1 PRESENTATION for future Partners

2 About us Promona UAB was established in 2014 and specializes in oil and gas industry planning and installation. OIL INDUSTRY FOOD INDUSTRY HEAT PRODUCTION & SUPPLY INDUSTRY ELECTRICITY GENERATION INDUSTRY GAS SUPPLY/DISTRIBUTION INDUSTRY CHEMICAL INDUSTRY AND OTHER INDUSTRIES

3 PROJECTS

4 Projects AB ORLEN Lietuva CDU 2014
(Crude Distillation Unit) 2014 (pipeline mounting ~16.000WEI, steel structures ~ 240t) AB ORLEN Lietuva Vacuum flasher unit heat exchangers Nr.4, 7, 8 EPC contract (pipeline mounting WEI, steel structures ~ 100t, new equipment installation ~90t) 2015

5 Projects AB Kaunas Power Plant 2015
Diesel fuel storage EPC contract (pipeline mounting 8.000WEI, steel structures ~ 15t, new equipment installation ~ 10t) AB LNG “Independence“ 2016 Terminal (steel structures ~ 300t) and others

6 CDU (Crude Distillation Unit)

7 PENEX Isomerization unit
Heatexchanger E100

8 PPF Cleaning section

9 Heatexchanger TK-4 Vacuum flasher unit

10 TK-7 Heatexchanger TK-7 Vacuum flasher unit

11 Process tower K-3 vacuum flasher unit ON-GOING PROJECT

12 SERVICES

13 Installation, maintenance and servicing of static equipment
PIPING SYSTEMS PRESSURE VESSELS PROCESS TOWERS, REACTORS HEATING/COOLING EQUIPMENT

14 Pressure vessels and heatexchangers:
Piping systems: Pressure vessels and heatexchangers: • Fabrications of piping spools • Installation of new piping • Refurbishment and modification • Tests • Installation • Preparation of piping for inspection • Installation of internal equipment • Repair of existing piping • Preparation for inspection Welding: • Repair, dismantling of existing vessels, tanks • Carbon steel • Inspection • Chrome molybdenum steel • Stainless steel • Duplex and superduplex

15 Process towers, reactors:
• Dismantling/Installation • Installation of internal equipment • Preparation for inspection • Inspection • Repair of existing towers, reactors

16 Heating/cooling equipment
• Modification • Installation • Preparation for inspection • Hydraulic/pneumatic tests

17 PROJECT MANAGEMENT

18 Project management The main proposed service is the execution
of the project by EPC template. Scope of service: ENGINEERING • Pumps, heatexchangers, process towers, drums installation PROCUREMENT • Civil works • Process and power pipings CONSTRUCTION • Instrumentation and electrical

19 Engineering The discipline of engineering is extremely broad,
and encompasses a range of more specialized fields of engineering, each with a more specific emphasis on particular areas of applied science, technology and types of application.

20 Procurement Almost all purchasing decisions include factors
such as delivery and handling, marginal benefit, and price fluctuations. Procurement generally involves making buying decisions under conditions of scarcity.

21 Construction Large-scale construction requires collaboration
across multiple disciplines. An architect normally manages the job, and a construction manager, design engineer, construction engineer or project manager supervises it.

22 PROCESS OF PROJECT

23 Process of proect by EPC template
Process of project 1. Ordering project 2. Ordering materials 3. Choosing executer 0 month 1st month 2th month 4th month 5th month 6th month 7th month 8th month 11th month Start of the project Tender for design Choosing tender‘s winner Designing the project Tender for materials Material delivery Tenderfor executors Choosing tender‘s winner Executor‘s deadline Process of proect by EPC template 0 month 1st month 2th month 7th month A total of 7 montths of execution of the project and for the investment payback. Start of the project Tender for executors Choosing tender‘s winner Executor‘s deadline Benefits: A total of 11 months of execution of the project and for the investment payback. • Project implementation problems are solved by executor • Orderer coordinate project with only one executor • Executor are responsible for expenses of problems

24 DESIGN

25 In total Promona has designed
About 500 process and power piping in the oil and gas industry (nominal pipeline diameter from NS to 800mm, designed for temperatures of up to 500C and pressures of up to 70 barg). About 3,000 tons of steel structures for pressure vessels, reactors, heat exchangers, etc., including concrete foundations for pressure vessels, heat exchanger, etc. About 30 modifications to increase the effectiveness and productivity of pressure equipment, heat exchangers, furnaces and reactors.

26 SAFETY

27 Safety Our company‘s policy- meeting the highest safety standards

28 CONTACTS

29 Grigorijus Vasilavičius
Contacts Grigorijus Vasilavičius Managing director