Download presentation
Presentation is loading. Please wait.
1
Facilities Planning & Construction
Society for Marketing Professional Services Doing Business with Facilities Planning & Construction Lee Dulgeroff Executive Director Facilities Planning & Construction November 13, 2013
2
Outline Proposition S: $2.1 Billion, Prop. Z: $2.8 Billion
• Facilities Planning & Construction – Proposition S: $2.1 Billion, Prop. Z: $2.8 Billion • Capital Improvement Program Progress Business Outreach Program & Goals What We Buy Bidding on San Diego Unified Contracts – Professional Services Construction • Tracking Bids and Solicitation Business Outreach Contacts
3
Prop. S & Z School Facilities Bond Program
San Diego Unified Facilities – 14.9M square feet of buildings – Average age 43 years Bond Program • • $2.1 and $2.8 billion general obligation bond measures Repair, renovate and revitalize 181 schools • – School facility renovation and modernization New facilities Technology upgrades Safety/security, ADA compliance Repair infrastructure Energy efficiency • Projected completion: 2032 Jonas Salk Elementary School groundbreaking
4
Capital Program Progress Major construction projects
• 36 in design & bid phase $245M ies • 24 in construction $200M 64 completed $242M − 17 Career Technical Education facilit − 6 new classroom buildings − 4 high school stadiums (rebuilt) − 11 synthetic turf fields and all-weather tracks − 5 air conditioning projects − 16 modernization/upgrades New Classroom Building at Language Academy
5
i21 Program • • 21st • • • $43,514,717 of new funds approved i21
interactive classroom and technology infrastructure 21st century technology to classrooms (infrastructure and equipment) − $182M completed − $61M in progress Five-year interactive classroom phased plan began in 2009 Progress to date: − 4,432 Promethean boards installed − 5,934 teacher tablets distributed − 120,228 student devices purchased Maximizing E-rate funds • $43,514,717 of new funds approved • • • i21 classroom at Dana MS in 2013 5
6
Classroom Air Conditioning • Project Plan – Five school regions
Two-year plan to install air conditioning district’s 2,000 hottest classrooms in the • Project Plan – Five school regions o IDIQ contracts o 68 traditional schools (8 during whole site modernization) and 10 charter schools Nurses’ offices Indoor assembly areas Other critical spaces
7
programs Business Outreach Program • Promote doing business with SDUSD
Inform contractors and construction-related consultants, vendors, suppliers and manufacturers Engage local, emerging business enterprises Engage the traditionally underrepresented Connect stakeholders, contractors, work programs Special focus on target areas • •
8
Small Business Program
• Certifications recognized by SDUSD – California Department of General Services (DVBE, SBE) Department of Veterans Affairs Center for Veterans Enterprise (SDVOB verification) California Unified Certification Program (DBE) City, County or Local Agency Certifications – – • Self-certify with SDUSD (except DVBE)
9
Emerging Business Enterprises (EBEs) 40% Business Classification 2013
EBE Goals* Overall EBE Goal Disabled Veteran-Owned Business Enterprise (DVBE)** Minority-Owned Business Enterprise (MBE) Women-Owned Business Enterprise (WBE) Small Business Enterprise (SBE) 40% 4.5% 6.0% 3.0% 30% *Some firms have multiple EBE certifications; total EBE goal is not the sum of the EBE categories **3% DVBE participation required on all construction contracts
10
What We Buy & How Materials and Supplies
• Products and services – Materials and Supplies • Office supplies, foodstuffs, textbooks, school equipment, software, computers, etc. materials, school – Capital Improvements and Maintenance • Construction: design-bid-build (lowest bidder) – Micro-Projects Program (EBEs only; informal bid) Professional services: solicitations (best value) Non-construction goods (public bid, multiple award • schedules)
11
Successful Bidding the services • Responsive Bidder Responsible Bidder
– Adhere to all bid requirements • Execute all required documents • Meet specified timelines Responsible Bidder – Competent/qualified to perform – Financially sound • the services • Capable of bonding for project value (const.) Lowest bidder (const.) •
12
Contracting Opportunities
Professional Services 2014 • • Architects Landscape architects Mail services • (TBD) • Kitchen designer services Engineering (civil, electrical, structural) geotechnical, mechanical, • Environmental engineering (CEQA and assessments) Staff augmentation services
13
2012 Results: Professional Services
TOTAL Professional Services Dollars Awarded $124,355,482 (Cumulative since Jan. 2009) Emerging Business Enterprise (EBE) Classification $ % Disabled Veteran Business Enterprise (DVBE) $3,863,853 3.11% Minority-Owned Business Enterprise (MBE) $10,213,866 8.21% Women-Owned Business (WBE) $17,238,233 13.86% Small Business Enterprise (SBE) $15,625,400 12.57% TOTAL Dollars Awarded to Date to EBE $35,868,785 28.84%
14
Contracting Opportunities
Construction 2014 • • Athletic Facility upgrades ($1.5M – 15M ea) New buildings/career tech facilities ($1-5M ea) Facility minor remodels and Whole site modernizations (WSM) ($.2-16M ea) • • WSM projects ($1M-$5M; $5M-10M ea) Classroom technology upgrades ($25M annually) New buildings ($1M-$5M ea) Athletic field and related upgrades ($5M-$10M ea)
15
Funded by Prop. S & Z bonds Project Stabilization Agreement •
Approved July 2009 Covers construction projects: – Funded $1M or by Prop. S & Z more by state school construction bonds • Advertisements state if PSA applies Offer training workshops
16
2012 Results: Construction
TOTAL Construction Dollars Awarded $121,010,647 Emerging Business Enterprise (EBE) Classification $ % Disabled Veteran Business Enterprise (DVBE) $10,581,102 8.74% Minority-Owned Business Enterprise (MBE) $18,770,994 15.51% Women-Owned Business (WBE) $1,762,985 1.46% Small Business Enterprise (SBE) $41,272,974 34.11% TOTAL Dollars Awarded to Date to EBE $48,397,006 39.99%
17
Tracking Bids & Solicitations Get on the database Online media
– Get on the database • Complete self-certification form Advertising media – • San Diego Daily Transcript San Diego Monitor News and Business Contractor News &Views Journal – Online media • Procurement site: DemandStar.com LinkedIn.com: District Outreach page:
18
Business Outreach Contacts
• Karen Linehan: – Alma Bañuelos: – •
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.