CITY SANITATION PLAN HINGOLI

Similar presentations


Presentation on theme: "CITY SANITATION PLAN HINGOLI"— Presentation transcript:

1 CITY SANITATION PLAN HINGOLI
PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED

2 CONTENTS SECTION I: OVERVIEW AND CONTEXT SETTING
INTRODUCTION LOCATION AND REGIONAL SETTING DEMOGRAPHIC PROFILE ADMINISTRATIVE DETAILS AND SLUM PROFILE CONTEXT OF WATER SUPPLY IN HINGOLI SECTION II: SECTORAL ANALYSIS AND PLAN PROPOSALS ACCESS TO SANITATION FACILITY (TOILETS) – HOUSEHOLD, COMMUNITY AND PUBLIC SANITATION FACILITIES WASTEWATER, SEPTAGE AND STORM WATER MANAGEMENT SOLID WASTE MANAGEMENT SECTION III: MUNICIPAL FINANCE ANALYSIS MUNICIPAL FINANCE ANALYSIS FINANCING PLAN SECTION IV: SUMMARY AND FINANCING ALTERNATIVES PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED

3 SECTION I: OVERVIEW CONTEXT SETTING INTRODUCTION
LOCATION AND REGIONAL SETTING DEMOGRAPHIC PROFILE CITY ECOLOGY CONTEXT OF WATER SUPPLY PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED

4 CITY PROFILE: HINGOLI INTRODUCTION AND REGIONAL SETTING
In 1960, Hingoli became part of Maharashtra as part of Parbhani district. Later, on 1St May 1999 Hingoli District came into existence with division of Parbhani. City Hingoli Civic status Nagar Parishad ‘B’ class Area 16.74 sq. km Location Latitude N and Longitude E Number of Wards 7 prabhags/28 wards Connectivity Well connected by Hingoli Railway station. Airport at Nanded (88 km) Major Roads- SH 204, SH 215 Population 85,401 Population density 5102 persons/ sq. km DEMOGRAPHY Population Forecast Method Year AM IM GM PM Other 2012 86471 86506 87152 86767 86000 2013 87451 90272 88939 88134 90102 2021 96099 96746 104616 99065 92000 2028 103588 109855 120585 109630 96028 2031 106797 108738 128155 112729 98000 2041 117495 121377 156990 126393 103500 2043 119635 =129982*say 163493 129126 105000 Incremental increase method has been adopted since this method is appropriate for town like Hingoli PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED

5 The city of area 16.74 sq km is divided into 7 prabhags
CITY PROFILE: HINGOLI ADMINISTRATIVE BOUNDARY SLUM PROFILE 1 3 5 2 8 9 6 7 Slum names Slum population 1 Mastanshah Nagar 496 2 Sidharth Nagar 3103 3 Garmal 1040 4 Bawankholi 2266 5 Risala Bazar/ Ganesh wadi 9545 6 Joona Aundha Naka 3879 7 Mahadev wadi 5743 8 Tallabkatta/ Mondipora 2886 9 Pensionpora 2016 The city of area sq km is divided into 7 prabhags Prabhag no. 3 and 5 are dense occupied prabhags (Gaothan area) 9 slum pockets constituting 36% of the total population Prabhag Total HHS Total population 1 2205 11966 2 2283 12391 3 2294 12451 4 2296 12463 5 2060 11184 6 2089 11340 7 2458 13342 Total 15685 85401 PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED

6 Authorised consumption
WATER SUPPLY IN CONTEXT OF HINGOLI EXISTING STATUS Present quantity of water supply in the city is about 6.30 MLD against the demand of MLD Rate of water supply is only lpcd Under UIDSSMT scheme, a proposal of augmentation of rate of water supply to 135 lpcd Water supply network Length Total length of trunk main 23 km Total length of transmission main 40 km Total length of distribution network in city 250 km Total area under water distribution 13 sq. km 48.3% of coverage of water supply Only 44.70% of cost recovery Sr. no Type of connections No. 1 Residential 7500 2 Non-domestic 30 Total 7530 Water audit and rehabilitation and augmentation of lines expected to complete by 2015 PROCESS OF WATER SUPPLY siddheshwar dam River Darana WTP Surface water Storage 7.30MLD 1 GSR 4 ESR Distribution Meter Unbilled authorised consumption: MLD Billed metered consumption: 0.00 MLD Billed unmetered consumption: 5.04MLD Unauthorised use and leakages on transmission mains and on distribution line: 2.02 MLD Revenue water 5.04 MLD (72.32%) Non revenue water 2.26 MLD (27.68%) Authorised consumption Apparent losses Real losses Lifting capacity – 13.2 MLD PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED

7 SECTORAL ANALYSIS AND PLAN PROPOSAL
SECTION II: SECTORAL ANALYSIS AND PLAN PROPOSAL ACCESS TO SANITATION FACILITY (TOILETS) - HOUSEHOLD COMMUNITY & - PUBLIC SANITATION FACILITIES WASTEWATER, SEPTAGE AND STORM WATER MANAGEMENT SOLID WASTE MANAGEMENT PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED

8 ACCESS TO SANITATION FACILITY (TOILETS) –
HOUSEHOLD SANITATION FACILITIES COMMUNITY SANITATION FACILITIES PUBLIC SANITATION FACILITIES PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED

9 31% of population practices open defecation
HOUSEHOLD LEVEL SANITATION FACILITY SANITATION OVERVIEW SANITATION COVERAGE TOILET FACILITY 31% of population practices open defecation Prabhag 3, 4 and 6 – critical for availability of sanitation facility Lack of knowledge about functioning of septic tanks ON-SITE COLLECTION/TREATMENT FACILITY ISSUES IN HOUSEHOLD LEVEL SANITATION Prabhag 3, 4 and 6 - no availability of sanitation facilities Toilet seats in slums; -10% households are discharging toilet waste/black water directly into the open drains Households without individual toilets forced to defecate in open Effluents from septic tanks directly discharged into open drains Lack of awareness and motivation in ULB to maintain and clean the conveyance system PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED

