In This Lecture You Will Learn:
About the Unified Software Development Process How phases relate to workflows in an iterative life cycle An approach to system development Major activities in the development process © 2010 Bennett, McRobb and Farmer
3
Unified Software Development Process
Developed by the team that created UML Embodies best practice in system development Adopts an iterative approach with four main phases Different tasks are captured in a series of workflows © 2010 Bennett, McRobb and Farmer
4
© 2010 Bennett, McRobb and Farmer
Best Practice Iterative and incremental development Component-based development Requirements-driven development Configurability Architecture-centrism Visual modelling techniques © 2010 Bennett, McRobb and Farmer
5
© 2010 Bennett, McRobb and Farmer
Four Phases Inception Elaboration Construction Transition © 2010 Bennett, McRobb and Farmer
6
Phases, Workflows and Iterations
Within each phase activities are grouped into workflows The balance of effort spent in each workflow varies from phase to phase Within phases there may be more than one iteration © 2010 Bennett, McRobb and Farmer
7
© 2010 Bennett, McRobb and Farmer
Size of square relative to time spent on workflows Inception Elaboration Construction Transition Project Phases 1 2 3 4 5 6 7 8 Iterations within a phase Requirements Analysis Design Implementation Test Workflows time © 2010 Bennett, McRobb and Farmer
8
Difference from Waterfall Life Cycle
In a waterfall life cycle project the phases and the workflows are linked together In the Requirements phase, only Requirements workflow activities are carried out All Requirements activity should be completed before work starts on Analysis In an iterative life cycle project it is recognised that some Requirements work will be happening alongside Analysis work © 2010 Bennett, McRobb and Farmer
9
© 2010 Bennett, McRobb and Farmer
Requirements Analysis Design Implementation Test © 2010 Bennett, McRobb and Farmer
10
Major Activities of the Development Process
Activity Techniques Key Deliverables Requirements Capture and Modelling Requirements Elicitation Use Case Modelling Architectural Modelling Prototyping Use Case Model Requirements List Initial Architecture Prototypes Glossary © 2010 Bennett, McRobb and Farmer
11
Major Activities of the Development Process
Activity Techniques Key Deliverables Requirements Analysis Communication Diagrams Class and Object Modelling Analysis Modelling Analysis Models © 2010 Bennett, McRobb and Farmer
12
Major Activities of the Development Process
Activity Techniques Key Deliverables System Architecture and Design Deployment Modelling Component Modelling Package Modelling Architectural Modelling Design Patterns Overview Design and Implementation Architecture © 2010 Bennett, McRobb and Farmer
13
Major Activities of the Development Process
Activity Techniques Key Deliverables Class Design Class and Object Modelling Interaction Modelling State Modelling Design Patterns Design Models © 2010 Bennett, McRobb and Farmer
14
Major Activities of the Development Process
Activity Techniques Key Deliverables User Interface Design Class and Object Modelling Interaction Modelling State Modelling Package Modelling Prototyping Design Patterns Design Models with Interface Specification © 2010 Bennett, McRobb and Farmer
15
Major Activities of the Development Process
Activity Techniques Key Deliverables Data Management Design Class and Object Modelling Interaction Modelling State Modelling Package Modelling Design Patterns Design Models with Database Specification © 2010 Bennett, McRobb and Farmer
16
Major Activities of the Development Process
Activity Techniques Key Deliverables Construction Programming Component Re-use Database DDL Programming Idioms Manual Writing Constructed System Documentation © 2010 Bennett, McRobb and Farmer
17
Major Activities of the Development Process
Activity Techniques Key Deliverables Testing Programming Test Planning and Design Test Plans Test Cases Tested System © 2010 Bennett, McRobb and Farmer
18
Major Activities of the Development Process
Activity Techniques Key Deliverables Implementation Planning Training Data Conversion Installed System © 2010 Bennett, McRobb and Farmer
19
© 2010 Bennett, McRobb and Farmer
Summary In this lecture you have learned about: The Unified Software Development Process How phases relate to workflows in an iterative life cycle An approach to system development Major activities in the development process © 2010 Bennett, McRobb and Farmer
20
© 2010 Bennett, McRobb and Farmer
References Jacobson, Booch and Rumbaugh (1999) Kruchten (2004) Chapter 21 of Bennett, McRobb and Farmer includes more about the Unified Process as well as Agile alternatives (For full bibliographic details, see Bennett, McRobb and Farmer) © 2010 Bennett, McRobb and Farmer
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.