Download presentation
Presentation is loading. Please wait.
Published byArchibald Jackson Modified over 7 years ago
1
Date of download: 9/26/2017 Copyright © ASME. All rights reserved. From: A Holistic Evaluation of Data Center Water Cooling Total Cost of Ownership J. Electron. Packag. 2016;138(1): doi: / Figure Legend: Schematic of (a) IT equipment chassis, (b) hybrid-cooled IT node, and (c) direct water cooled IT node
2
Date of download: 9/26/2017 Copyright © ASME. All rights reserved. From: A Holistic Evaluation of Data Center Water Cooling Total Cost of Ownership J. Electron. Packag. 2016;138(1): doi: / Figure Legend: Energy analysis results for Denver, CO assuming a 335 W air-cooled node with (a) Greenfield data center design and (b) Brownfield data center design, generated using methodology described in Ref. [14]
3
Date of download: 9/26/2017 Copyright © ASME. All rights reserved. From: A Holistic Evaluation of Data Center Water Cooling Total Cost of Ownership J. Electron. Packag. 2016;138(1): doi: / Figure Legend: Summary of TCO metrics for Denver, CO, assuming $0.12/kWh for electricity, 0.0% energy escalation, 335 W air-cooled node, and 5× DWC IT cooling hardware cost
4
Date of download: 9/26/2017 Copyright © ASME. All rights reserved. From: A Holistic Evaluation of Data Center Water Cooling Total Cost of Ownership J. Electron. Packag. 2016;138(1): doi: / Figure Legend: Impact of electricity cost on project payback assuming Denver, CO, 0.0% energy escalation, 335 W air-cooled node, and 5 × DWC IT cooling hardware cost
5
Date of download: 9/26/2017 Copyright © ASME. All rights reserved. From: A Holistic Evaluation of Data Center Water Cooling Total Cost of Ownership J. Electron. Packag. 2016;138(1): doi: / Figure Legend: Impact of water cooling hardware cost on project payback assuming Denver, CO, $0.12/kWh electricity cost, 0.0% energy escalation, and a 335 W air-cooled node. This includes the cost of cold plates, hoses, manifolds, and quick disconnects.
6
Date of download: 9/26/2017 Copyright © ASME. All rights reserved. From: A Holistic Evaluation of Data Center Water Cooling Total Cost of Ownership J. Electron. Packag. 2016;138(1): doi: / Figure Legend: Impact of node power consumption on project payback assuming Denver, CO, $0.12/kWh electricity cost, 0.0% energy escalation, and 5 × DWC IT cooling hardware cost
7
Date of download: 9/26/2017 Copyright © ASME. All rights reserved. From: A Holistic Evaluation of Data Center Water Cooling Total Cost of Ownership J. Electron. Packag. 2016;138(1): doi: / Figure Legend: Impact of location on the 5-year NPV assuming location-specific electricity cost and escalation rates, 335 W air-cooled node, and 5 × DWC hardware cost
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.