Download presentation
Presentation is loading. Please wait.
Published byAntony Fields Modified over 7 years ago
1
Stormwater & Pretreatment Team Water Quality Division (512) 239-4671
Texas Pollutant Discharge Elimination System (TPDES) Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Trade Fair May 16-17, 2017 Hanne Lehman Nielsen Rebecca L. Villalba Stormwater & Pretreatment Team Water Quality Division (512)
2
Municipal Separate Storm Sewer Systems (MS4)
The two images shows a sign with the text “no dumping, drains to bay” and the other image shows a stormwater control. An MS4 is a publicly owned or operated stormwater drainage system designed to collect and convey stormwater
3
Which MS4s are Regulated?
Medium and Large MS4s (“Phase I”) Individual TPDES Permits Small MS4s in Urbanized Areas (Phase II”) TCEQ Small MS4 General Permit – TXR040000 Combined Phase I and Phase II MS4s Individual MS4 Permit for Texas Department of Transportation – WQ
4
Phase II MS4 General Permit, TXR04000
Regulates stormwater discharges from publicly owned or operated “Small” MS4s located in urbanized areas (UAs) Population based on the 2000 and 2010 U.S.Censuses Renewed December 13, 2013 – 5 year permit term General Permit 2007 Authorizations Issued Permit 2013 Applications Received NOIs 406 539 Waivers 66 78 Total 472 617 UA – and area of high population density as defined and used by the US Census Bureau in the 2010 census. We got almost 150 new ones under the 2013 permit By March 14 there is only 12 that have not renewed *12 have not renewed yet
5
Phase II MS4 General Permit
Tiered Permitting Approach - based on population in the UA Level 1 - Up to 10,000 Level ,000 to 40,000 includes non-traditional MS4s Level ,000 to 100,000 Level 4 - More than 100,000 Waiver option for population less than 1,000 Level 2 includes non-traditional MS4s such as MUDs, Counties, Drainage districts, transportation authorities Designation of applicable tier is based on population levels of most recent census at the time the NOI is submitted. No changes during the permit term. *Based on the 2000 and 2010 U.S.Censuses
6
Phase II MS4s Active Authorizations
Level Active Authorizations 1 107 2 340 3 43 4 11 We have received 501 NOIs and 77 waivers. Image is a pie chart that represents the numbers of each level. Waivers are also represented. This is done by percentages.
7
Requirements of Phase II MS4s
Develop and Implement a Stormwater Management Program (SWMP) Develop an implementation schedule Implement in yearly intervals over the five year permit term Must be fully implemented at the end of the five year permit term Coalitions Develop, implement, and share same SWMP Usually share a boundary or watershed Each MS4 is responsible for its own compliance Agreements with clear delineation of responsibilities According to 40 CFR Part
8
Requirements of Phase II MS4s
Contents of a SWMP Six Minimum Control Measures (MCMs) Operators must address to reduce pollutants from the MS4 to the Maximum Extent Practicable (MEP) List of best management practices (BMPs) Measurable goals including frequency, month, and year Schedule for implementation
9
Requirements of Phase II MS4s
Minimum Control Measures (MCMs) Public Education, Outreach, and Involvement Illicit Discharge Detection and Elimination Construction Site Stormwater Runoff Control Post-Construction Stormwater Management in New Development and Redevelopment Pollution Prevention and Good Housekeeping for Municipal Operations Industrial Stormwater Sources (Level 4 only) Optional MCM for Construction done by the Permittee (MS4) Additional requirements for discharges into impaired waterbodies The MS4s needs to establish measurable goals for each MCM to evaluate and assess the effectiveness of stormwater controls and the SWMP as a whole. MCM 1: Distribute educational material or do outreach activities about impacts of stormwater discharges on waterbodies. Brochures, billboards, TV, websites. Involve the public stream clean ups - storm drain stenciling - volunteer monitoring - Adopt a Highway programs MCM 2 – IDDE Detect, investigate, and eliminate illicit discharges to MS4. e.g. sanitary sewer overflow - dumping of used motor oil - sediments leaving a construction site. MS4 map - staff training - facilitate public reporting - hot line - procedures for responding to illicit discharges and spills MCM 3 – Construction Ensure construction sites use erosion and sediment controls. : Required to Inspect construction sites - review site plans – train staff - receive information from the public – hot lines. MCM 4 – Post construction - long term operation and maintenance of structural and nonstructural controls – public and private sites MCM 5 – Pollution Prevention and Good Housekeeping for municipal operations. O+M program to prevent stormwater pollution from municipal operations. Parks and bridges - streets - ROWs – vehicles - storm sewers - maintenance yards - waste transfer stations – sw controls. List of MS4 facilities - train staff - waste disposal according to existing rules - oversight of contractors. MCM 6 –Industrial facilities – only for Level 4s – program to control pollutants in SW from industrial facilities. Must include landfills, municipal waste treatment facilities - Can include other industrial or commercial facilities Optional 7th MCM – where the MS4 is the construction site operator- can be used as an alternative to the MS4 seeking coverage under the construction general permit (TXR150000) Implementation of SWMP Develop a schedule Implemented in yearly intervals over the 5 year permit term Must be fully implemented at the end of the 5 year permit term Coalitions Develop, implement, and share same SWMP Usually share a boundary or watershed Each MS4 is responsible for own compliance Enter into agreements with clear delineation of responsibilities
10
Impaired Water Bodies Additional Permit Requirements
Category 5 - CWA 303(d) for stream segment, no TMDL Category 4 - Not on CWA 303(d), with watershed TMDL Texas Integrated Report Index of Water Quality Impairments Image of page from texas integrated report Category 4 - watershed level Category 5 – stream segment level Image of creek Source: – Image of page fromTexas Integrated Report Index of Water Quality Impairments Source:
11
Requirements of Phase II MS4s
Annual Report Due 90 days after reporting year Flexibility selecting reporting year Fiscal year, calendar year, or permit year Reporting year can not change during the permit term Use Annual Report Template (Form 20561) Reporting year cannot change during permit term
12
Annual Reports – Helpful Hints
Always send certifications with original signatures, not scanned or copied Always indicate which reporting year option you have chosen with exact dates of the period Please respond to s requesting information in a timely manner This is the time to report your accomplishments and show progress! Coalition reports should include associated entity with certification signature
13
Phase II Annual Reports
Submit the original report to the TCEQ Stormwater & Pretreatment Team (MC 148) Submit a copy of the report to the appropriate TCEQ regional office Specify in the report cover letter that the TCEQ Regional Office has been sent a copy of the report Retain a copy of the report on site Annual Report template (Form 20561) available: Always use the most recent template SBLG renewed the template for the annual report – will revise again. It is a requirement to use the template.
14
Phase II Annual Reports
Issues identified during reviews Late submittals Cover letter not dated Not using the most recent annual report template Impaired water bodies - not including a benchmark value when discharging to a TMDL watershed or indicating the pollutant of concern Not quantifying activities conducted
15
Phase II MS4 Notice of Change
Notice of change (NOC) Changes to SWMP Form: TCEQ – 20392 Submit separately from the Annual Report NOC is needed to: Replace an infeasible BMP with an alternative BMP All other changes specified in permit NOC is not needed for Adding BMPs or replacing a BMP with a similar BMP Non-substantive changes De-annexing land The NOC was updated. More changes can be done to the SWMP without submitting an NOC – adding components, controls or requirements to the SWMP or replacing a BMP with an equivalent BMP Do not submit the NOC with annual reports. Indicate clearly what the changes are in the SWMP. Submit revised pages of SWMP – which clearly show the changes. Use strikeout text.
