NC-54 at Farrington as Offset Intersection
April 6, 2017 NC-54 at Farrington as Offset Intersection Joe Hummer, Mobility and Safety Nick Lineberger, Congestion Management
2
Existing Configuration
3
Existing Configuration
4
Widening Configuration
5
Offset Intersections Separate conflict points
Give driver time to react Fewer signal phases on main street Opportunity to implement synchronized street or continuous flow intersection (CFI) features Especially right then left offset More pedestrian crossing opportunities Some academic literature
6
Reasons to Believe Offset Intersection Might Work at NC-54 and Farrington
Falconbridge parallel to Farrington Farmington Drive as connector 950 feet between Farrington and Falconbridge should be enough room Apparent space along Falconbridge and NC-54 Could employ synchronized street features Best progression of any at-grade intersection Could employ continuous flow intersection (CFI) features Highest capacity of any at-grade intersection
7
Offset Intersection Concept at NC-54 and Farrington
Access Access Farrington Access Falconbridge Farmington Drive
8
Rerouted SB Left Turn NC-54 Access Access Farrington Access
Falconbridge Farmington Drive
9
Rerouted SB Through NC-54 Access Access Farrington Access Falconbridge
Farmington Drive
10
Rerouted NB Left NC-54 Access Access Farrington Access Falconbridge
Farmington Drive
11
Rerouted NB Through NC-54 Access Access Farrington Access Falconbridge
Farmington Drive
12
Offset Intersection – Full Movement Signal at Falconbridge
13
Offset Intersection Concept with CFI
New access Access Access Farrington Access Falconbridge Farmington Drive
14
CFI Geometry at NC-54 and Falconbridge
15
CFI Geometry on Falclonbridge
16
Offset Intersection – CFI Concept
17
Downsides of Offset Plans
Cost Too costly to do quickly? Impacts on Falconbridge and Farmington Drive Wayfinding No CFI open in NC yet Signal progression Full signals at Falconbridge and I-40 EB ramps about feet apart About 37 percent efficiency with current speed and cycle length
18
Superstreet Concept at Falconbridge
Maintain Farrington as Left-In/Right-Out Provide better progression along NC-54 Tight spacing for U-turns between Falconbridge and Farrington
19
Superstreet Concept at NC-54 and Falconbridge
Access Access Farrington Access Falconbridge Farmington Drive
20
Offset Intersection – Superstreet at Falconbridge
21
Simulation Result Summary Travel time in hours
Configuration AM peak PM peak Existing 1650 1630 Widening 1090 1380 Offset with conventional Falcolnbridge 490 690 Offset with CFI Falcolnbridge 550 540 Superstreet 880 890
22
Conclusions Offset intersection concept moves queues away from I-40 ramps Standard full movement signal at Falconbridge provides LOS D or better at all intersections CFI concept at Falconbridge provides further improvement during PM peak Worth additional impacts?
23
Conclusions Offset intersection concept could help on NC-54 at Farrington Worth further exploration Need costs and impacts Don’t forget median u-turn as well Temporary help or permanent solution? Offset concept can help other places Maximize capacity while impacting only chosen quadrants Take best advantage of synchronized street and CFI features
24
Thank You. Joe Hummer, jehummer@ncdot. gov, 919-814-5102