10 SUGGESTED IMPROVEMENTS IN HOUSEHOLD LEVEL SANITATION FACILITY
Short Term (from year 2013 till 2015) Mid Term (from year 2015 till 2028) Mitigate existing demand gaps Initiate schemes for household sanitation in slum areas (Rs crore) At present: Households practicing OD in slums = 2,791 (57%) Households covered under on-going ILCS scheme = 867 Considering similar schemes for remaining households = 1,924 Initiate Promoting household sanitation through IEC campaigns in non-slum area (Rs crore) Households practicing OD in non-slum area = 3,158 (31%) OD should be discouraged by promoting non-slum dwellers to have household sanitation facility IEC campaign is required to discourage OD Note: Cost for the household sanitation in non-slum area Rs crore Enforce bye-laws for improved disposal systems in household sanitation for existing and new developments Enhancing service level and coverage Achieve 100% coverage of household level sanitation through initiating schemes for slum areas and promoting individual toilets in non-slum areas Up gradation of primary treatment depending on selected conveyance system and treatment for black and grey water PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED

11 Grant under Sujal Nirmal/ILCS
SUGGESTED PILOTS FOR HOUSEHOLD LEVEL SANITATION FACILITY SELECTION OF PILOTS Slum names Slum population % of OD Preference to Individual toilet (in %) Preference to CT (in %) Willing to invest in HH sanitation Remarks Mastanshah Nagar 496 77 92 8 Upto Rs (40%) Sidharth Nagar 3103 55 98 2 Not willing to invest (50%) Selecting for community sanitation facility Garmal 1040 96 4 Rs (36%) Bawankholi 2266 80 94 6 Upto Rs (38%) Risala Bazar/Ganesh wadi 9545 85 93 7 Rs (58%) Joona Aundha Naka 3879 100 95 5 Upto Rs (58%) Mahadev wadi 5743 Rs (54%) Selecting for HH sanitation facility Tallabkatta/Mondipora 2886 90 10 Upto Rs (35%) Rs (35%) Pensionpora 2016 47 Upto Rs (63%) PROVIDING INDIVIDUAL TOILETS IN MAHADEV WADI SLUM & TALLABKATTA SLUM With Rs. 12,000 for individual toilet with septic tank, Schemes like Sujal Nirmal can be availed Slum No. of HH HH practicing OD Unit cost of toilet Total cost Grant under Sujal Nirmal/ILCS Paid by user + ULB Mahadev wadi 5743 Rs. 14,000 Rs Cr Rs Cr Rs Cr Tallabkatta 2886 Rs Cr Rs Cr Rs Cr PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED

12 COMMUNITY LEVEL SANITATION FACILITY
LOCATION OF COMMUNITY BLOCKS CONDITION ASSESSMENT Community toilet Details Prabhag no. 1 Prabhag no. 2 Prabhag no. 3 Prabhag no. 4 Prabhag no. 5 Prabhag no. 6 Prabhag no. 7 Prabhag Households 2205 2283 2294 2296 2060 2089 2458 No. of toilet blocks Nil 3 2 4 1 No. of seats - 40 50 10 No. of men 20 25 5 No. of women Seats for children No. of functional seats Managed by ULB User charges applicable No Type of on-site treatment Septic tank Remark Defunct KEY ISSUES - COMMUNITY LEVEL SANITATION About 31% households in the city practices open defecation Almost 57% slum dwellers defecate in open areas in community toilet Defunct septic tanks leading to unhygienic environment Lack of awareness about sanitation and hygiene PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED

13 SUGGESTED IMPROVEMENTS IN COMMUNITY LEVEL SANITATION FACILITY
SHORT TERM (FROM YEAR 2013 TILL 2015) MID TERM (FROM YEAR 2015 TILL 2028) Mitigate existing demand gaps Upgrading Community Blocks for improved infrastructure and on-site collection-treatment- disposal system (Rs crore) Rehabilitation of all existing CT blocks with improved level of sanitation, water supply, infrastructure, regular cleaning of septic tank, etc. Introduce O&M of CTs on pilot basis Eradication of OD practices and improve present condition of ownership towards community sanitation facility in slum areas. IEC campaigns are required Initiating awareness generation strategies in slum areas (IEC cost) Reducing dependency on CTS Aiming at reducing the dependency of CTs through promotion of individual toilets PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED

14 Not willing to invest (50%)
SUGGESTED PILOTS FOR COMMUNITY LEVEL SANITATION FACILITY SELECTION OF PILOTS Slum names Slum population % of OD Preference to Individual toilet (in %) Preference to CT (in %) Willing to invest in HH sanitation Remarks 1 Mastanshah Nagar 496 77 92 8 Upto Rs (40%) 2 Sidharth Nagar 3103 55 98 Not willing to invest (50%) Selecting for community sanitation facility 3 Garmal 1040 96 4 Rs (36%) Bawankholi 2266 80 94 6 Upto Rs (38%) 5 Risala Bazar/Ganesh wadi 9545 85 93 7 Rs (58%) Joona Aundha Naka 3879 100 95 Upto Rs (58%) Mahadev wadi 5743 Rs (54%) Selecting for HH sanitation facility Tallabkatta/Mondipora 2886 90 10 Upto Rs (35%) Rs (35%) 9 Pensionpora 2016 47 Upto Rs (63%) JUNA AUNDHA NAKA SIDDHARTH NAGAR Upgrading existing infrastructure (Rs lakhs) Improve septic tanks, water facility, taps and toilet pans, electricity, cleaning of toilet block premise and cleaning of Nalla Introducing O&M (Rs. 5,000/month) Outsourcing O&M to of Rs. 5,000/month Levying user fee (Rs. 18,360/month) With about Rs. 30 per HH and Rs. 2 for any visitors and Rs. 1 for use of urinal Upgrading existing infrastructure (Rs lakhs) Improve septic tanks, water facility, taps and toilet pans, electricity, Cleaning of toilet block premise and cleaning of Nalla Introducing O&M (Rs. 5,000 pm) Letting out day to day maintenance to CBOs with Rs. 5000/ month Levying user fee (Rs. 22,500/month) With about Rs. 30 per HH and Rs. 2 for any visitors and Rs. 1 for use of urinal PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED

15 PUBLIC LEVEL SANITATION FACILITY
LOCATION OF PUBLIC BLOCKS ISSUES IN PUBLIC LEVEL SANITATION Gandhi chowk (O&M by private contractor) Water clogging in front of the toilet block Variable user charges Unhygienic surroundings due to dumping of solid waste in backyard of the block Lack of awareness towards use of public level sanitation infrastructure Bhaji mandi (O&M by ULB) Experiences heavy influx of floating population (market visitors) Unclean and unhygienic condition of available infrastructure Schools & Colleges Adequate toilet blocks Periodic maintenance by school administration Public Buildings Almost all buildings have toilet blocks often maintained by private contractor SUGGESTED STRATEGIES FOR PUBLIC LEVEL SANITATION Area (Existing toilets) No. of users Present status Gandhi Chowk 70 O&M given on contract with variable user charge Irregular cleaning Bhaji Mandi 50 O&M given on contract with fixed user charges Urinals not provided Toilet unclean Upgrading infrastructure of 2 public toilet blocks (Rs lakhs) Rehabilitation of these blocks to provide water facility, taps, electricity and improved infrastructure with on-site treatment of septic tanks is suggested Cost per block upto Rs. 3 lakhs is assumed Introduce O&M of PTs on pilot basis through involvement of private contractor (Rs. 5,000/month) Involving private contractor to operate and maintain the PT blocks on user fee basis Present users40-50 persons. With improved facilities, projected users persons User fee of Rs. 2 per person, approx. Rs. 160 per day (about Rs. 5,000/ month) - for maintenance PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED

16 SUMMARY OF SUGGESTED IMPROVEMENTS
SHORT TERM MID/ LONG TERM Support action – Initiate promotion of household sanitation through IEC campaigns in non-slum areas New infrastructure – Initiate schemes for household sanitation in slum areas Improvement in existing status - Initiate pilot for providing individual toilets IEC cost Rs crore New infrastructure- Achieve 100% household level sanitation Support action - Enforce bye-laws for improved disposal systems in household sanitation for new developments HOUSEHOLD LEVEL SANITATION FACILITY Rs crore Improvement in existing status – Develop a strategy for improved septic tanks COMMUNITY LEVEL SANITATION FACILITY Improvement in existing status Refurbishing existing Community Toilets (CTs) Support action - Introduce contracting of O&M of CTs to private contractor or CBOs on pilot basis (Siddharthnagar slum) In long run, it is aimed at developing the household sanitation facility to reduce the dependency on community level facilities Rs crore Initiating awareness generation strategies for hygienic and improved sanitation practices in slum areas PUBLIC LEVEL SANITATION FACILITY Improvement in exiting status - Refurbishing existing infrastructure in both public toilets Improvement in exiting status - Ensure O&M of the public toilet blocks and regularise user charges New infrastructure – Provide adequate urinals (of 2 seats) in toilet block at Bhaji mandai Rs crore Rs. 5,000pm New infrastructure - Augment public toilet block near public places (as required) Improvement in existing status/Support action - Develop a model to utilise refurbished community toilet blocks near public spaces as public toilets and levy user charges PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED

17 ACCESS TO TOILET FACILITY
Provide individual toilets in slum areas Rs crore Provide public toilet block at Bhaji mandai Rs crore Upgrading Public Toilet Blocks with improved infrastructure and on-site collection-treatment Rs crore Upgrading Community Toilet Blocks with improved infrastructure and on-site collection-treatment Rs crore

18 WASTE AND STORM WATER MANAGEMENT
PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED

19 GREY AND BLACK WATER MANAGEMENT
WASTEWATER MANAGEMENT- VALUE CHAIN Open/covered drains No treatment Into natural drain/ river Kitchen Bathrooms Domestic washing activities COVERAGE-CONVEYANCE SYSYTEM COVERAGE ISSUES IN CONVEYANCE SYSTEM Sewerage network: There is no continuous sewerage network in the city Solid waste is disposed into the nalla, so it leads to water clogging No separate system of grey and black water Untreated wastewater directly discharged into natural drains and river bodies Partial conveyance system exists PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED

20 1 2 1 2 3 3 GREY AND BLACK WATER MANAGEMENT SANITATION ZONES CRITERIA
Topography Existing natural drainage system Human interventions (mainly urban development activities like construction of buildings and roads) SEWAGE GENERATION Zone Population Sewage generation(MLD) 1 61002 3.5 2 24399 1.4 3 85401 4.9 1 2 % SEWAGE FLOW IN NALLAS 1 Nalla emerging from old Siphon carries 30% of the total wastewater Nalla flowing near Datta Mandir carries 30% of the total wastewater generated, and Nalla flowing along the Parbani Road carries 40% of wastewater generated in the region 2 3 3 PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED

21 GREY AND BLACK WATER MANAGEMENT
WATER QUALITY SAMPLING WASTEWATER MANAGEMENT PRACTICES 1 2 3 4 Sampling locations Ambika Taki Nalla near market Nalla (old basti) Tap water near railway bridge Sample Location BOD, mg/l COD, mg/l TSS, mg/l pH Desired standards 30 250 600 Ambika Taki 159 240 130 7.3 Nalla near market 81 94 7.6 Tap water near railway bridge 9.3 60 7.2 7.8 Nalla (old basti) 102 160 117 Beyond CPCB effluent standards Within the CPCB effluent standards PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED

22 WASTEWATER MANAGEMENT: VALUE CHAIN
USER INTERFACE COLLECTION/STORAGE CONVEYANCE DISPOSAL PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED

