GEM Integrated PCB readout and cooling
Andrey Marinov On behalf of GEMs for CMS collaboration CMS GEM Upgrade Workshop III 18/04/2012
2
Talk Outline GE1/1 Proto1 GE1/1 Proto2
GE CMS detector – Cooling and integrated readout PCB NS2 Technique Detector Powering plan Cooling Calculations Readout strips - PCB design On going activities CMS GEM Upgrade Workshop III 18/04/2012
3
GE1/1 Detector Layout GE1/1 Proto1 GE1/1 Proto2 Drift, GEM1 = 3mm
GEM1, GEM2 = 2mm GEM1, GEM2 = 1mm GEM2, GEM3 = 2mm GEM3, Readout = 2mm GEM3, Readout = 1mm CMS GEM Upgrade Workshop III 18/04/2012
4
GE1/1 Prototypes – Proto1 Readout PCB with strips
128 channels per VFAT connector 0.8mm pitch 256 strips for each eta partition 1.6mm pitch PCB thickness = 3mm 1024 channels CMS GEM Upgrade Workshop III 18/04/2012
5
GE1/1 Proto2 – Readout Board
24VFAT FEBs 3072 channels Strip’s pitch 0.8mm Strip’s pitch 0.4mm CMS GEM Upgrade Workshop III 18/04/2012
6
From Thermo Stretching to NS2 Technology
CMS GEM Upgrade Workshop III 18/04/2012
7
GE CMS Prototype Full size detector ready for installation in CMS
3840 Readout channels. Based on NS2 Technology. Gaps between the detector electrodes 3/1/2/1mm All services integrated and compatible with the CMS infrastructure. Thanks to NS2 method the detector can be open and elements can be changed. CMS GEM Upgrade Workshop III 18/04/2012
8
GE CMS Prototype - Power Consumption
VFAT FEB power =18W HV Divider = 4W dc/dc converters - 80% efficiency GBT = 2.25W Total Power for the detector is 34W CMS GEM Upgrade Workshop III 18/04/2012
9
GE Detector Cooling Sketch
CMS GEM Upgrade Workshop III 18/04/2012
10
Clearance Available Inside the GE detector
9mm clearance CMS GEM Upgrade Workshop III 18/04/2012
11
VFAT Cooling Sketch CMS GEM Upgrade Workshop III 18/04/2012
12
VFAT3 PCB Design 44mm 50 mm Multilayer chip bonding
CMS GEM Upgrade Workshop III 18/04/2012
13
VFAT Cooling Sketch Water flow rate = 0.02826 kg/s
CMS GEM Upgrade Workshop III 18/04/2012
14
VFAT Chip Cooling Calculations made by Enrich Da Riva – CERN CFD team
CMS GEM Upgrade Workshop III 18/04/2012
15
Cooling Calculations for the HV Divider
Calculations made by Enrico Da Riva – CERN CFD team CMS GEM Upgrade Workshop III 18/04/2012
16
GE Detector – Cooling of the HV divider
CMS GEM Upgrade Workshop III 18/04/2012
17
VFAT3 Cooling Calculations made by Enrico Da Riva – CERN CFD team
CMS GEM Upgrade Workshop III 18/04/2012
18
GE Integrated Readout Board
For the moment the full size readout board is foreseen to be 7 layers providing : Strips and connection to the FEB Power to the FEBs Ground connection LVDS signal lines from FEB to the optical transceiver GBT CMS GEM Upgrade Workshop III 18/04/2012
19
On going activities VFAT PCB design – nearly finished
GE readout board on going CMS GEM Upgrade Workshop III 18/04/2012
20
Thank you. CMS GEM Upgrade Workshop III 18/04/2012