Presentation is loading. Please wait.

Presentation is loading. Please wait.

Facilities Planning & Construction

Similar presentations


Presentation on theme: "Facilities Planning & Construction"— Presentation transcript:

1 Facilities Planning & Construction
Society for Marketing Professional Services Doing Business with Facilities Planning & Construction Lee Dulgeroff Executive Director Facilities Planning & Construction November 13, 2013

2 Outline Proposition S: $2.1 Billion, Prop. Z: $2.8 Billion
Facilities Planning & Construction Proposition S: $2.1 Billion, Prop. Z: $2.8 Billion Capital Improvement Program Progress Business Outreach Program & Goals What We Buy Bidding on San Diego Unified Contracts Professional Services Construction Tracking Bids and Solicitation Business Outreach Contacts

3 Prop. S & Z School Facilities Bond Program
San Diego Unified Facilities – 14.9M square feet of buildings – Average age 43 years Bond Program $2.1 and $2.8 billion general obligation bond measures Repair, renovate and revitalize 181 schools School facility renovation and modernization New facilities Technology upgrades Safety/security, ADA compliance Repair infrastructure Energy efficiency Projected completion: 2032 Jonas Salk Elementary School groundbreaking

4 Capital Program Progress Major construction projects
• 36 in design & bid phase $245M ies 24 in construction $200M 64 completed $242M − 17 Career Technical Education facilit − 6 new classroom buildings − 4 high school stadiums (rebuilt) − 11 synthetic turf fields and all-weather tracks − 5 air conditioning projects − 16 modernization/upgrades New Classroom Building at Language Academy

5 i21 Program • • 21st • • • $43,514,717 of new funds approved i21
interactive classroom and technology infrastructure 21st century technology to classrooms (infrastructure and equipment) − $182M completed − $61M in progress Five-year interactive classroom phased plan began in 2009 Progress to date: − 4,432 Promethean boards installed − 5,934 teacher tablets distributed − 120,228 student devices purchased Maximizing E-rate funds • $43,514,717 of new funds approved i21 classroom at Dana MS in 2013 5

6 Classroom Air Conditioning • Project Plan – Five school regions
Two-year plan to install air conditioning district’s 2,000 hottest classrooms in the Project Plan – Five school regions o IDIQ contracts o 68 traditional schools (8 during whole site modernization) and 10 charter schools  Nurses’ offices  Indoor assembly areas  Other critical spaces

7 programs Business Outreach Program • Promote doing business with SDUSD
Inform contractors and construction-related consultants, vendors, suppliers and manufacturers Engage local, emerging business enterprises Engage the traditionally underrepresented Connect stakeholders, contractors, work programs Special focus on target areas

8 Small Business Program
Certifications recognized by SDUSD California Department of General Services (DVBE, SBE) Department of Veterans Affairs Center for Veterans Enterprise (SDVOB verification) California Unified Certification Program (DBE) City, County or Local Agency Certifications Self-certify with SDUSD (except DVBE)

9 Emerging Business Enterprises (EBEs) 40% Business Classification 2013
EBE Goals* Overall EBE Goal Disabled Veteran-Owned Business Enterprise (DVBE)** Minority-Owned Business Enterprise (MBE) Women-Owned Business Enterprise (WBE) Small Business Enterprise (SBE) 40% 4.5% 6.0% 3.0% 30% *Some firms have multiple EBE certifications; total EBE goal is not the sum of the EBE categories **3% DVBE participation required on all construction contracts

10 What We Buy & How Materials and Supplies
Products and services Materials and Supplies • Office supplies, foodstuffs, textbooks, school equipment, software, computers, etc. materials, school Capital Improvements and Maintenance Construction: design-bid-build (lowest bidder) – Micro-Projects Program (EBEs only; informal bid) Professional services: solicitations (best value) Non-construction goods (public bid, multiple award schedules)

11 Successful Bidding the services • Responsive Bidder Responsible Bidder
– Adhere to all bid requirements • Execute all required documents • Meet specified timelines Responsible Bidder – Competent/qualified to perform – Financially sound the services • Capable of bonding for project value (const.) Lowest bidder (const.)

12 Contracting Opportunities
Professional Services 2014 Architects Landscape architects Mail services (TBD) Kitchen designer services Engineering (civil, electrical, structural) geotechnical, mechanical, Environmental engineering (CEQA and assessments) Staff augmentation services

13 2012 Results: Professional Services
TOTAL Professional Services Dollars Awarded $124,355,482 (Cumulative since Jan. 2009) Emerging Business Enterprise (EBE) Classification $ % Disabled Veteran Business Enterprise (DVBE) $3,863,853 3.11% Minority-Owned Business Enterprise (MBE) $10,213,866 8.21% Women-Owned Business (WBE) $17,238,233 13.86% Small Business Enterprise (SBE) $15,625,400 12.57% TOTAL Dollars Awarded to Date to EBE $35,868,785 28.84%

14 Contracting Opportunities
Construction 2014 Athletic Facility upgrades ($1.5M – 15M ea) New buildings/career tech facilities ($1-5M ea) Facility minor remodels and Whole site modernizations (WSM) ($.2-16M ea) WSM projects ($1M-$5M; $5M-10M ea) Classroom technology upgrades ($25M annually) New buildings ($1M-$5M ea) Athletic field and related upgrades ($5M-$10M ea)

15 Funded by Prop. S & Z bonds Project Stabilization Agreement •
Approved July 2009 Covers construction projects: Funded $1M or by Prop. S & Z more by state school construction bonds Advertisements state if PSA applies Offer training workshops

16 2012 Results: Construction
TOTAL Construction Dollars Awarded $121,010,647 Emerging Business Enterprise (EBE) Classification $ % Disabled Veteran Business Enterprise (DVBE) $10,581,102 8.74% Minority-Owned Business Enterprise (MBE) $18,770,994 15.51% Women-Owned Business (WBE) $1,762,985 1.46% Small Business Enterprise (SBE) $41,272,974 34.11% TOTAL Dollars Awarded to Date to EBE $48,397,006 39.99%

17 Tracking Bids & Solicitations Get on the database Online media
Get on the database • Complete self-certification form Advertising media San Diego Daily Transcript San Diego Monitor News and Business Contractor News &Views Journal Online media Procurement site: DemandStar.com LinkedIn.com: District Outreach page:

18 Business Outreach Contacts
Karen Linehan: Alma Bañuelos:


Download ppt "Facilities Planning & Construction"

Similar presentations


Ads by Google