23 Option 2 – On-site Sanitation (FSM) option
PROPOSED WASTEWATER VALUE CHAIN PROPOSED VALUE CHAIN Option 1 - Sewer Network User interface Collection Conveyance Treatment Disposal Old town area Toilets Septic tank Open/ closed drains River/ lake No treatment Settled sewer + intercepting sewer Rehabilitation of drains +intercepting sewer Conventional STP Agriculture use/ river New Areas Toilets Septic tank Settled sewer + Intercepting sewer Toilets City wide UGD Option 2 – On-site Sanitation (FSM) option Old & New town area User interface Collection Conveyance Treatment Disposal Toilets Septic tank No conveyance River/ Open plots No treatment Vacuum suction emptier trucks Fecal sludge treatment Facility Reuse for agriculture/energy conversion Septage Soak Pit Only effluent PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED

24 STRATEGIES FOR WASTEWATER CONVEYANCE
Wastewater Management – Short Term (from year 2013 till 2015) Wastewater Management – Mid Term (from year 2015 till 2028) Existing open drains shall be rehabilitated with respect to natural terrain and then covered Maximum collection and conveyance coverage to dispose maximum wastewater at desired point Reducing incidents of mixing solid waste garbage in drains Enhanced efficiency of the existing conveyance system Initiate pilot for developing under ground sewer system (Rs crore) Developing suitable conveyance system in the area which grossly lacks any arrangements Initiating Pilot for DEWATS treatment unit (Rs.0.31 crore) Ensuring treatment of collected and conveyed wastewater and reuse for agricultural purposes in pilot areas Develop city wide conveyance system Rest of the area can be covered by underground sewerage network Proposing zone-wise DEWATS treatment units Ensuring treatment of collected and conveyed wastewater and reuse for agricultural purposes PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED

25 PILOT FOR WASTEWATER CONVEYANCE SYSTEM
CRITERIA FOR SELECTING PILOT AREA KEY MAP SPECIFICATIONS Prabhag 01 Newly developing area Existing Road length (m) 43.89km Population 2012* 11,966 Population 2013* 12,649 Population 2028* 15,392 Population 2043* 18,215 Estimated waste generation in 2043(MLD) 1.96 Existing conveyance system 60% Newly developing areas Low dense area No conveyance system Almost 95% HHs having septic tanks or pits Slope is towards the Kayadu River PROPOSED OPTION FOR PILOT AREA PF toilet Septic tank DEWATS/Conventional STP Underground sewerage network River/lake/ agriculture use On-site collection Conveyance User interface Treatment Disposal PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED

26 STRATEGIES FOR WASTEWATER TREATMENT - PILOT
Pilot for DEWATS Selected area – Newly developed area on northern side Low density area Slope towards natural drain Value chain SPECIFICATIONS User interface Conveyance Treatment Disposal Households 187 Population 935 Sewage generation 0.1 MLD Road length 2.57 km (approx.) Construction periods 6 months Construction cost( lakhs) 0.42 per cubic meter Pour flush Latrines Settled sewer system Septic tank as primary treatment DEWATS for secondary treatment Kayadhu River or open drains PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED

27 PROPOSED STRATEGIES FOR SEPTAGE MANAGEMENT
SOURCE CHARACTERISTICS SUGGESTED STRATEGIES Leach Pits Highly concentrated quasi-solids with high pathogen content and higher moisture content Pits can be emptied manually without the need for specialised equipment Septic tanks Varies enormously depending on the number of people utilising the septic tank, water consumption, tank size, and pumping frequency Septage vacuum trucks are widely utilised for cleaning of septic tanks Indicator 2011 2012 2013 Population 85,401 86,506 90,272 Households in the town 15,573 15,774 16,461 No. of households using septic tanks 7,586 7,684 8,019 Pits to be cleaned every year 316 320 334 Total (septic tank + pit ) 7902 8,004 8,353 Septage 2 cum/septic tank or pit in a year 15,804.00 16,008.49 16,705.41 DG - Daily Generation (for 365 days in a year) 43.30 43.86 45.77 No. of fecal sludge and septage drying beds 18 20 Indicative Site Area (Ha) 0.04 0.05 PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED

28 STORM WATER MANAGEMENT
NATURAL DRAINS & LAKES DETAILS Population 85,401 Area 2,669 Ha Length of nalla 13.5 Km OBSERVATIONS Major nallas and drains carrying wastewater and runoff, discharge it in Kayadhu River without treatment leads to pollution of the river Jaleshwar Talav gets polluted due to wastewater discharge from nearby slum area Dumping of solid waste into the drains/ nallas reduces water carrying capacity of drains/nallas At present, there is no separate conveyance system for wastewater and storm water generated in the city Inadequate drainage system in newly developed areas SLOPE OF THE CITY EXITING STORM WATER MANAGEMENT PRACTICES Solid waste dumped into drain Black and grey water let into natural drains PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED

29 STORM WATER MANAGEMENT
Drainage zones ZONING Zone 1 Major three nallas/drains flowing in the centre of the city carries storm water as well as wastewater generated in the core area/densely populated area of the city. Zone 2 Zone 1 One major nalla flowing on the peripheral part of the city carries the storm water generated in the newly developed areas mainly from government offices and residential blocks of the city SUGGESTED STRATEGIES Short term De-silting of existing Nallas (natural drains) Includes cleaning and removal of solid waste of Nallas by JCB Zone 2 Long term Channelisation of Nallas in phases Nallas within municipal limit will be channelised with RCC structure Considering width of these Nallas as 2.1 m and slope 1:500 PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED

30 WASTEWATER MANAGEMENT – SETTLED + CONVENTIONAL SEWER
Citywide Conventional UGD (Rs crore) Treatment Plant (Rs crore) Conventional UGD (Rs crore) Rehabilitate existing drains (Rs crore) and initiate settled sewer (Rs crore)

31 To achieve . . . By what means . . . ON-SITE SANITATION SYSTEM
User interface Collection Conveyance Treatment Reuse/disposal Centralised or decentralised fecal sludge treatment facility Reuse for industrial/agriculture/ energy conversion Septic tank Effluent disposed through soak pit Vacuum suction emptier trucks/trolley To achieve . . . Universal Access to toilets Universal access to improved septic tanks & soak pits Safe conveyance of septage for treatment/reuse Adequate treatment of septage Economic revenue from reuse of treated septage By what means . . . Individual toilet Community toilet Public toilet Bathrooms New/refurbishment of septic tanks Connection of septic tank and grey water to household/ community level soak pits Possibility of DEWATS Provision of adequate vacuum suction emptier trucks and a regulated service Possibility of outsourcing services to private sector Provision of treatment facility like sludge drying beds for collected septage Decentralised treatment sites to reduce transportation cost Revenue from sale of treated septage for agriculture purpose or conversion to energy