16
New NPDES Rules – Phase II MS4 Remand Rule 40 CFR §§122.33 and 122.34
Phase II MS4 Remand Rule – Published in Fed. Reg. December 9, 2016 with an effective date of Jan. 9, 2017 The regulations are revised to ensure that: States determine the adequacy of BMPs and permit requirements States provide public notice and opportunity for the public to request a public hearing The rulemaking result from a court decision in 2003 which found that MS4 Phase II regulation did not provide for adequate public notice, the opportunity to request a hearing, or permitting authorities to adequately review BMPs selected in the SWMP. EPA provided a strike out version of revisions to small MS4 rules (40 CFR §§ and ) and EPA added a paragraph (d) to 40 CFR requiring states to select between two types of general permits
17
New NPDES Rules – Phase II MS4 Remand Rule 40 CFR §§122.33 and 122.34
This is a procedural rule – no substantive changes are made to the Phase II MS4 requirements Includes two options for states to administer their Phase II MS4 programs Option 1: Comprehensive general permit approach The general permit needs to include all requirements necessary to meet the MS4 permit standard “to reduce pollutants to the maximum extent practicable” (MEP). Option 2: Two-step General Permit The general permit includes some requirements for all MS4s The state established additional requirements and BMPs for individual MS4s (this is in the SWMPs).
18
New NPDES Rules – Phase II MS4 Remand Rule 40 CFR §§122.33 and 122.34
All permits must be written with terms that are “clear, specific, and measurable” The general permits need to use “mandatory” terms and cannot use terms such as: as practicable, should, encouraged, etc. if feasible, cannot be used unless it is defined The permit language needs to be worded in a manner that will help assess compliance and track whether measurable goals have been met by the MS4. EPA published examples of provisions from general permits across the country
19
New NPDES Rules – Phase II MS4 Remand Rule 40 CFR §§122.33 and 122.34
Certainty in specific actions and requirements Avoid words such as “if practicable”, “as necessary”, “should” Clear Provide level of detail in requirements that portray level of effort(s) needed from MS4 to comply Specific Requirement needs to be articulated in a manner to assess compliance in a straightforward way Measurable
20
New Federal Rules – Electronic Reporting Rule 40 CFR Part 127
Electronic Reporting Rule – effective Dec. 21, 2015 Requires electronic submittal of applications and reports Phase 1 of Rule: DMRs need to be submitted electronically by Dec. 21, 2016 Phase 2 of Rule: General permit applications (NOIs) and MS4 reports need to be submitted electronically by Dec. 21, 2020
21
New Federal Rules – Electronic Reporting Rule 40 CFR Part 127
Electronic Reporting Rule – effective Dec. 21, 2015 Appendix A of 40 CFR 127 – includes list of elements that need to be reported electronically Waiver option is available from eReporting (permanent and temporary) Religious beliefs No internet access Training needed
22
Small MS4 General Permit, TXR04000 2018 Renewal
Internal TCEQ input – Feb. 2017 Stakeholder Meeting – March 21, 2017 Comment period ended – April 4, 2017 Development of draft permit – April/June 2017 EPA Review – Fall of 2017 Public comment period – Spring of 2018
23
Proposed Changes to Existing Permit Consistency with other TPDES General Permits
Part I – Definitions Define “Infeasible” - not technologically possible or not economically practicable and achievable in light of best industry practices Modify “Construction Activity” to include stockpiling of fill material and demolition Modify “Waters of U.S.” to remove “cooling ponds” Part I and Part II.D.4 – Impaired Water Bodies Add reference to Texas Integrated Report of Surface Water Quality for CWA Sections 305(b) and 303(d) when identifying an impaired water body. Part VI. – MCM 7 Lower benchmark value for TSS to 50 mg/L from 100 mg/L Analysis must be done by NELAP certified laboratories
24
Proposed Changes to Existing Permit Consistency with Federal Rules
Electronic Reporting Rule Add permit language to include eReporting rule – process is starting, details forthcoming EPA will develop tools to accept applications and reports from small MS4s Phase II MS4 Remand Rule Modify permit language to be clear, specific and measurable Avoid words: if practicable, as necessary, should, encouraged to Use mandatory words: must and shall
25
Proposed Changes to Existing Permit Examples of clear, specific, and measurable
