1 Technical Information on How the Planning Run Works: Contents
Steps in the MRP run Control parameters in the material master, in the BOM and in Customizing for MRP Net requirement calculation Lot-size calculation Scheduling BOM explosion and routing selection

2 MRP in SAP SEG 7420 on 13 Mar 2003

3 Technical Information on How the Planning Run Works: Unit Objective
At the conclusion of this unit, you will be able to: Explain the individual steps of the MRP run Explain and apply the most important parameters for the MRP run configuration and their combinations.

4 Course Overview

5 Steps in the Planning Run

6 Net Requirement Calculation

7 Net Requirements Calculation in MRP

8 Net Requirements Calculation - Process

9 How to Deal with Unforeseen Developments in Requirement Quantities?
Safety stock Safety stock partially available Dynamic safety stock Safety time

10 Safety Stock Reqmt Receipt

11 Safety Stock Partially Available
Reqmt Receipt

12 Range of Coverage Profile / Dynamic Safety Stock (1)

13 Range of Coverage Profile / Dynamic Safety Stock (2)

14 Range of Coverage Profile: Intervals

15 Safety Time Reqmt Receipt

16 Safety Time in Multi-Level Production

17 Lot-Size Calculation

18 Overview of Lot-Sizing Procedures

19 Static Lot-Sizing Procedures

20 Period Lot-Sizing Procedures

21 Lot Sizing According to Planning Calendar

22 Optimum Lot-Sizing Procedures

23 Long-Term Lot Size Reqmt Receipt

24 Planning Run Executed Regularly
Today Reqmt Receipt

25 Scheduling

26 Overview of the Procurement Types
Special procurement types

27 Backward Scheduling

28 Forward Scheduling for In-House Production

29 Scheduling in Production Planning

30 Order Data for Basic Scheduling

31 Lead Time Scheduling

32 Scheduling / In-House Production Time

33 Order Dates for Lead Time Scheduling

34 Changing Dependent Requirement Dates

35 BOM Explosion

36 BOM Explosion

37 BOM Selection

38 Selection of Alternative BOM

39 Order Quantity (Lot Size)

40 Explosion Data - Customizing

41 Explosion Date

42 Explosion Date using the Order Finish Date

43 Explosion Using the BOM Explosion Number
Gross Date

44 Production Versions

45 Defining the Change Status Using the Order Start Date

46 Defining Change Status Using the Order Finish Date

47 Defining Change Status Using BOM Explosion Numbers
Gross Date

48 Route Selection

49 Technical Information on How the Planning Run Works: Summary (1)
The steps of material requirement planning consists if net requirements calculation, determining the procurement type, scheduling and the BOM explosion. The net requirements calculation determines the available quantity for planning. The lot-sizing procedures and the procurements type are assigned in the material master.

50 Technical Information on How the Planning Run Works: Summary (2)
Basic scheduling or the lead time scheduling are two possible scheduling types in MRP. The BOM selection is influenced by the selection ID, the alternative selection indicator and the selection of the explosion date.


Download ppt "Technical Information on How the Planning Run Works: Contents"