32 User Interface Collection Conveyance Treatment Reuse/disposal
EXPLORING A CITYWIDE OSS PROPOSAL User Interface Collection Conveyance Treatment Reuse/disposal Universal access to toilets Universal access to improved septic tanks and soak pits Safe conveyance of septage for treatment/reuse Adequate treatment of septage Economic revenue from treated septage New individual toilets (2,305), public urinals (2 seats) and refurbishment of community (13 blocks), public toilets (2 blocks) Up-gradation (2797) and refurbishment (3793) of non-functional septic tanks New soak pits (15,267) Additional emptier trucks (6) with linked service Treatment of fecal sludge (10,034 sq mt) Income through sale of compost (4,631 tonne /year sold at Rs. 500/ tonne) or for energy Promotion programme for use of toilets, ‘septic tank conversion’ and Ongoing regulatory monitoring Rs. 3.8 Crore Public funds (subsidy), micro credit, PPP Rs. 7.9 Crore Public funds (subsidy), micro credit, household own funds Rs. 0.6 Crore Public funds, PPP, private entrepreneur 0.1 Crore Public funds, PPP, private entrepreneur Public funds, PPP, private entrepreneur Business model for community/public toilets, explore microcredit options Develop separate or integrated business models for septic tank emptying, treatment and explore option for reuse or energy conversion

33 Decentralised Fecal sludge treatment facility
WASTEWATER MANAGEMENT – ON-SITE SANITATION OPTION Decentralised Fecal sludge treatment facility

34 COMPARISON OF WASTEWATER OPTIONS
Aspects OPTION 1 OPTION 2 Option 3 Description of Option Conventional Sewer + Settled Sewer Settled Sewer On-site Sanitation System Financial Aspects Capital Costs Rs crore Rs crore Rs crore O&M Costs (average/ annum) Rs crore Rs crore Rs crore Revenues (average/ annum) Project Period 5 4 Sanitation Score Access Both options will have the same outcomes as per NUSP “Universal Access to All and 100 % Sanitised City” Waste management Other consideration Institutional Required technical knowledge for implementation and operation of this project Flexibility Extension of conventional sewer to new areas is difficult and expensive Can be easily extended to new areas, possibility of DEWATS in some areas Funding options Grants funding is essential Grants may be required or can be funded from ULB funds Can be funded from ULB funds Other parameters Appropriate design is essential Need to assess soil permeability and water table levels for this proposal

35 SOLID WASTE MANAGEMENT
PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED

36 No treatment SOLID WASTE MANAGEMENT
EXISTING VALUE CHAIN FOR SOLID WASTE MANAGEMENT No treatment Dumping site Open space Dumping in Nalla Dumper placer Ghantagadi Dustbin COLLECTION TRANSPORTATION TREATMENT DISPOSAL PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED

37 Waste collection in MT/day
SOLID WASTE MANAGEMENT Solid Waste Generation Solid waste collection in slums Collection Of Solid Waste Area Collection Transportation Waste collection in MT/day Treatment & disposal Vehicle number trips Residential area Door to door (D2D) – Coverage 50% (managed by private operator) 3 wheeler auto tipper 4 Dumped at Ramleela ground (Transfer point) Compactor (from transfer point) 1 2 Secondary collection Dumping ground located 8 km away the city Residential 40 waste bins from residential and non-residential area Dumper placer Open dumps and road side drains Tipper truck Non-residential Tractor trailer 3 6 Nalla cleaning JCB (borrowing) Twice in a year, specially during pre-monsoon Total waste collection MT/day 16 MT/day (78% of total waste generation) PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED

38 SOLID WASTE MANAGEMENT
Treatment and Disposal No scientific treatment and disposal techniques Collected waste dumped without segregation Site is under the possession of Hingoli Nagar Parishad and is covered by a boundary wall. Dumping of waste in open areas, along nallas and open plots Overflowing waste bins Issues Collection About 50% D2D coverage (only old city area is covered) Inadequate number of waste bins (40 bins in use) Waste collection - 78% of waste generation Transport Inadequate number of vehicles for transportation Segregation Lack of segregation at source Processing and Disposal No facility for scientific treatment and disposal for municipal solid waste Absence of infrastructure for scientific disposal techniques PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED

39 Collection & transportation
SUGGESTED IMPROVEMENTS IN SOLID WASTE MANAGEMENT Short Term (Year ) Mid Term (Year ) Long Term (Year ) Collection & transportation Improvement in existing system - Achieving maximum coverage of collection New infrastructure - Augment vehicles for waste collection depending upon urban sprawl and population changes New infrastructure - Augment and upgrade existing vehicles for waste collection depending upon urban sprawl and population changes Improvement in existing system - Involve private service providers for regular nalla cleaning New infrastructure - Augment vehicles for waste collection Segregation Improvement in existing system - Initiate pilot project for segregation of waste in newly developed area Improvement in existing system - Initiate citywide segregation of waste Improvement in existing system - Initiate citywide segregation of waste Treatment & Disposal Improvement in existing system - Developing treatment mechanism for bio-degradable wastes New infrastructure - Developing sanitary landfill New infrastructure - Developing sanitary landfill site and treatment mechanism for wet garbage IEC and other Initiating awareness generation campaigns for improved collection practices Identifying stakeholders like NGOs, CBOs, SHGs or women welfare groups to participate in management of the service at various levels like collection, segregation Achieve sustainability in solid waste management processes Initiating IEC and capacity building programmes for service providers for improved service delivery PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED

40 Estimated requirement of Vehicles Estimated Cost Rs. in lakhs
SUGGESTED IMPROVEMENTS IN SOLID WASTE MANAGEMENT Cost estimation for vehicles (solid waste collection) Year Population MSW in MT/ Day Estimated requirement of Vehicles Residential * Non-residential** Total req. Existing vehicle Gap Estimated Cost Rs. in lakhs Estimated Cost Rs. in lakhs 2012 86,506 17 14 4 10 40 2 -- 2013 90,272 18 15 1 2028 1,09,855 22 72 8 2043 1,30,000 26 20 80 3 Assumptions - 3 wheeler Auto trippers- 0.5 MT, 2 trips (Rs. 4 lakhs) OR 1 MT, 2 trips (Rs. 6 lakhs) – Both used for D2D collection Ghantagadi – 2 MT capacity, 1 trip (Rs. 8 lakhs) (Used for D2D collection), Tractor Trailer – 2MT, 2-3 trips (Rs. 8 lakhs) (used for nalla cleaning and commercial areas) The ratio of vehicle requirement for residential and non-residential is considered as based on survey Assuming years of life for vehicles; during mid term and long term period new vehicles is required to buy. Also, the cost may vary due to increase in market rates after year years Criteria for selecting pilot area Newly developing and low density area High income level (based on primary survey) No door to door collection PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED

41 User interface Collection Conveyance Treatment Reuse/disposal
SUMMARY - SANITATION PROPOSAL User interface Collection Conveyance Treatment Reuse/disposal Access to toilets and Waste Water Proposal Individual toilets on pilot basis in Mahadev wadi slum (Rs crore) Rehabilitation and closing of drains (Rs crore) Pilot DEWATS in newly developing areas of Prabhag 1 Reuse for Agriculture and Irrigation Purposes Settled + Conventional sewer : 51.2 crores Settled sewer : 36.4 crores OR Refurbishment of all CTs in slum and non-slum areas (Rs crore) Initiate citywide Settled Sewer Network or Initiate UGD in newly developing areas and settled sewer in old town (Rs crore/ Rs crore) Centralised Treatment Facility as Waste Stabilisation pond (WSP) (Rs Cr.) Provision of individual toilets in slum areas (Rs crore) Refurbishment of existing PTs (Rs crore) Provision of 2 seats of public urinals in Bhaji mandi area (Rs crore) Prabhag 5 – Pilot for Settled Sewer Pilot for outsourcing O &M of CT to Private/CBO in Siddarthnagar slum Prabhag 1 - Pilot for UGD (if UDG in full city) Introduce Integrated Contracts for SWM and drain cleaning Initiate outsourcing of O&M to private operator for CTs Empanel septic tank emptying service providers IEC campaigns De-silting & Rehabilitation of Natural drains (Rs crore) Solid Waste Management Increasing Door to Door collection of waste (Rs crore) Rs crores Augmentation of vehicles (Rs crore) Developing treatment mechanisms for wastes and developing sanitary landfill site (Rs crore) Initiate pilot project for segregation of waste in newly developed area (Rs 0.02 crore) IEC campaigns

42 SUMMARY OF SUGGESTED IMPROVEMENTS
SHORT TERM MID/LONG TERM Support action – Initiate promotion of household sanitation through IEC campaigns in non-slum areas New infrastructure – Initiate schemes for household sanitation in slum areas Improvement in existing status - Initiate pilot for providing individual toilets IEC cost Rs crore New infrastructure- Achieve 100% household level sanitation Support action - Enforce bye-laws for improved disposal systems in household sanitation for new developments HOUSEHOLD LEVEL SANITATION FACILITY Rs crore Improvement in existing status – Develop a strategy for improved septic tanks COMMUNITY LEVEL SANITATION FACILITY Improvement in existing status Refurbishing existing Community Toilets (CTs) Support action - Introduce outsourcing of O&M of CTs to private contractor or CBOs on pilot basis (Siddharthnagar slum) In long run, it is aimed at developing the household sanitation facility to reduce the dependency on the community level facilities Rs crore Rs crore Initiating awareness generation strategies for hygienic and improved sanitation practices in slum areas PUBLIC LEVEL SANITATION FACILITY Improvement in exiting status - Refurbishing existing infrastructure in both public toilets Improvement in exiting status - Ensure O& M of the public toilet blocks and regularise user charges New infrastructure – Provide adequate urinals (of 2 seats) in toilet block at Bhaji mandai Rs crore Rs. 5,000pm New infrastructure - Augment public toilet block near public places (as required) Improvement in existing status/ Support action - Develop a model to utilise refurbished community toilet blocks near public spaces as public toilets by levying user charges PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED

43 WASTEWATER MANAGEMENT
SUMMARY OF SUGGESTED IMPROVEMENTS SHORT TERM MID/ LONG TERM WASTEWATER MANAGEMENT Improvement in existing status - Cleaning or rehabilitation of road side drains with removal of clogging Rs crore Or Rs crore New infrastructure - Initiating settled sewer system in the areas of the town (Old and new developments) Or Initiating underground sewerage network in phases in newly developed areas Rs crore & Rs.5.40 crore OR Rs crore New infrastructure – Initiate pilot for developing underground sewer system in new development, only if citywide UGD will be implemented Rs crore New infrastructure - Proposed conventional treatment plant with stabilisation process (Waste Stabilisation process) New infrastructure - Initiating Pilot for DEWATS approach in new developments Rs crore Support action - Formulate bye-laws/guidelines on on-site sanitation Improvement in existing status - Initiate pilot for developing settled sewer system in old town area, only if similar conveyance system will be implemented in future Rs crore Improvement in existing status – De-silting of natural drains up to 0.9 m (with the help of JCB machines) Rs crore Improvement in existing status – Channelisation of natural drains within municipal limits Empanel service providers and regulate tariffs for de-sludging/cleaning Rs crore STORM WATER MANAGEMENT PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED

