Assignment ‘1’ Project Management By SAJJAD KHUDHUR ABBAS – P81540

2 KK6024 Project Management Assignment 1 Using internet, find a profile of an engineering consultancy company. Prepare a presentation on this company focusing on the following points: Describe the organizational structure Describe some of the major projects undertaken by this company Describe the specific expertise available in the company and how it is being used in the projects being carried out The following documents are provided as attached. MLNG DUA DEBOTTLENECKING PROJECT Practice Standard for Work Breakdown Structure Based on document (i), prepare a ppt presentation on the following for the MLNG Debottlenecking project: Project scope Project Deliverable Proposed Work Breakdown Structure (WBS)

3 Q1 in Assignment 1 Khatib & Alami (K&A) is a multidisciplinary urban and regional planning, architectural and engineering consulting company. With a history of success and a network of branches and sister companies, they provide with an integrated approach to reliable project delivery in the evolving globalized world.

4 Organizational structure
Q1 in Assignment 1 Organizational structure

5 The Fields of The Company
Q1 in Assignment 1 The Fields of The Company ARCHITECTURE -Hospitality -health care -educational -commercial & retail ENVIRONMENTAL - Water resources management - Surface Water & Flood Mitigation - Solid Waste Management - Environmental Impact Assessment

6 Transportation Planning Railway Engineering Airport Engineering
Q1 in Assignment 1 TRANSPORTATION Traffic Engineering Transportation Planning Railway Engineering Airport Engineering ELECTRICAL UTILITIES Lighting Building Conveying Systems Utility Management

7 The Fields of The Company
Q1 in Assignment 1 The Fields of The Company

8 Projects 1- Storage and Warehouse Building at Al Rayan Sports Club
Client - Qatar National Olympic Committee Project Overview - Construction Cost: USD 20 Million Total Area: 70,351 m² Completion Date:  Location: Doha – Qatar Engineering Services – Design Project Description - The project consists of a single-floored, pre-engineered metal building structure serving as a main storage and warehouse facility, surrounded internally on three sides by 32 mini storage spaces . It also includes labor accommodation building, auction and open storage areas. The built-up area is approximately 70,351 m². Q1 in Assignment 1

9 2- Project Name - Siblin Cement Factory
Q1 in Assignment 1 2- Project Name - Siblin Cement Factory Client - Siblin Cement Company Project Overview - Construction Cost: USD 50 Million Total Area: 65,000 m² Completion Date:  Location: Siblin – Lebanon Engineering Services - Design & Construction Supervision Project Description - The project consists of a building block made up of 2 basement levels housing the MEP services, shops and 785 car parking spaces; a ground floor with an entrance hall, a commercial area, a cafeteria and MEP service rooms; four podium floors dedicated to retail units with an additional car parking; and 28 office floors that provide open-plan office spaces. The fifth floor, a podium roof level, features recreational facilities including a health-club, a gymnasium, a cafeteria and a business center. The scope of work includes external works such as hard paving, landscaping and utilities infrastructure.

10 Q1 in Assignment 1 Khatib & Alami (K&A) creates, designs, supervises and manages projects that have the potential to better society. They build on their proven multidisciplinary expertise and offer regional urban planning and comprehensive architectural and engineering consulting services. K&A focuses on delivering innovative solutions that meet clients' real needs.

11 Q1 in Assignment 1 They covering a broad spectrum of disciplines from architecture to urban, transportation, energy, water, and oil & gas projects. They enhance infrastructure, create new buildings, develop neighborhoods, and reshape entire cities.

12 Project scope Scope statement :
Q 2 in Assignment 1 Project scope Scope statement : Produce 7.8 MTPA Sub cooled LNG at approximately -161 C which rundown directly to storage and it has three modules Constraints : The contractor carried out a ±15 % cost estimate for the project to enable the final investment (FID) to be made . Assumptions : the following options were considered for refrigeration downstream of MCHE Simple end flash unit Extended end flash unit Nitrogen cycle

13 Q 2 in Assignment 1 Historical Informations : MLNG Dua, completed in 1995, uses gas turbine drivers for the main refrigerant compressors, and hybrid sea water and air cooling.

14 Q 2 in Assignment 1 Project Charter

15 Objectives : to increase production capacity by approximately 20%
Q 2 in Assignment 1 Deliverables Background : This project aims to produce sub cooled LNG at approximately -161 °C which is rundown directly to storage. Utilities are provided by adjacent facilities . Objectives : to increase production capacity by approximately 20% Benefits : deliver an economically and technically feasible approach to delivering increased LNG output from Petronas’ MLNG Dua facility to meet the growing demand for LNG

16 Success Criteria

17 MLNG DUA De-Bottlenecking
Q 2 in Assignment 1 MLNG DUA De-Bottlenecking Engineering Procurement Construction Mobilization Complete/Review BDEP Early Engineering Prepare Estimate PEFS ISO production Substantially Complete Engineering Start on site Civil Mech. E & I Painting & Insulation RFSU Module 6 RFSU Module 4 RFSU Module 5 Pre-Commissioning /Commissioning Shutdowns Enquiry Deliverables Place PO long lead items Place PO rest equipment Place PO bulks PO long lead items Rest equipment Bulks ‘Work Breakdown Structure (WBS)’

18 Thank You


Download ppt "By SAJJAD KHUDHUR ABBAS – P81540"

Similar presentations


Ads by Google