1 (Alice COsmic Ray Detector) Status Report
ACORDE (Alice COsmic Ray Detector) Status Report

2 ACORDE Unit 2 Scintillators 2 PMTs 1 FEE 2 HV cable
1 LV cable to power FEE card 3 LVDS signal cable

3 ACORDE array 60 ACORDE modules on top of L3 magnet
(HV, LV, Signal cable, HV power supply)

4 Electronics+DAQ/ECL Electronics Cards FEE. 60 FEE cards. PATCH PANEL.
8 patch panels. BUS 2 BUS cards. MAIN BOARD 2 Main board OR BOX On construction.

5 High & Low Voltage CAEN-EASY System
A3486 Power supply EASY crate A3009B Module A1676 Branch Controler SY 2527 HV Power Supply 1733N Module HV

6 Technical Forum Report
Commissioning W. Riegler Status of DCS Lennart Jirden  Status of Trigger Orlando Villalobos Status of DAQ Pierre VANDE VYVRE  11/11/2017 W. Riegler, CERN

7 Installation Sequence
The ALICE detector installation sequence  Done: HMPID/ 2TOF/ 1TRD/ ZDC/ ACORDE/ Muon Tracking/ Muon Trigger TPC-parking/ ITS barrel/ Beampipe/ V0-C/ T0-C/ FMD3/ SPD/ SSD/ SDD/ FMD2/ TPC-IP To be done: Service Chariot/ Valve/ EMCAL/ PHOS/ Miniframe/ T0-A/ V0-A/ FMD1/ PMD/ Dipole/ Beampipe/ Shielding PHOS/ more TOF & TRD We have accumulated significant delay, because … 11/11/2017 W. Riegler, CERN

8 Subdetector Status DAQ and Trigger: In excellent shape. Ready to read subdetectors. ACORDE: Installation finished. Connected to CTP. Connected to DAQ. Some HV modules not yet delivered. DCS, ECS work ongoing. EMCAL: EMCAL support is sitting in SXL2 and ready to be installed. FMD: FMD3 Installed, connected to rack and tested. FMD2 installed and tested. Connection to rack on Miniframe t.b.d. FMD1 ready for integration with V0-A beginning of October. HMPID: Up and running. Currently producing a noise map. Muon Tracking: St1: Installed and tested standalone. St2: Installed, currently connected and tested. St3: 50% installed, rest to be installed in October (access). St4: Installed and connected. Commissioning starting. St5: Installed and connected. Commissioning starting. Muon Trigger: Installed, connected and tested (standalone). Connection to DAQ to be done. 11/11/2017 W. Riegler

9 Subdetector Status T0: C-side installed and checked up to the rack. Electronics still to be installed. A-side to be installed in Jan. V0-C: V0-A: Ready for integration with FMD3. Electronics to be installed. ZDC: Both ZDC elements installed. Progress on sub-detector stand alone commissioning is steady, but not extremely fast. 11/11/2017 W. Riegler

10 Main Concern Offline tasks Calibration Alignment Reconstruction
Man power: Pedro Podesta (responsible) Eleazar Cuautle, Pedro Gonzalez, Mario Rodriguez, Antonio Ortiz

11 Global Commissioning Runs
Magnet Test , Global Commissioning Run Dec. 10th to Dec. 21st ACORDE / FMD1 / HMPID / SSD% / SDD% / 2TOF / TPC% / 1TRD / T0-C / Muon % The goal is to start with ‘the real thing’: Shift crew, run organization etc … 11/11/2017 W. Riegler, CERN

12 Detector Status September 07
1 H/W & low level S/W done 2 Basic control with PVSS 3 FSM implemented 4 Configured and ready for operation SPD SDD SSD TPC TRD TOF HMP PHO CPV MCH MTR FMD T0 V0 PMD ZDC ACO EMC TRG DCS HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV RCK LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV DSS MON MON MON MON MON MON MON MON MON standard GAS GAS GAS GAS GAS GAS GAS GAS Central effort GAS VME VME VME VME VME VME VME VME VME VME VME VME VME VME COO COO COO COO COO COO COO COO VEN VEN COO COO FEE FEE FEE FEE FEE FEE FEE GMS FEE FEE FEE FEE HAL semi : - Device & FEE configuration - Oracle archival - access control - alarms - User Interface LV LAS VHV HVD MON APD HVD THR FEL LVD MOV LED BOM SFM PIT IAS MIR GPS PCU LIQ LED MTS THR APD TCO VAC CAM GPU PTU CCO LAS specific NMR SYN CPU GTU TOR NIM RAD DVM DVM TRU

13 Detector Status September 07
1 H/W & low level S/W done 2 Basic control with PVSS 3 FSM implemented 4 Configured and ready for operation SPD SDD SSD TPC TRD TOF HMP PHO CPV MCH MTR FMD T0 V0 PMD ZDC ACO EMC TRG DCS HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV RCK LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV DSS MON MON MON MON MON MON MON MON MON standard GAS GAS GAS GAS GAS GAS GAS GAS Central effort GAS VME VME VME VME VME VME VME VME VME VME VME VME VME VME COO COO COO COO COO COO COO COO VEN VEN COO COO FEE FEE FEE FEE FEE FEE FEE GMS FEE FEE FEE FEE HAL semi : - Device & FEE configuration - Oracle archival - access control - alarms - User Interface LV LAS VHV HVD MON APD HVD THR FEL LVD MOV LED BOM SFM PIT IAS MIR GPS PCU LIQ LED MTS THR APD TCO VAC CAM GPU PTU CCO LAS specific NMR SYN CPU GTU TOR NIM RAD DVM DVM TRU

14 Status at Point 2 The CTP is now installed at Point 2, as are all the required detector partitions. The detector partitions are available for use by detectors 12 TTC partitions are connected at present. FMD, ACORDE, TPC, DAQ, TOF, MUON_TRK, SDD, SSD, TRD, SPD, HMPID, MUON_TRG Cosmic triggers from ACORDE now available. Fanin-fanout crate operational, used by SSD, DAQ, FMD, HMPID (CPV).

15 Status in September

16 Status at Point 2 From P. Vande Vyvre: DAQ Meeting October 2nd 2007
So far, only test of transmission of triggers via CTP was to use ACORDE to trigger DAQ DAG partition.

17 CTP at Point 2 CTP present All LTC crates present TTCmi present
Remote access to LTC partitions available and being used.

18 Detector commissioning with TRG & DAQ at Point 2 till Sep 07
SPD SSD SDD TPC T RD TOF MUON TK TG HMP I D PHOS C P FMD T 0 V0 ZDC PMD ACORDE EMCAL Data Acquisition with central DAQ Trigger with central Trigger Generation of Trigger signals NA

19 Colaboración ACORDE – México
Benemérita Universidad Autónoma de Puebla. (BUAP). Instituto de Ciencias Nucleares-UNAM) Centro de Investigación y de Estudios Avanzados. (CINVESTAV)