44 SOLID WASTE MANAGEMENT
SUMMARY OF SUGGESTED IMPROVEMENTS SHORT TERM MID/ LONG TERM SOLID WASTE MANAGEMENT Improvement in existing status - Augment vehicles for D2D solid waste collection New infrastructure - Augment vehicles to maximise coverage of collection Rs crore Rs crore Improvement in existing status - Initialising pilot for SWM in a newly developed residential area on participatory model Support action - Involving informal groups for segregation of waste Rs crore Policy action – Formulate/enforce bye-laws and guidelines to prohibit littering Improvement in existing status - Initiate pilot project for segregation of waste in newly developed area Policy action - Implement user charges for SWM towards achieving O&M cost recovery Rs crore Improvement in existing status - Initiate awareness generation campaigns for improved collection practices Improvement in existing status - Develop sanitary landfill site IEC cost Rs crore Policy level - To introduce integrated contractual arrangement for D2D collection of waste, street sweeping and cleaning of drains Improvement in existing status - Achieving sustainability of treatment and disposal of solid waste Rs crore Improvement in existing status - Developing treatment mechanisms for bio-degradable and recyclable wastes Improvement in existing status - Initiate IEC and capacity building programmes for service providers for improved service delivery IEC COST Sr. no. Component Description Cost (Rs. in lacs) Short term (3 years) 1 Designing and planning of IEC campaign (designing IEC material, drawing plan of action, etc) NGO and Consultant involvement 5 2 Implementation (street plays, campaigns, competitions, etc.) 15 3 Publicity materials Printing Handouts, posters, banners, etc. 10 4 Total 30 PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED

45 MUNICIPAL FINANCE ANALYSIS
SECTION III: MUNICIPAL FINANCE ANALYSIS MUNICIPAL FINANCE AND FINANCING PLAN PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED

46 SUMMARY OF FINANCES AFTER RECASTING
HINGOLI: SUMMARY OF BUDGETS SUMMARY OF FINANCES AFTER RECASTING Rs. in crore 2005 2006 2007 2008 2009 2010 Items Actual RE Opening Balance 0.80 1.02 1.57 1.78 2.95 3.09 Revenue Receipts 4.03 4.75 4.54 6.69 6.10 5.69 Revenue Expenditure 2.69 2.86 3.45 4.36 4.40 10.58 Operating ratio 0.67 0.60 0.76 0.65 0.72 1.86 Capital Account Capital Receipts 0.75 6.71 - 4.32 Capital Expenditure 2.00 1.91 0.77 1.01 2.59 Capital Utilisation 268% 28% 0% 60% Extra-ordinary Account Extraordinary Receipts 0.03 0.11 0.00 Extraordinary Expenditure 0.01 0.04 0.12 0.10 Summary Total Receipts 4.77 11.50 4.57 6.80 11.57 Total Expenditure 4.69 4.78 4.25 5.20 5.51 13.77 The municipal expenses have increased from Rs. 4.7 crore in to Rs crore in registering a CAGR of 4.1% Similarly, municipal receipts have increased from Rs crore to Rs. 6.1 crore registering a CAGR of 6.3% touching a high of Rs. 6.8 crore in

47 Almost all the capital works are carried out from grants
HINGOLI: O&M EXPENSES Property and water taxes are major own tax contributors. Property tax contributes 18% to the overall revenue receipts Mudrank Shulka grants and entertainment tax grants are major grants received by HNP The grant in lieu of octroi and dearness allowance grant also contribute significantly Rents from properties, interest on investments are major non-tax contributors Almost all the capital works are carried out from grants Almost all the expenses towards public health are towards WSS (54% of all revenue expenses) 56% expenses towards permanent establishments

48 HINGOLI: WATER SUPPLY AND SANITATION (WSS) FINANCES
WSS contributes only 8% towards overall revenue receipts but accounts for 53% of the revenue expenses Water tax (Rs. 900 per connection per annum) is the only revenue stream for the sector Collection efficiency of water tax is 60% compared to 68% for property tax Around 58% expenses in WSS are towards establishments 73% of expenses in water supply are towards electricity and bulk water Per capita spending on WSS (Rs. 297) is only 32% of High Powered Expert Committee (HPEC), 2011 norm of Rs. 926

49 Revenue expenses will grow at CAGR of 7.1%
HINGOLI: MUNICIPAL FINANCE FORECASTS Revenue expenses will grow at CAGR of 7.1% While revenue receipts at 5.3% The budget size will grow to Rs. 13 crore by 2022 recording a CAGR of 7% from the last actual figure The revenue receipts will grow to around Rs crore against expenses of Rs. 10 crore in 2022 The revenue surplus is projected to be around Rs 1.4 crore after covering WSS deficit of Rs. 3.6 crore Past trends Future projections ‘Business As Usual’ with committed UIDSSMT Full CSP (+UIDSSMT) Comparison of wastewater systems– a) Underground sewerage system (USS) b) Settled sewer system (SSS) c) On-site sanitation system (OSS) Financing Plan for Hingoli CSP is prepared for three scenarios

50 Impact of UIDSSMT on the Revenue Account
I) BUSINESS AS USUAL – UIDSSMT Water supply scheme sanctioned under UIDSSMT Project components includes water supply network augmentation, storage capacity augmentation and water production augmentation Project cost Rs. 46 crore State government share – 90% Rs. 41 crore ULB share – 10% Rs. 4.5 crore Year -wise Capex required. Additional O&M and revenue expected to be generated Impact of UIDSSMT on the Revenue Account Revenue account will continue to show surplus after the UIDSSMT Programme is implemented

51 Water supply Wastewater Solid waste
II) FULL CSP (INCLUDING TOILETS, WASTEWATER, SOLID WASTE MANAGEMENT, WATER SUPPLY, UIDSSMT PROJECT) - 1 Water supply Water supply scheme – UIDSSMT Slum infrastructure Energy audit Replace service line connections Storage capacity Collection efficiency of taxes Wastewater Community and public toilets Individual toilet provision Sewerage network Settled sewer Suction emptier trucks Wastewater treatment facility Storm water drains De-silting and channelisation of drains IEC campaign Solid waste Segregation of waste Collection bins New vehicles for solid waste transportation Sanitary landfill site IEC campaign

