Download presentation
Presentation is loading. Please wait.
1
CITY SANITATION PLAN - AMBAJOGAI
PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED
2
CONTENTS SECTION I: OVERVIEW AND CONTEXT SETTING
INTRODUCTION LOCATION AND REGIONAL SETTING DEMOGRAPHIC PROFILE ADMINISTRATIVE DETAILS AND SLUM PROFILE CONTEXT OF WATER SUPPLY IN AMBAJOGAI SECTION II: SECTORAL ANALYSIS AND PLAN PROPOSALS ACCESS TO SANITATION FACILITY (TOILETS) – HOUSEHOLD, COMMUNITY AND PUBLIC SANITATION FACILITIES WASTEWATER, SEPTAGE AND STORM WATER MANAGEMENT SOLID WASTE MANAGEMENT SECTION III: MUNICIPAL FINANCE ANALYSIS MUNICIPAL FINANCE ANALYSIS FINANCING PLAN SECTION IV: SUMMARY AND FINANCING ALTERNATIVES PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED
3
SECTION I: OVERVIEW CONTEXT SETTING INTRODUCTION
LOCATION AND REGIONAL SETTING DEMOGRAPHIC PROFILE CITY ECOLOGY CONTEXT OF WATER SUPPLY IN AMBAJOGAI PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED
4
INTRODUCTION SALIENT FEATURES - AMBAJOGAI DEMOGRAPHY
Cultural capital of Marathwada region Cultural tourism: A famous temple of goddess Yogeshwari Devi 1st rural Medical College in Asia - "Swami Ramanand Teerth Medical College" District Beed Location Lat 18°44′N and Long 76°23′E Connectivity Connected by SH 156 and SH 162, Latur (94km) & Beed (110 km ) Nearest railway station-Parli Vaijnath (23km) Civic status Nagar Parishad ‘B’ class Area 10.18 sq km No. of Wards 7 prabhags (28 wards) POPULATION FORECAST Method Year AM IM GM PM Other method 2012 81067 81169 81877 82160 82500 2013 82133 82356 83798 84320 84200 2021 90665 92524 100880 101600 87500 2028 98131 102397 118660 116720 89200 2031 101330 106907 127210 123200 93000 2041 111995 123149 160411 144800 98500 2043 114128 =133000* 168027 149120 100000 Note: Incremental increase method has been adopted as it is appropriate for moderately developing town as Ambajogai. With consideration of 6500 as floating population; total population adopted as * for design year 2043. PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED
5
Pop. density (per/sq km)
SPATIAL PATTERN OF DEVELOPMENT ADMINISTRATIVE DETAILS Prabhag no. Area (sq km) Population Pop. density (per/sq km) 1 1.74 12160 6988 2 0.32 11051 34534 3 0.91 10540 11582 4 1.53 11186 7311 5 0.36 9687 26908 6 1.96 15074 7690 7 3.36 10302 3066 Total 10.18 80000 7858 SLUM PROFILE Sr. no. Name Prabhag no. Area in sq. m. Population Households 1 Wadarwada 7 20240 1172 225 2 Dhorpura 11550 348 80 3 Sadar Bazaar 6 6500 596 121 4 Panchseelnagar 29120 2706 451 5 Parlives 31500 3618 680 Gandhinagar 52000 1451 284 Raviwarpeth 8000 1791 332 8 Siddharthanagar 12960 1681 289 9 Millind nagar 48200 2741 496 10 Kabirnagar Raigadnagar 34048 2177 368 11 Dhobighat 9000 502 100 12 Pensionpura 32400 1475 248 Total 295518 20258 3674 The city of area sq km is divided into 7 prabhags with old 28 wards Prabhag no. 2 and 5 are dense occupied prabhags (Gaothan area) with highest population density 12 slum pockets constituting 26% of the total population PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED
6
Authorised consumption
WATER SUPPLY IN CONTEXT OF AMBAJOGAI Manjra & Kalwati Dam WTP Surface water Storage 12.74 MLD 4 GSR 8 ESR Distribution Meter Unbilled authorized consumption: MLD Billed metered consumption: 0.00 MLD Billed unmetered consumption: 8 MLD Unauthorized use and leakages on transmission mains and on distribution line: 3.99 MLD Revenue water 5.04 MLD (72.32%) Non revenue water 2.26 MLD (27.68%) Authorised consumption Apparent losses Real losses 65% of coverage of water supply Only 36% of cost recovery Water audit and rehabilitation and augmentation of lines expected to complete by 2015 WATER SUPPLY IN SLUMS KEY ISSUES No regularity in water supply. Water is supplied only once in 3 days High percentage (33%) of extent of unaccounted water Coverage of water supply connections is about 65% (PAS data) Cost recovery of water supply services is only 36% INTERVENTION Water audit and rehabilitation and augmentation of lines expected to be completed by 2015. Key features : Augment water supply to 135 LPCD Provision of metering of water connections Augmenting new water distribution lines (Water audit and feasibility studies and FGD – Ambajogai ULB, members) PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED
7
SECTORAL ANALYSIS AND PLAN PROPOSAL
SECTION II: SECTORAL ANALYSIS AND PLAN PROPOSAL ACCESS TO SANITATION FACILITY (TOILETS) – HOUSEHOLD, COMMUNITY AND – PUBLIC SANITATION FACILITIES WASTEWATER, SEPTAGE AND STORM WATER MANAGEMENT SOLID WASTE MANAGEMENT PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED
8
ACCESS TO SANITATION FACILITY – HOUSEHOLD LEVEL SANITATION
SANITATION VALUE CHAIN User interface Collection Conveyance Treatment Reuse /Disposal Pour flush latrine Existing Pit and Septic tank with drain field Open/covered drains No Periodical Sludge removal from tanks/ pits No conveyance system in new developments Into river/natural drain Dumping along with solid waste 30% of population practices open defecation Lack of knowledge about functioning of septic tanks Prabhag 1,3 and 6 – critical for availability of sanitation facility SANITATION COVERAGE ON-SITE COLLECTION/TREATMENT ON-SITE COLLECTION/TREATMENT Census of India 2011 Total households 14517 Households having individual toilets 9663 Toilets with septic tanks 7703 (80%) Toilets having pits 670 (7%) Toilets having other type of disposal 1290 (13%) Source: Census of India, 2011 KEY ISSUES About 30% of population practices open defecation Prabhag 1, 3 and 6 are very critical in terms of availability of sanitation facilities Common practice of construction of septic tank/ pit beneath superstructure hampers cleaning of septic tanks Lack of knowledge about functioning of septic tank results in hampering primary treatment About 50 septic tanks cleaned annually (as informed by ULB) PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED
9
ACCESS TO SANITATION FACILITY – COMMUNITY LEVEL SANITATION
LOCATION OF COMMUNITY TOILET BLOCKS Community maintained toilet blocks – Panchsheel nagar, Milind nagar, Wadarwada Poor O&M leads to unhygienic condition of blocks Lack of availability of water and electricity Non-functioning of toilet blocks leads to open defecation Lack of O & M in community toilet blocks CONDITION ASSESSMENT OF TOILET BLOCKS KEY ISSUES Details Prabhag HH No. of blocks No. of seats No. of men No. of women No. of functional seats Managed by Desired seats 1 2043 14 91 46 45 49 ULB (12) & Community (2) 220 2 1915 3 24 12 ULB 2042 7 48 22 95 4 2493 11 ULB (2) & Community (2) 5 1689 8 44 6 2345 Community 2026 71 Poor O&M resulting into unhygienic condition of toilet blocks Most of the toilet blocks are in dilapidated condition Non-availability of regular water supply Non-functioning of toilet block leads to open defecation Non-availability of electricity makes toilet blocks unsafe for using during nights PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED
10
Lack of maintenance of toilet blocks
SANITATION IN SLUMS COVERAGE OF SANITATION IN SLUMS Details No. Slum households 3342 Slum households with HH toilet 1608 Household relying on CTs 67 No. of seats in CTS 249 No. of functional seats in CTS 133 Household practicing OD 2440 Lack of maintenance of toilet blocks Lack of ownership about community level sanitation facilities * 73% OD observed in slums as per PAS data Name Prabhag name Toilet blocks Total seats Functional seat Wadarwada 7 1 8 Dhobighat 4 18 Dhorpura 10 5 Siddharth nagar 16 2 Milind nagar 3 20 Gandhinagar Ravivar peth Panchsheel nagar Pelives 13 Sadarbazaar Dukan kendra 6 Kabirnagar Raigadnagar Pensionpura Total (slum area) 14 133 69 KEY ISSUES Lack of maintenance of toilet blocks Non-availability of regular water supply Lack of ownership about community level sanitation facilities PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED
11
ACCESS TO SANITATION FACILITY – PUBLIC LEVEL SANITATION