MCM 1. Public Education, Outreach, and Involvement If feasible, consider using use public input (for example, the opportunity for public comment, or public meetings) in the implementation of the program MCM 2. IDDE Inspections – The permittee shall conduct inspections as determined appropriate, in response to complaints, and shall conduct follow-up inspections as needed to ensure that corrective measures have been implemented by the responsible party. The permittee shall develop written procedures describing the basis for conducting inspections in response to complaints
26
Proposed Changes to Existing Permit For all MS4s
Part II.A.5 Categories of Regulated MS4s Annexation of land resulting in a level change: Clarification of requirement to submit an Notice of Change Within 90 days have a plan for implementing the SWMP in new areas Implement program in new areas as expeditiously as practicable but no less than three years Part II.D.4 Impaired water bodies and TMDL Requirements Clarify terms – benchmarks, decorative ponds, pet waste Clarified requirement to check if a water body within the MS4s permitted area has been added to the latest 305(b)/303(d) list. Newly impaired waterbodies must be addressed in the SWMP. Definitions are to be consistent with other GPs
27
Proposed Changes to Existing Permit For all MS4s
Part II.E.3 Stormwater Management Program New requirement to review the SMWP once a year in conjunction with completion of the annual report. Clarification that annexing or de-annexing land that results in a level change will require an NOC Part III.A. (2) Content of the SWMP New requirement that measurable goals selected must be “clear, specific and measurable” Part III.B. MCM 1 Publish SWMP and annual report on MS4s public website – if MS4 has one Definitions are to be consistent with other GPs
28
Proposed Changes to Existing Permit For Level 4 MS4s only
Part III. B. 2 MCM 2. Illicit Discharge Detection and Elimination Clarify that MS4s identify priority areas likely to have illicit discharges Add a program to control the discharge of floatables into the MS4 Part III.B. 5. MCM 5. Pollution Prevention and Good Housekeeping for Municipal Operations Add a program to evaluate new and existing flood management projects for their water quality impact Part III.B.6. MCM 6. Industrial Stormwater Sources Clarification of language to include priorities and procedures for inspections to existing program
29
Phase I MS4s Medium and Large MS4s
Municipal population 100,000+ (1990 U.S.Census) Includes public entities in the UA Transportation authorities, universities, counties, districts, etc. Universe: 22 individual TPDES permits Includes 50 permittees due to coalitions Individual permits. Original applications were sent to EPA in No new phase 1 permits will be issued. Coverage is provided for all areas within Jurisdictional Boundaries such as city limits, TxDOT ROW within the city limits, universities within a regulated city based by rule, on 1990 US Census. Universe will soon change to 22 indv. permits. (TxDOT Austin, Dallas, Beaumont, and Houston will disappear and get under the TxDOT statewide permit) *No new permits issued
30
Requirements of Phase I MS4s
Develop a SWMP to address MCMs in permits Public Education and Outreach/Public Involvement and Participation Pollution Prevention/Good Housekeeping for Municipal Operations MS4 Maintenance Activities Illicit Discharge Detection and Elimination Construction Site Runoff Post-Construction Control Measures Industrial & High Risk Runoff Content of Permits More similar to phase II – permit renewal started in 2011 combined program elements into 8 categories and renamed them Minimum Control Measures (MCMs)
31
Requirements of Phase I MS4s
Monitoring Requirement Options Representative Storm Events Representative Rapid Bioassessment or Watershed Monitoring Regional Wet Weather Characterization Program
32
Requirements of Phase I MS4s
Monitoring of Floatables Often required in two locations at a frequency two times per year Report the amount collected Submit Annual Reports TCEQ reviews and provides feedback
33
TxDOT MS4 Statewide Individual Permit WQ0005011000
Permit was issued on Nov. 30, 2016 Coverage replaces TxDOT responsibilities in 11 Phase I MS4 permits where TxDOT was a copermittee 4 Phase I MS4 TxDOT permits 19 Phase II MS4 authorizations under the Phase II GP Coverage includes 22 new Phase II MS4 areas EPA and TCEQ and TXDOT had meetings in 2012 and TxDOT and TCEQ had meetings in 2013. It is a complex permit and therefore delayed.
