1
Welcome NTPC Delegates
to Himachal Pradesh
2
Business Partner Meet - 2008
Power Sector Development in Himachal Pradesh Business Partner Meet A presentation by HP STATE ELECTRICITY BOARD June 11th, Venue: Holiday Home, Shimla
3
Contents Existing system of HPSEB Turnaround Strategy Ongoing Schemes
Hydro Power Development New Initiatives Scopes for Joint Venture with NTPC
4
Inception – HP State Electricity Board
Himachal is a hilly State with a population of around 66 lakh and the area of around Sq km The HPSEB was constituted on 1st day of September 1971 and since then it is responsible for coordinated development of Power potential, Generation, Transmission & Distribution of electricity within the State. The Board carries out this task through the various functional agencies
5
Existing Systems of HPSEB (As on 31 March 2008)
Power System Installed Capacity MW Villages Electrified Consumers Connected lakh Connected Load kW EHV Sub-Stations 36 Nos. Distribution Sub-Stations HT Lines ckt kM LT Lines ckt kM A State Load Dispatch Center (SLDC) with latest state of art has been established to have online control and transaction of electricity Minimum Fatal/ Non-fatal Accidents Minimum Transformer Failure
6
Major Achievements First hilly State in the country to achieve 100% electrification of the villages in 1988 Highest household coverage ratio in the country. This distinction is unique as geographic & demographic conditions are very stringent in the State as about 91.8% population resides in villages with altitude varying from 350 to 4900 mts. Electrification of highest inhabited village in the World i.e. Comic feet Construction of Power House at the highest altitude in the World (Rongtong Power House)
7
Major Achievements Unique distinction of 100% metering, billing and collection Lowest AT & C Losses (15.15%) in the country Lowest Tariff in the country 100% utilisation of funds provided by GOI under APDRP Above all no free electricity to any category of consumers
8
Ongoing Projects/Schemes
Schemes under central assistance/ grant/ loan for T&D, RE, SI & RM of projects APDRP RGGVY REC PFC PMGY MNES Transmission plan & its implementation strategy Hydro Power Development New IT Initiatives
9
T&D Losses (in % age)
10
Category wise Consumers (in % age As on March, 2008)
11
Category wise consumption (in % age, Utilization pattern in MU as on March, 2008)
12
Hydro potential of H.P. as % of country’s potential
(IN MW) Total Power Potential = 1,40,000 At 60% load factor = 84,000 Basin wise potential In H.P. Yamuna basin = Sutlej basin = Beas basin = Ravi basin = Chenab basin = Mini micro = Projects Total = At 60 % Load factor =
13
Identified Hydro Potential in HP Basin
2251 MW Chenab basin MW Ravi basin MW Beas basin MW Sutlej basin MW Yamuna basin
14
Hydro Potential of H.P. Harness Plan (during 11th & 12th plan) (in MW)
State Sector/ HPPCL Central/ Joint Sector Private Sector Through Himurja Total
15
Potential harnessed so far by different agencies in H.P. (in MW)
HPSEB Central/ Joint Sector Private Sector More than 5 MW Less than 5 MW 34 Total
16
Capacity under execution by Different Agencies in HP
(In MW) HPPCL HPSEB Central/ Joint Sector Private Sector Total
17
Scheduled Commissioning Date
On going projects at present with HPSEB planned for commissioning during 11th plan period HPSEB Beas 6.6 Khauli-II 4 121.1 Total Sutlej Basin March 2010 100 Uhl Stage-III 3 During 4.50 Bhaba Augmentation 2 During 10 Ganvi Stage-II 1 Scheduled Commissioning Date Implementing Agency Capacity (MW) Name of Project Sr. No.
18
H.P. Hydro Power Status (In MW)
Total identified potential Harnessed so far Under execution/Allotment To be allotted Under Investigation Abandoned Himurja Projects (43.75 in operation)
19
Hydro Potential of H.P. Harness Plan (during 11th & 12th plan) (in MW)
State Sector/ HPPCL Central/ Joint Sector Private Sector Through Himurja Total
20
Potential harnessed so far by different agencies in H.P. (in MW)
HPSEB Central/ Joint Sector Private Sector More than 5 MW Less than 5 MW 34 Total
21
Capacity under execution by Different Agencies in HP
(In MW) HPPCL HPSEB Central/ Joint Sector Private Sector Total
22
PROJECTS UNDER EXECUTION/ALLOTTED AND PLANNED FOR 11TH PLAN PERIOD
S.N. Name of Project Name of Basin Installed capacity(MW) 1 Bhaba Aug PH Satluj 4.5 2 Kashang-I 130 3 Kashang-II 65 4 Kashang-III 48 5 Ganvi-II 10 6 Shongtong Karcham 402 7 Uhl-III Beas 100 8 Sainj 9 Khauli-II 6.6 Sawra Kuddu Yamuna 111 11 Chirgaon Majhgaon 46 12 Dhamwari Sunda 70 13 Renuka 40 Total 1133.1 ` CENTRAL / JOINT SECTOR Chamera-III Ravi 231 Kol-Dam 800 Rampur 412 Parbati-II Parbati-III 520 2763
23
PROJECTS UNDER EXECUTION/ALLOTTED AND PLANNED FOR 11TH PLAN PERIOD
