earthquake/Natural Disaster 1 (Very Low Freq.) 5 (Severe Fatility/Damage) 5 Air Crashes Lightning Strike 4 (Fatality/Damage) 4 Risk Analysis of Six Potentially Hazardous Industrial Objects in the Rijnmond Area, A Pilot Study, 1981 Prelim. EIA of LgT-1, 2007. UiTM Kampus Puncak Alam
20
Air Quality Monitoring
UiTM Kampus Puncak Alam
21
Air Quality Monitoring
Source of Air Contaminant: Emission release from the tanks storage farm Vehicle/vessel exhaust emission Emission from two boiler stacks UiTM Kampus Puncak Alam
22
Air Quality Monitoring
Findings at Point A1: Same coordinate with Noise Monitoring Location N1 Parameter Measured Data Secondary Data Baseline Data Allowable Limits TSP µg/m3 (24 hours) 94.3 97.2 23.0 260 SO2 µg/m3 (1 hour) 17.2 ND 320 NO2 µg/m3 (1 hour) 350 VOC µg/m3 (30 minutes) N/A UiTM Kampus Puncak Alam
23
Air Quality Monitoring
Findings at Point A2: Same coordinate with Noise Monitoring Location N2 Parameter Measured Data Secondary Data Baseline Data Allowable Limits TSP µg/m3 (24 hours) 98.1 111.1 43.0 260 SO2 µg/m3 (1 hour) 19.7 ND 320 NO2 µg/m3 (1 hour) 20.8 350 VOC µg/m3 (30 minutes) N/A UiTM Kampus Puncak Alam
24
Air Quality Monitoring
Discussion: Increase reading in TSP compared to baseline. Current air quality condition Other industrial contribution All measurement are below the limit of MAAQG Maybe have slight significant health impact due to readings: Vision problems Respiratory disturbance Cancer UiTM Kampus Puncak Alam
25
Boundary Noise Exposure Measurement
26
Boundary Sound Exposure Measurement
Source of Noise: Source of Noise (Inside the Plant) Noise Exposures (Leq) measured 1m away, dB(A), 1 minutes Motor driven pumps 85 (84.3) Air compressors 85 (82.1) Boiler 90 (87.3) Nitrogen pigging operation involving venting 90 (89.2) Diesel engine driven pumps 110 (104.2) Road transport filling (RTF) 85 (82.3) UiTM Kampus Puncak Alam
27
Boundary Sound Exposure Measurement
Findings: Point Avg. Leq Measured Secondary Data (3rd Qtr) Baseline Data Allowable Limit Day Night N1 62.8 52.8 64.4 56.4 49.5 48.9 70 60 N2 58.0 48.1 54.0 46.6 60.2 53.1 Note: All data measured in dB(A) N1: N 01° 27’ 01.8” E 103° 59’ 48.4” N2: N 01° 26’ 51.6” E 104° 00’ 10.1” Average measurement involves 3 day of measurement. Allowable Limit based on The Planning Guidelines for Environmental Noise, Limit and Control, DOE 2004 UiTM Kampus Puncak Alam
28
Boundary Sound Exposure Measurement
Discussion : Data below the allowable limits Not effects nearest residential as the distance more than 2.0 km For workers: Sources of noise operated periodically (when need) Controlled by staff in Control Room Signboards/Warnings are shown at the area entrance PPE required UiTM Kampus Puncak Alam
29
WATER QUALITY MONITORING UiTM Kampus Puncak Alam
30
Water Quality Monitoring
Source of Water Contaminant: Rainfall and runoff Discharge/release of petroleum products due to accidental spills, leaks and releases in storage, process and transport Inappropriate disposal/storage of potentially hazardous materials on-site. UiTM Kampus Puncak Alam
31
Water Quality Monitoring
Findings: Parameters GW1 GW2 Allowable Limits 6/10/11 23/11/11 Temp. (°C) 29.61 28.70 29.21 28.40 40.0 pH 5.48 6.01 5.61 6.23 5.5 – 9.0 DO mg/l 3.61 3.66 2.91 3.15 BOD (20°C) mg/l N/A 3 2 40 COD mg/l 31 24 200 TSS mg/l 21 12 100 NH3-N mg/l ND 0.34 0.01 50 Oil & grease mg/l 10
32
Water Quality Monitoring
Discussion : All measurements below the limits COC filtered at CPI No record AOC happened – SOP/ERP followed Most source: OFW – rainfall & runoff UiTM Kampus Puncak Alam
33
UiTM Kampus Puncak Alam
CPI Discha CPI DISCHARGE UiTM Kampus Puncak Alam
34
UiTM Kampus Puncak Alam
PUBLIC SURVEY UiTM Kampus Puncak Alam
35
UiTM Kampus Puncak Alam
Public Survey Nov. 8 – 11, 2011 Involving 100 respondents from 2 nearest residential area: Kg. Tanjung Langsat (2.5 km to the north east) with 80 houses. Kg. Perigi Acheh (3.0 km to the north) with 90 houses. Randomly meet respondents (house to house, stall, with the permission of the village head). UiTM Kampus Puncak Alam
36
Demographic Background of The Respondents
Public Survey Demographic Background of The Respondents Location Kg. Tanjung Langsat Kg. Perigi Acheh Ages 1 to 10 11 to 20 21 to 30 31 to 40 41 to 50 51 to above Malay Male 2 3 14 Female 1 5 9 Chinese Indian Orang Asli Others JUMLAH 50
37
Public Survey
38
Public Survey
39
Public Survey
40
Public Survey
41
Public Survey
42
Public Survey
43
UiTM Kampus Puncak Alam
Non-Schedule Waste Discussion : Domestic waste only Schedule of disposal for domestic waste are periodically in every day to communal bins and every two days to the landfill. Arranged council municipal. UiTM Kampus Puncak Alam
44
UiTM Kampus Puncak Alam
Schedule Waste Discussion : Sources: Petroleum product filters Sludge from tank cleaning & operation Oily residue from the CPI Collected in a proper container and building before managed by Kualiti Alam/other competent contractors appointed by municipal council. UiTM Kampus Puncak Alam
45
UiTM Kampus Puncak Alam
Conclusion Environmental impacts are most-likely not significant due to the compliance to the limits in guideline/regulation. Vehicle crash commonly happened due to the road problems. Many holes found on the road due to heavy vehicle. Crash happened due to careless while driving and riding. Health impacts seems to be happened to the nearest residents – but the factors might also from their lifestyles, ages and working conditions (hypersensitivity, vision disturbance and hearing loss). UiTM Kampus Puncak Alam
46
UiTM Kampus Puncak Alam
REcomMendation Continue EMP as scheduled. ISO requirement: Treatment plant for discharge water. UiTM Kampus Puncak Alam
47
REFERENCES Environmental Impact Assessment (EIA) for Proposed Mixed Development ( Horizon Hills), Bandar Nusajaya, Johor 2. Environmental Quality Act and Regulations (ACT 127) 3. Department of Environmental , Procedure and Requirements in Malaysia, Ministry of Natural Resources & Environment, Malaysia (2007) 4. http// 5. En.Kassim Bin Mohamad, Pegawai Perancang, Majlis Perbandaran Pasir Gudang 7. Dr.Shahidan Bin Haron, Pegawai Kesihatan Epidemiologi ,PKJB 8. Mr.Osman Ahmad, HHSE Manager, Langsat Terminal One ,Johor