Presentation is loading. Please wait.

Presentation is loading. Please wait.

Production Part Approval Process (PPAP)

Similar presentations


Presentation on theme: "Production Part Approval Process (PPAP)"— Presentation transcript:

1 Production Part Approval Process (PPAP)
Supplier Assessments Supplier Parts & Receipts Defective Material Reports (DMRs) PPAPs Supplier Performance PPM & OTP Corrective Action Supplier Interaction via My.Eaton Portal Profile & Capabilities WISPER To insert a new slide with this template, go to the Home tab (up top), click New Slide and select the one that says Impactful Slide. Please avoid using this slide style too often in your presentation. It is meant to help get strong messages across and/or to help separate sections within your presentation.

2 PPAP Philosophy Eaton embraces the Production Part Approval philosophy as it provides for an approval of the process not just the part Submission of documents within a PPAP package give great insight into how a process is controlled to ensure ongoing acceptability Process flow, PFMEA, Control Plans Gage R&R, Process Capability for special characteristics

3 Eaton Supplier APQP/PPAP Tools
Supplier Engagement Guidelines Drive early supplier engagement Ensure all required information is shared up-front PPAP Workbook Requirements based on business & risk Macro to identify PPAP level & submission requirements Measures of Effectiveness (MoE) to monitor the process Training Material In-depth PPAP/process training

4 Eaton Supplier APQP/PPAP Tools
All Supplier APQP/PPAP Tools Available here or Eaton.com>Doing Business>Selling to Us>Supplier APQP Process

5 Supplier PPAP Expectations
PPAP submissions are required for new parts or revised parts PPAP submission requirements will vary from part to part, depending upon the risk/criticality of the component Contact your Buyer or Supplier Quality Engineer for part-specific PPAP instructions


Download ppt "Production Part Approval Process (PPAP)"

Similar presentations


Ads by Google