34
TxDOT MS4 Statewide Individual Permit WQ0005011000
All requirements in Phase I and Phase II MS4 permits are carried over into TxDOT permit Previous Phase I MS4 co-permittees reapply without TxDOT Image is a sign saying “Welcome to Texas – Drive Friendly – The Texas Way
35
Phase I MS4s Permit Renewals
EPA Review of the Renewals from 2011 Requiring similar requirements as in the Phase II MS4 General Permit Priority areas MS4 maps Impaired waterbodies Requesting to see inspection or audit reports completed by TCEQ List of priority areas was included in one permit List of construction sites and procedures for inspection of industrial sources added to multiple permits We included a mapping of the MS4 system requirement. TMLD requirements similar to Phase II GP All of them have been reissued except 5 permits plus a statewide MS4 permit for TxDOT: Waco, City of Corpus Christi, Houston Task Force, San Antonio, Houston Port Authority TxDOT - published notice Four permit will disappear: TxDOT Austin, TxDOT Dallas, TxDOT Beaumont and TxDOT Houston Permits withTxDOT are issued without because TxDOT is applying for its own statewide individual permit.
36
Phase I MS4 Permit Renewals
All permits will be revised to address comments made by EPA on previous MS4 permits Measurable goals are required for MCMs Provision from existing permits are continued E-Reporting Rule provisions for DMRs and annual reports No other major changes are expected Use application form TCEQ (no changes) Attachment 4 – will be requested by permit writer Senate Bill 709 – legislative notice requirement TCEQ started implementing Senate Bill 709 on Sept 1, Once a permit is drafted notice is send out to the local legislators.
37
Phase I MS4 Permit Renewals
Permit applications received in 2015 – 2016 City of Dallas City of Mesquite City of Austin – EPA Objection City of Garland City of Fort Worth, Tarrant Regional Water District City of Beaumont, Jefferson County Drainage District 6 City of Abilene – EPA Objection North Texas Tollway Authority – EPA Objection University of Texas at Austin – EPA Objection City of El Paso – EPA Objection City of Pasadena City of Laredo and Laredo Community College in 2015 – 2016 we have received 12 permit applications
38
Phase I MS4 Permit Renewals
MS4 permits that moved to the TxDOT Statewide MS4 permit TxDOT - Dallas TxDOT - Austin TxDOT - Beaumont TxDOT - Houston District (Pasadena) Permits still pending from 2011 renewal City of Corpus Christi, PCCA, Del Mar College District, Texas A&M City of San Antonio City of Houston, Harris Co., Harris County Flood Control District three permits are expired and still pending - drafted and are in various stages for renewal process. Four TxDOT permits will not get renewed – they got under the TxDOT Statewide MS4 permit
39
TPDES Stormwater Program Contacts
Water Quality Division Stormwater & Pretreatment Team Rebecca L. Villalba, Team Leader Lindsay Garza, Work Leader Hanne Lehman Nielsen Dan Siebeneicher Gordon Cooper Kent Trede Jessica Alcoser Austin Office: (512) This is a list of the members of the stormwater team The image is of a business style phone
40
Contact Information Small Business and Local Government Assistance (SBLGA) (800) Permitting Information (Technical) (512) Phone numbers, addresses and links are given for SBLGA and the Stormwater team The image is of a hand holding a green marker and the words “call us” written out
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.