1 ALDOT Specifications Update
Curtis Vincent, P.E. State Construction Engineer 26th Annual Alabama Asphalt Pavement Conference

2 Construction Specification Updates
1. Importance of the Asphalt Industry 2. How we decide to change specifications 3. Recent changes in Specifications 4. Topics of discussion that might lead to additional changes. 26th Annual Alabama Asphalt Pavement Conference

3 26th Annual Alabama Asphalt Pavement Conference
Asphalt Industry From 2012 to 2015 ALDOT let over 3 Billion Dollars in Construction work. Of that amount, approximately 53% of funds went towards asphalt related items. This was a major investment for the taxpayers of Alabama. A good roadway network is critical to the economy. Each and everyone of us and our families drive on asphalt roadways daily. 26th Annual Alabama Asphalt Pavement Conference

4 Industry and ALDOT Partnership
We are all in this together! Asphalt Plant Mix- Quality Liaison Committee Highway Industry Quality Liaison Committee (ARBA) Other Committees and groups ALDOT in- house experiences 26th Annual Alabama Asphalt Pavement Conference

5 26th Annual Alabama Asphalt Pavement Conference
Special Provision No Section 408 Planing and Micro-Milling Existing Pavement Unless otherwise noted on the plans, the pavement removal shall be limited to an area that will be covered with a surface treatment or layer of pavement within 72 hours after removal has begun. 26th Annual Alabama Asphalt Pavement Conference

6 Special Provision No. 12-0325(2) Section 105 Control of Work
Plans and Drawings Working drawings and design calculations shall be submitted for: 12. Construction loads on bridges 26th Annual Alabama Asphalt Pavement Conference

7 Updates scoring pay item and changes measurement to per mile.
Special Provision Section 428 Scoring Bituminous Pavement Surface Updates scoring pay item and changes measurement to per mile. 26th Annual Alabama Asphalt Pavement Conference

8 26th Annual Alabama Asphalt Pavement Conference
Special Provision Sections 703 and 856 Preformed Traffic Control Markings Description Preformed thermoplastic markings may be used for permanent striping, and for other circumstances as designated by the Engineer. Materials Preformed traffic markings and legends shall also meet the requirements given in Article All preformed markings and legends shall meet the dimensions as shown in the plans and shall meet the tolerances requirements given in (c)1. 26th Annual Alabama Asphalt Pavement Conference

9 Special Provision 12-1657 Section 109 Measurement and Payment
Allows use of electronic signatures. Allows use of remote ticketing. Trucks used to haul material being paid by weight shall be measured empty daily, with the driver in the truck, to establish a daily tare weight. Each truck shall also bear a plain legible identification number. As a minimum, the weight ticket shall contain the following: 3) Truck number and maximum legal load for the designated haul route. 8) Weighmaster’s signature. For scales with remote ticketing capability, the Weighmaster’s signature may be electronically generated. 26th Annual Alabama Asphalt Pavement Conference

10 25th Annual Alabama Asphalt Pavement Conference

11 Electronic Weighmaster Signatures
Feb. 1, 2016 letter to ARBA and AAPA: Attached is Special Provision No revising Item (h)2 of the specifications to allow a Weighmaster to electronically sign weight tickets when a scale location has remote ticketing capability. Please note that this allowance also requires additional information to be included on the weight ticket; specifically, the maximum legal load for the haul route and the name of the pay item being delivered. This Special Provision will be included in proposals starting with the February 2016 letting, and may be considered applicable to any current projects on which the Contractor has the capability to meet the new specification requirements. 26th Annual Alabama Asphalt Pavement Conference

12 Electronic Weighmaster Signatures
Feb. 3, 2016 letter to ARBA and AAPA: An aggregate supplier contacted this office asking for clarification of the intent of our February 1, 2016 letter stating that the Department would begin allowing electronic signatures on weight tickets at scale locations with remote ticketing capability. The supplier asked if it would also be allowable to utilize electronic signatures at scale location that do not have remote ticketing capability. At such locations, the Weighmaster would sign the ticket electronically, but still physically deliver the ticket to the driver. The answer to the supplier’s question is yes, the Department’s will allow electronically signed tickets delivered in this manner. 26th Annual Alabama Asphalt Pavement Conference

13 26th Annual Alabama Asphalt Pavement Conference
Topics of Discussion -Work Zone Safety Issues / Initiatives: Portable Rumble strip drawing and Special Provision -Procedures for removing construction signs: Addressed in CIM which states that after maintenance acceptance, the Region Engineer may consider removal of TCDs. There should be no reason to leave devices in place after all punch list work is complete. -Over weight Loads 26th Annual Alabama Asphalt Pavement Conference

14 25th Annual Alabama Asphalt Pavement Conference
Effective date was June 1st . Many of these changes were discussed last year. I’m only going to cover the highlights. 25th Annual Alabama Asphalt Pavement Conference