S.N. Name of Project Name of Basin Installed capacity(MW) C. PRIVATE SECTOR: 1 Allain Duhangan Beas 192 2 Malana-II 100 3 Patikari 16 4 Neogal 15 5 Lambadug 25 6 Baragaon 11 7 Fozal 9 8 Baner-II Tidong-I Satluj 10 Sorang Karcham Wangtoo 1000 12 Raura 13 Paudital Lassa Yamuna 24 14 Tangnu Romai 50 Sai Kothi Ravi 17 Harsar 60 Bharmour 45 18 Budhil 70 Total 1848 Total:A+B+C: 5744.1
24
Installed capacity(MW)
Projects which have been alloted/under process of allotment and expected to yield benefit during the 12th Plan period S.N. Name of Project Name of Basin Installed capacity(MW) Remarks A CENTRAL /JOINT SECTOR 1 Khab-I Satluj 450 Allotted to SJVNL 2 Khab-II 186 3 Luhri 750 4 Parbati-I Beas Allotted to NHPC Total: 2136 B PRIVATE SECTOR Chanju-I Ravi 25 Allotted Chanju-II 17 Bara Banghal 200 Bajoli-Holi 180 5 Kuther 260 6 Suil 13 Under process of allotment 7 Sal-I 6.5 8 Bardang Chenab 126 9 Chattru 108 10 Miyar 90 11 Tinget 81 12 Teling 69 Tandi 104
25
Installed capacity(MW)
Projects which have been alloted/under process of allotment and expected to yield benefit during the 12th Plan period S.N. Name of Project Name of Basin Installed capacity(MW) Remarks B PRIVATE SECTOR 14 Rashil Chenab 102 Under process of allotment 15 Gondhala 144 16 Khoksar 90 17 Ropa Satluj 60 18 Mane Nadang 70 19 Lara 20 Bahairari 5.5 Allotted 21 Chango Yangthang 140 22 Yangthang Khab 261 23 Sumta Kathang 130 24 Kut 25 Tidong-II 26 Jangi thopan 480 27 Thopan Porari 28 Kilhi-Balh Beas 7.5 29 Dhaula-Sidh 40 30 Shalvi Yamuna 7 31 Rupin 39 Total: 3479.5 TOTAL (A+B) 5615.5
26
OUR OFFER SELI (545 MW) GY SPA (170 MW) DUGGAR (238 MW) LARA SUMTA
KULING LARA (40 MW) SACH (149 MW) REOLIDUGHI (268 MW) MANA (70 MW) TINGET (81 MW) KHOKSAR (90 MW)
27
Demand and Supply Scenario (in MU)
Total Winter Summer -439 -1088 649 1156 -15 1171 Surplus (+) /Shortage (-) 6939 3039 3900 5992 2616 3376 Requirement within State 6500 1951 4549 7148 2601 4547 Total Availability Free Power 4635 1624 3011 5197 2169 3028 Purchase 1865 327 1538 432 1519 Own generation Actual Description
28
Turnaround Strategy Expeditious completion of ongoing schemes without cost & time overruns. Increased own generation by way of capacity additions and better performance. Additional availability of power by way of State owned generation Further reduction in T&D losses. Less purchase of costly Power and reduction in Power purchase Extensive IT enabled initiatives and their implementation
29
Turnaround Strategy Auditing of progress, performance including energy audit Efficient Revenue collection mechanism. Increased efficiency and productivity levels Means to sustain the growth & turnaround Preparation of Transmission plan for evacuation of power from various basins in the Pradesh
30
IT Initiatives 1999 - Computerized Billing introduced
Late 1990s - HPSEB’s Website created Computerised billing implemented – Paymnet gateway on Board’s Website 2008 – Target for GIS/GPS asset mapping project 2008 – Establishment of Data & Call Center Spot billing machines to be used for billing The Asian Development Bank has already agreed to provide funds for ERP Project to the tune of $3_Million
31
Some more IT Initiatives www.hpsldc.org
To improve Efficiency & Economy at SLDC, HPSEB has developed a Website for: Importing and saving data from various websites. Preparation of Schedules for exchange of power & day-ahead schedules Preparation of Energy Accounts Preparation of GUI Interface for capturing anticipated generating schedules from HP Power Stations Preparation of Day Ahead Schedules and other requisite Reports
34
H.P. Hydro Power Status (In MW)
Total identified potential Harnessed so far Under execution/Allotment To be allotted Under Investigation Abandoned Himurja Projects (43.75 in operation)
37
Short Term Proposal During Winter Months NTPC to provide 250 MW RTC to HPSEB w.e.f 1st Dec 2008 to 15th Feb 2009 HPSEB to return this Power to NTPC during summer months w.e.f. 15th June 2009 to 31st August 2009
38
Typical Demand Curve for HPSEB (with NTPC Power)
1400 1200 1000 800 MW 600 400 200 Time Demand Availability Availability with NTPC Power
39
Proposed Business Model for joint venture between HPSEB & NTPC
Capacity of proposed Hydro Power Plant: MW Estimated Cost of Project: Cr. Debt : Equity Ratio For the Project: :30 All expenditure on account of investment & administrative charges to be born in the ratio: : 50
40
Energy Management for the Proposed Project
Summer Months (April to September): The entire 500 MW (or energy actually generated) to be at NTPC’s disposal Winter Months (October to March): The entire 500 MW (or energy actually generated during the summers months) to be at HPSEB’s disposal Less Generation to be made up for by NTPC through its other sources
41
Point for consideration
Acceptance of HPSEB Engineers by NTPC on deputation basis
42
Thank You