1 Danish Project Experience
Søren Varming Senior consultant, Climate Change, SV Carbon Contact:

2 Overview of Danish CDM programme in Asia
Country Bilateral agreement Capacity building Project development Malaysia April 2003 2nd phase started 1. March 2004 “Search and select” approach Thailand N/A Started August 2005 Two calls for proposals in 2003/04 China February 2004 Project development linked to mixed credits Indonesia July 2005 Small activity on going First call for proposals closed early November 05 Second call open till April 2006

3 Status for Danish CDM project development
Country Type Size t CO2 Status Egypt Wind farm 600,000 ERPA Malaysia Biomass boiler 200,000 220,000 LoI 60,000 Landfill gas 900,000 Composting 1,500,000 Thailand Biogas sewage 300,000 Biogas pig farm 1,000,000 4 biomass/biogas 3,450,000 China 3 district heating 6,800,000 LoI (Meth issues)

4 Case study 1 – Impact CDM on CHP project
CHP technology used at a palm oil mill Power generated will be connected to the grid and partly used for on site consumption Project displaces power from grid connected fuel plants and biomass used for heat generation (e.g. no CERs related to heat) Contribution CDM is 1.1 sen/ KWh

5 Case study 2 – Impact of CDM for Palm Oil Mill Effluent
Mill with capacity of 40 ton of Fresh Fruit Bunches per hour Power generated will be connected to the grid Contribution from CDM is more than half of the electricity tariff Impact of CDM is different per technology used

6 CDM changes the investment priorities

7 Seize the opportunities
Be aware of opportunities Methane reductions Direct saving/replacement of coal Industrial gasses (HFC, N2O, SF6) Screen project portfolio Include CDM early in project cycle Get help for the paper work Royal Danish Embassy in Jakarta, Kuala Lumpur, Bangkok, Beijing

8 Secretariat of Danish CDM Project Facility
Contact Secretariat of Danish CDM Project Facility c/o Royal Danish Embassy Menara Rajawali 25th Floor, Jl. Mega Kuningan, Jakarta Telephone: ext 114 or ext 306 Fax: Website: