2 YEL WIND POWER PROJECT

3 ROUTE MAP OF PROJECT FROM KARACHI
NOORIABAD YEL KARACHI

4 PAKISTAN WIND ROUTE MAP

5 CONTENTS INTRODUCTION CONSTRUCTION HIGHLIGHTS
WIND TURBINE GENERATORS COMPONENTS & ELECTRICITY PRODUCTION ELECTRICITY COLLECTION SYSTEM

6 INTRODUCTION DESCRIPTION:
YEL WIND POWER project located in Jhimpir wind Corridor, which has a megawatt potential with average wind speeds over 7 meter per second , having capacity of 50 Mega Watt containing 20 turbines of 2.5 MW each . MAIN PRINCIPLE A wind turbine captures wind energy and then uses a generator to convert it in to electrical energy which is then supplied to national grid.

7 INTRODUCTION MAIN CONTRACTORS: DESCON & NORDEX PROJECT START DATE:
Project starting date was 14th of February 2015. COD Commercial Operation Date was 16th of September after RRT(reliability run test) conducted for one week. TOC: Taking over certificate(TOC) date is planned at first week of December. MAXIMUM OUTPUT: 51.2 MW against 50 MW

8 CONSTRUCTION HIGHLIGHTS WTG FOUNDATION

9 CONSTRUCTION HIGHLIGHTS WTG ERECTION

10 CONSTRUCTION HIGHLIGHTS WTG ERECTION

11 CONSTRUCTION HIGHLIGHTS WTG ERECTION

12 CONSTRUCTION HIGHLIGHTS MV COLLECTION TRENCH

13 CONSTRUCTION HIGHLIGHTS SUBSTATION

14 CONSTRUCTION HIGHLIGHTS SWITCHYARD AREA

15 WIND TURBINE GENERATORS COMPONENTS & ELECTRICITY PRODUCTION
The Wind Turbine mainly contains Three Rotar blades connected by hub Nacelle consists of drive train and generator with in it Towers which bear weight of whole upper assembly

16 WIND TURBINE GENERATORS COMPONENTS & ELECTRICITY PRODUCTION
HOW IT WORKS The wind is used to generate mechanical power or electricity. Wind turbines convert the kinetic energy of the wind into mechanical power. This mechanical power is used by a generator to convert it in to electrical energy .Generator creates KV of voltage and passes it to convertor (which controls generator frequency) and GSU transformer.

17 ELECTRICITY COLLECTION SYSTEM
GSU (GENERATOR STEP UP) TRANSFORMER The voltage by the each wind turbine generator is stepped up from 660 V to 22 KV by GSU transformer. RMU(RING MAIN UNIT) A Ring Main Unit (RMU) is a gas-insulated compact switchgear unit. It is also used for Power collection of whole wind farm by loop wise. Loop A : WTG 1-5 Loop B : WTG 6-10 Loop C : WTG 11-15 Loop D : WTG 16-20

18 ELECTRICITY COLLECTION SYSTEM
CABLE COLLECTION SYSTEM MV cables , earthing cables and fibre optic cables are brought to substation in cable trenches collectively by loop wise i.e. from loop A, loop B , loop C and loop D .

19 ELECTRICITY COLLECTION SYSTEM (SUBSTATION)
A substation is built to collect all the energy generated by the turbines and received through the MV cables . Substation consists of following elements: Medium voltage system High voltage system Capacitors banks Auxiliary services Control, protection and metering system Communication system Fire protection and intruders protection systems

20 ELECTRICITY COLLECTION SYSTEM (SUBSTATION)
MEDIUM VOLTAGE SYSTEM MV Switchgear connects different electrical nodes i.e connecting the power coming from collection system and transmit it to Power Transformers. It also provides electrical isolation and protection to the plant.

21 ELECTRICITY COLLECTION SYSTEM (SUBSTATION)
HIGH VOLTAGE SYSTEM HV System consists of 132 KV switchgear and metering system . It finally transmit the power to national grid .

22 ELECTRICITY COLLECTION SYSTEM (SUBSTATION)
CAPACITORS BANKS It is used for providing necessary reactive power to plant The demand of this reactive power is mainly originated from inductive load connected to the system.

23 ELECTRICITY COLLECTION SYSTEM (SUBSTATION)
AUXILIARY SERVICES Batteries and EDG generators are used for power backup in case of power failure.

24 ELECTRICITY COLLECTION SYSTEM (SUBSTATION)
CONTROL, PROTECTION AND METERING SYSTEM This system is used for controlling and protection of 132 KV switchgear . For overall controlling SCADA(Supervisory control and data acquisition) is used .

25 ELECTRICITY COLLECTION SYSTEM (SUBSTATION)
COMMUNICATION SYSTEM These are telecom panels responsible for tele protection of lines.

26 CHINA LEADS THE WORLD IN WIND CAPACITY