1
SESAME TL2 and SR Diagnostics
Hussein Al-Mohammad RF & DI Group SESAME-TAC 2016-Hussein Al-Mohammad 29/11/2016
2
Beam Diagnostic Systems
TL2 DI SR DI SESAME-TAC 2016-Hussein Al-Mohammad 29/11/2016
3
TL2 DI FS: All actuators are pneumatic from VAB. 4 Screens
In Air screens with 20mm screens (Al2O3). Basler acA1300-gm CCD Camera (IP, PoE, Triggered). Lens with variable focal length and iris. Camera support and mount are from Thorlabs. SESAME-TAC 2016-Hussein Al-Mohammad 29/11/2016
4
TL2 DI FCT: Bergoz FCT 2.5V/A sensitivity. In air type.
Simple bypass shield. Ceramic break to interrupt image current. Connected to oscilloscope Tektronix DPO5024. SESAME-TAC 2016-Hussein Al-Mohammad 29/11/2016
5
Beam Diagnostic Systems
TL2 DI SR DI SESAME-TAC 2016-Hussein Al-Mohammad 29/11/2016
6
SR-DI 1 FS 3 2 BPM 64 FCT 4 DCCT 5 V. SCR 6 SRM 7 SHK 8 BLM Items
Quantity 1 FS 3 2 BPM 64 FCT 4 DCCT 5 V. SCR 6 SRM 7 SHK 8 BLM BPM BPM BPM BPM Arc Chamber SESAME-TAC 2016-Hussein Al-Mohammad 29/11/2016
7
SR-DI/FS FS: 3 FS in Storage Ring.
1 Stepper motor FS, It’s have 2 positions for injection and 1st turn. 2 FS are pneumatic from VAB. In air screens. 20mm screens (Aluminum Oxide). Basler acA1300-gm CCD Camera (IP, PoE, Triggered). Lens with variable focal length and iris. Camera support and mount are from Thorlab. SR-FS (Pneumatic) SR-Injection FS (Motorized) SESAME-TAC 2016-Hussein Al-Mohammad 29/11/2016
8
SR-DI/FCT & DCCT FCT and DCCT:
2.5V/A sensitivity for FCT, 0.05V/mA for DCCT (200mA scale). Higher cutoff frequency for FCT 800MHz (Bergoz) due to big size of the core. Capacitance of the ceramic and beam shield optimized to meet FCT requirements . Beam Shield DCCT Sensitivity (200mA scale) Final Assembly FCT higher cutoff frequency SESAME-TAC 2016-Hussein Al-Mohammad 29/11/2016
9
SR-DI/FCT & DCCT FCT and DCCT: Share the outer shield and ceramic gap.
Soft Iron for outer shield. 2 layers of Mu metal. Both are tested in the Lab. DCCT tested in final location by test function from the electronics with the reading instrument DVM (Agilent 34410A) and controlled from control room. SESAME-TAC 2016-Hussein Al-Mohammad 29/11/2016
10
SR-DI/BPM BPMs: Libera Brilliance+. 12 Units installed in the SA
48/64 BPMs are connected to Libera Clock splitter from CAEN for MC and Trigger. Tested with the cables. SESAME-TAC 2016-Hussein Al-Mohammad 29/11/2016
11
SR-DI/BPM BPMs: TWS-240-FR-4R with an attenuation 5.3dB/100f.
Bundled cables (4 coaxial share one outer jacket) . SMA-M connectors from both sides ( Right Angle from BPM side). Foamed PE for dielectric and PVC for outer jacket. All cables are tested on Network analyzer (Attenuation, Phase, Group Delay and Impedance) before laying them in the ring. SESAME-TAC 2016-Hussein Al-Mohammad 29/11/2016
12
SR-DI/Shaker Beam Shaker: 2 Amplifiers (50W) installed in SR.
Bunch by bunch feedback kickers (Hor. & Ver.) will be used for shaker (beam exciter) == on the way to SESAME. Tektronix AFG3022C Arbitrary Function Generator DC-20MHz. SS-RF Switch to control the trigger for both amplifiers. V+ V- Dqk Z0 AMP Z0 SESAME-TAC 2016-Hussein Al-Mohammad 29/11/2016
13
SR-DI/ SRM SRM: Shift SRM location to cell 14 for diagnostics optical hutch in future Synchrotron Light Interferometer (double slit) and direct imaging SRM. Copper mirror on the way to SESAME. (Lead time from the manufacturer). Required optical components from Thorlabs are in the Lab. 3 Motors to align the mirror from control room. SESAME-TAC 2016-Hussein Al-Mohammad 29/11/2016
14
SR-DI/ SRM SRM: Mirror Stepper Motor Polarization filter & Double Slit
300mm Lens Bandpass Filter Motorized Filter Wheel Camera Lens Extension Tube CCD Camera SESAME-TAC 2016-Hussein Al-Mohammad 29/11/2016
15
SR-DI/BLM & SRM BLM: Deal with I-Tech was changed ! (8 BLD and 2 BLM).
Replace 7 BLD (1 BLM) with GDX modules for FOFB. So 32/64 BPM will be used for FOFB. 1 BLD and 1 BLM are in SESAME, It will be installed in injection section. The BLM system consists of the signal acquisition electronics (Libera BLM) and the detector. Each of the four input channels provides the power supply and gain control to the photo-multipliers (PMT). GDX Module SESAME-TAC 2016-Hussein Al-Mohammad 29/11/2016
16
SR-DI/Racks DI Racks: SESAME-TAC 2016-Hussein Al-Mohammad 29/11/2016
17
SR-DI/Summary DI instruments : FS in TL2 and SR are installed.
2 complete assemblies are done and tested. Waiting lenses to install the cameras. FCT and DCCT All CT’s and their champers and shield are installed and tested. BPMs All BPMs cables are connected and tested. Libera’s are connected to the assigned BPMs and tested. Shaker Kickers are on the way. Amplifiers tested and trigger circuit as well. SRM Mirror on the way to SESAME. Motors ordered. All optical components are in lab. BLM 1 BLM and 1 BLD to be installed next week. Scrapers Installed , to be tested with motion control crates once it’s ready. SESAME-TAC 2016-Hussein Al-Mohammad 29/11/2016
18
SESAME-TAC 2016-Hussein Al-Mohammad
29/11/2016