52 High revenue deficit after the CSP proposals are implemented
II) FULL CSP (INCLUDING TOILETS, WASTEWATER, SOLID WASTE MANAGEMENT, WATER SUPPLY, UIDSSMT PROJECT) - 2 Revenue Income and Expenditure High revenue deficit after the CSP proposals are implemented Surplus/(Deficit) of Revenue Account

53 WSS Operating Plan WSS Capital Plan
II) FULL CSP (INCLUDING TOILETS, WASTEWATER, SOLID WASTE MANAGEMENT, WATER SUPPLY, UIDSSMT PROJECT) - 3 WSS Operating Plan Increment in tariff required to sustain operating costs Property tax, water supply tax, wastewater tax and solid waste charges WSS Capital Plan Grants of around Rs. 81 crore is required to implement all the proposals of CSP

54 COMPARISON OF OPERATING COSTS FOR WASTEWATER TECHNOLOGIES
III) COMPARING WASTEWATER (WITH TOILETS) PROPOSALS- 1 COMPARISON OF OPERATING COSTS FOR WASTEWATER TECHNOLOGIES a) Underground Sewerage System Status of Revenue Account b) Settled Sewer System c) On-site Sanitation System

55 COMPARISON OF OPERATING PLANS
III) COMPARING WASTEWATER (WITH TOILETS) PROPOSALS- 2 COMPARISON OF OPERATING PLANS a) Underground sewerage system ~ Rs. 2.3 crore/annum operating expenditure b) Settled sewer system ~ Rs. 1.4 crore/annum operating expenditure c) On-site sanitation system ~ Rs. 1 crore/annum operating expenditure

56 COMPARISON OF CAPITAL PLANS
III) COMPARING WASTEWATER (WITH TOILETS) PROPOSALS- 3 COMPARISON OF CAPITAL PLANS a) Underground sewerage system Rs. 95 crore Capital expenditure requirement b) Settled sewer system Rs. 77 crore Capital expenditure requirement c) On-site sanitation system Rs. 63 crore Capital expenditure requirement

57 SUMMARY AND FINANCING ALTERNATIVES
SECTION IV: SUMMARY AND FINANCING ALTERNATIVES PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED

58 SUMMARY OF FINANCING PLAN
CSP options Capital Finances Operating Finances Tariff increase required Base tariff = Rs. 1,465/HH/ annum Sources of funds (Rs. in crore) Average per annum(Rs. in crore) Grants ULB funds Private (HHs, PPP, micro -credit) Total Capex Additional Opex Additional Revenue Internal funds Debt I) Business as Usual (BAU) scenario with committed projects 42.6 9.1 - 51.7 0.9 Rs. 2,066 (41%) II) Full CSP proposal with water supply actions 81.0 10.0 38.0 3.5 132.0 2.7 1.2 Rs.7,545 (415%) III) Proposal with only wastewater technology options A. Citywide settled sewer and sewerage network 76.1 9.9 7.0 1.5 94.5 2.3 Rs.3,602 (146%) B. Citywide settled sewer 60.5 14.7 2.0 77.2 1.4 1.7 Rs. 2,055 (40%) C. On-site sanitation system 15.7 4.7 63 1.0

59 Capital cost assumption Operating cost assumption
ASSUMPTIONS FOR CSP ACTIONS CSP Actions - HINGOLI Capital cost assumption Operating cost assumption Funding source (All costs in Rs. in crore) Unit costs Capex Unit cost O&M Grants ULB Private Committed projects Water augmentation scheme proposed under UIDSSMT - Water distribution network, storage, water production - 45.70 2% of capex 90% 10% 867 individual toilets proposed under ILCS 14,000 1.21 80% Water supply actions Regularising illegal connections (1%) Rs. 500/connection penalty charges Energy audit 0.02 100% Replacement of service line connections Rs. 2,000/ connection 0.16 Improvement in collection efficiency of water supply charges Sanitation actions Construct new soak pits Rs. 3,000/soak pit 5.52 50% Provision of safe sanitation disposal system to existing unsanitary toilets (50% septic tanks – 3,793, upgration of non- functional septic tanks– 2,797, upgradation of septic tanks of 13 CT and 2 PT) Rs. 5,000/septic tank Rs. 15,000/CT-PT septic tank 3.99 Improve condition of existing community and public toilets Rs. 1.5 lakhs/ block 0.24 Rs. 5,000/ block/month (for all CT and PT) Construction of community and public toilets Rs. 3 lakhs/block 0.04 Rs. 5000/block/ month Construction of additional individual toilets in non-sewered areas Rs. 14,000/toilet 1.83 IEC campaign for sanitation awareness 0.47

60 Capital cost assumption Operating cost assumption
ASSUMPTIONS FOR CSP ACTIONS CSP Actions - HINGOLI Capital cost assumption Operating cost assumption Funding source (All costs in Rs. in crore) Unit costs Capex Unit cost O&M Grants ULB Private Wastewater actions Expanding or laying of new sewerage network (1.5% DPR cost added) Rs. 25 lakhs/km 20.45 5% of capex 90% 10% - Household cost for connecting to sewerage network (6,500 connections) Rs. 2000/ connection 1.30 100% Upgradation of open drains to closed drains Rs. 12 lakhs/km 9.39 Construction of covered drains in unserved areas Rs. 16 lakhs/km 12.7 2% of capex Procurement of suction emptier trucks Rs. 10 lakhs/ truck 0.60 10% of capex Construction of wastewater treatment plant Rs. 16 lakhs/ MLD 2.25 7% of capex Construction of sludge treatment facility Rs lakhs/ cu. m 0.10 Settled sewer in old city area Rs. 6.8 lakhs/km 8.14 Settled sewer in newly developing area 5.43 De-silting and channelisation of natural drains 6.50 Solid waste actions Segregation of waste collection and transportation 0.02 IEC for campaign for compliance and segregation 0.15 Procurement of new vehicles for collection and transportation Rs. 4 lakhs/vehicle 0.62 Construction of sanitary landfill facility 3.51

61 Thank You PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED


Download ppt "CITY SANITATION PLAN HINGOLI"

Similar presentations


Ads by Google