LOCATION OF PUBLIC TOILET BLOCKS Poorly maintained public urinals Near bus stand Near Dasopant samadhi parisar Public urinals-Gross lack of maintenance, broken infrastructure and non-availability of water Public toilets-Inadequate seats for women and no consideration for physically challenged Public toilet block near bus stand Lack of adequate and clean public sanitation facility around Yogeshwari temple area KEY ISSUES Irregular supply of water in public toilet blocks Absence of covered enclosures in public urinals Inadequate seats for females No consideration for physically challenged Lack of public sanitation facilities around the Yogeshwari Temple premises and Market areas Gross lack of maintenance and broken infrastructure of urinals makes it difficult to use Lack of awareness and ownership towards public sanitation make toilets misfit for use CONDITION ASSESSMENT OF TOILET BLOCKS Name of the Area No. of Seats Urinals Bathing area O & M User charges Septic tank Bus Stand 10 male + 2 female 10 1 female private operator Rs. 2 per use Poorly maintained Overflowing of sludge Dasopant Samadhi area 3 male + 3 female Used during festivals no yes PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED
12
Step 1 Step 2 Step 3 PROPOSED STRATEGIES-SANITATION
Priority is to reduce Open Defecation immediately Provide 100% Household Sanitation Coverage Short term Initiate schemes for individual toilets Promote household sanitation though IEC campaigns Step 1 Enforce law for regular cleaning of septic tank Introduce O&M of CTs on pilot basis through involvement of local CBOs/NGOs Rehabilitation of existing community toilet blocks Rehabilitation and Upgrading of existing infrastructure in both public toilet blocks HHs CT PT Mid term Achieving 100% household sanitation coverage Step 2 Modify community toilets in market area to serve as public toilets and introduce private contractor for O&M and levy user charges HHs CTs Long term Eliminate dependency on all the community toilets Step 3 PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED
13
PROPOSED STRATEGIES-SANITATION
SECTOR KEY ISSUES PROPOSED STRATEGIES Short term Mid term Long term 2 year 15 years 30 years Household Sanitation 30% open defecation Only 66% of households have individual toilets only 4% households rely on CTs Promote household sanitation though IEC campaigns ILCS scheme to be promoted amongst EWS Explore an option of facilitating access to credit for household toilets through SHGs /credit cooperative societies/MFIs Enforce law for regular cleaning of septic tank Community Sanitation Pitiable infrastructure compels dwellers to defecate in open Inadequate human resource for maintenance of CTs Gross lack of O&M by ULB Lack of O&M by ULB Rehabilitation of existing blocks Introduce O&M of CTs on pilot basis through involvement of local CBOs/ NGOs Convert community toilets in market area in public toilets by outsourcing O&M to private contractor and levying user charges Public Sanitation Irregular supply of water Gap of seats especially seats for female users in public toilets Lack of child friendly toilets Not cleaned regularly Lack of public sanitation facilities around the Yogeshwari Temple No regular cleaning of urinals The infrastructure of urinals is either broken or misfit to use Rehabilitation and upgrading of existing infrastructure in both public toilet blocks Improve quality of services and existing O&M practice Ensuring regular cleaning of septic tanks and toilets by ULB and private contractor Rehabilitation of all urinals with quality services Rehabilitation of all broken seats, with supply of water to ensure regular cleaning Convert community toilets in market area in public toilets by outsourcing O&M to private contractor and levying user charges PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED
14
PILOT LEVEL INTERVENTIONS-SANITATION
PROMOTING INDIVIDUAL TOILET IN DHOBI GHAT, DOHPURA AND SLUMS SECTOR EXISTING STATUS SUGGESTED PROPOSAL Household Sanitation Pilot for providing household level sanitation can be taken up in 3 slums considering, Households practicing open defecation Households preferring individual toilets Households willing to pay for household sanitation facility 1 2 Imagery of Dhobighat Imagery of Dhorpura Slum No. of HH HH with toilet HH relying on community HH practicing OD Preference for individual toilet Willingness to invest in toilets Unit cost of toilet Total cost Grant under Sujal Nirmal /ILCS Paid by user + ULB Dhobighat 100 28 72 100% Rs (60%) Rs. 14,000 Rs lakhs Rs lakhs Rs lakhs Dhorpura 80 80% Rs lakhs Rs lakhs Rs. 1.6 lakhs Sadar Bazaar community toilet needs to be rehabilitated as The percentage of OD in this slum is 100% 10% people prefer community toilets Average monthly income up to Rs. 5000, which is lower than other slums At present, women SHG is ready for O&M of toilet Community level sanitation 3 KEY MAP 3 2 1 Imagery of Dhobighat PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED
15
ACCESS TO TOILET FACILITY
Providing individual toilets in slum areas (787 HH) (Rs crore) Upgrading Community Toilet Blocks with improved infrastructure and on-site collection-treatment (Rs crore) Rehabilitation and Upgrading of existing infrastructure in both public toilet blocks (Rs crore) Rehabilitation of all public urinals (Rs crore)
16
WASTEWATER, SEPTAGE AND STORM WATER MANAGEMENT
PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED
17
Waste outlets connected to
GREY AND BLACK WATER MANAGEMENT EXISTING WASTEWATER MANAGEMENT PRACTICES OBSERVATIONS Open/covered drains No treatment Into natural drain/ river Kitchen Bathrooms Domestic washing activities Lack in technical designs of conveyance system and relies on open drain channels along the streets Lack of conveyance system for some of newly developing areas into open areas No separate system of grey and black water No treatment facility for domestic wastewater Disposal of solid waste into Nallas Lack of implementation and enforcement of building bye-laws, which state, “it is necessary to develop an on-site treatment facility of septic tank followed by soak pit” Lack of technical designs for conveyance system Lack of conveyance system in newly developed areas CONVEYANCE SYSTEMS Disposal of solid waste into nallas Source: Census of India, 2011 No. of household Waste outlets connected to closed drains open drains no drains 14,517 2,957 10,342 1,218 PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED
18
Wastewater generation(MLD)
GREY AND BLACK WATER MANAGEMENT SANITATION CLUSTERS PARAMETERS Cluster 1 Cluster 3 Cluster 2 Cluster 2 generates almost 80% of sewage and has slope towards River Jaywanti Cluster 1, 3, and 4 generate minimal amount of sewage and has slope towards other water bodies outside municipal bodies Cluster 3 and 4 comprise future residential areas Cluster 4 TOPOGRAPHY AND EXISTING NATURAL DRAINAGE An approach to develop sanitation zones or clusters is adapted in order to analyse the liquid waste management in more spatial context Natural drainage pattern is an important aspect that affects wastewater management practices The clusters show homogeneity of urban development characteristics, housing typology and street pattern, topography and flow direction of the water Zone Prabhag Total population Wastewater generation(MLD) Cluster 1 6 9044 0.9 Cluster 2 1,2,3,4,5,6,7 69902 7.4 Cluster 3 3 1054 0.1 Total 80000 8.4 PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED
19
GREY AND BLACK WATER MANAGEMENT
USER INTERFACE COLLECTION/ STORAGE CONVEYANCE DISPOSAL
20
GREY AND BLACK WATER MANAGEMENT
HOUSEHOLD SANITATION-ON-SITE TREATMENT AND DISPOSAL EFFLUENT OF SEPTIC TANK LET INTO OPEN DRAINS KUTCHA NALLAS; NOT CLEANED AND MAINTAINED REGULARLY; GROWTH OF SHRUBS ETC. ALONG THE NALLAS
21
GREY AND BLACK WATER MANAGEMENT
EXISTING CONVEYANCE SYSTEM ROAD SIDE DRAINS CLOGGED DUE TO DUMPING OF SOLID WASTE AND IRREGULAR CLEANING
22
GREY AND BLACK WATER MANAGEMENT
ROAD SIDE DRAINS CLOGGED DUE TO DUMPING OF SOLID WASTE AND IRREGULAR CLEANING
23
TOPOGRAPHICAL ANALYSIS FOR STORM WATER MANAGEMENT
ZONE 1 Area: 2.63 sq. km ZONE 2 Area: sq. km ZONE 3 Area:1.80 sq. km 3.62 Km 2.85 km 1.56 km 1.45 km 0.4 km 0.56 km Natural slope towards the river facilitate the flow of storm water Nallas and river flow from south to north Key issues The natural slope of the town is towards the river that facilitate the flow of storm water as well as sewage into the Jaywanti River No dedicated system for storm water collection, conveyance and treatment PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED
24
EXISTING NATURAL DRAINS
DISCHARGE OF SEWAGE AND DISPOSAL OF SOLID WASTE INTO NATURAL DRAINS DISPOSAL OF WASTE INTO RIVER JAYWANTI PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED
25
GREY AND BLACK WATER MANAGEMENT
SANITATION CLUSTERS ZONE 1 Institutional and agriculture Slope is towards the northern side ZONE 3 ZONE 1 ZONE 2 Mostly residential and commercial area Covered by open/closed drains Slope is towards the Jaywanti river ZONE 2 ZONE 3 Most of residential area Slope is not towards to Jaywavti River ZONE 4 ZONE 4 New development HHs connected to septic tanks No conveyance Slope is towards the lake PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED
26
SUGGESTED STRATEGIES FOR THE CONVEYANCE SYSTEM
SANITATION CLUSTERS PRESENT CONDITION SUGGESTED STRATEGIES ZONE 2 Mostly residential and commercial area Covered by open/closed drains Slope is towards the Jaywanti River Rehabilitation of drains (cleaning and covering of drains with cement concrete grating and PCC lining from 3 sides) Initiating intercepting sewer Intercepting sewer can be initiated along river, connecting to all road side drains to treatment plant OR Cleaning of road side drains ZONE 3 ZONE 1 ZONE 2 Replacing existing conveyance system to settled sewer- For the long-term solution-settled sewer as conveyance system can be implemented Or replacing existing system UGD ZONE 4 ZONE 1 Institutional and agriculture Slope is towards the northern side DEWATs - Zone 1,3 and 4 - Newly developed and future development areas Initiate DEWATs based on catchment areas of lakes Initiate suitable conveyance system for future development areas EXISTING MANAGEMENT PRACTICES ZONE 3 Residential area Slope is not towards Jaywavti River ZONE 4 New development HHs connected to septic tanks No conveyance Slope is towards the lake Initiate pilot for conveyance system in newly developed area of zone 2 (provided long-term strategy is implementation of conventional UGD) PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED
27
PROPOSED STRATEGIES FOR WASTEWATER MANAGEMENT
EXISTING WASTEWATER MANAGEMENT PRACTICES SUGGESTED STRATEGIES Only primary treatment as a septic tanks or pits but they are not functions proper No secondary treatment Develop conventional STP or suitable technology as waste stabilisation pond, ASP in north of the town (for zone 2) Develop suitable treatment (DEWATS) technology for zones (for zones 1, 3, 4) PILOT 1: DEWATS (NEAR BORDA LAKE) PILOT 2: DEWATS (JOGAIWADI LAKE) Total road length 4 km Households (2012) 200 Households (2043) (2043) Population 1000 Wastewater 0.108 MLD Proposed Land use in the proposed development plan Total road length 15 km Households (2001) 250 Households (2043) Population 3000 Wastewater 0.33 MLD PRIMARY TREATMENT (Septic tank/Pits) Assumptions: Solid free outlet Septic tank or pits are functioning properly and designed as per standards removal efficiency 25-40% SECONDARY TREATMENT (Anaerobic Baffled reactor, Anaerobic fixed bed reactor, Planted gravel) Wastewater passes in a series of chambers through the filter material in up-flow form. Removal efficiency 75-90% DISPOSAL (River, lake and agriculture use) Reuse of treated water for gardening and horticulture PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED
28
Step 1 Step 2 Step 3 SUGGESTED IMPROVEMENTS IN STORM WATER MANAGEMENT
Priority is to prohibit practice of dumping into natural drains Periodic cleaning of nallas and natural drains Short term De-silting of natural drains up to m (with the help of JCB machines) Step 1 Removal of solid waste and other garbage affecting flow Rs Cr Mid term Channelisation of natural drains with RCC from 3 sides Step 2 Achieving desired flow of storm water Rs Cr Long term Use of rehabilitated road side drains for conveyance of storm water, only if settled sewer lines are laid Step 3 Dedicated conveyance system for storm water PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED
29
WASTEWATER MANAGEMENT – Citywide settled sewer
Centralised treatment plant (Rs crore) Initiate pilot DEWATS at Borda lake (Rs Cr) Initiate interceptor sewer along river Initiate citywide settled sewer (Rs crore) Initiate DEWATS (Rs crore) and settled sewer as conveyance system
30
WASTEWATER MANAGEMENT – Rehabilitation of Drains+Phytorid System
Initiate pilot DEWATS at Borda lake (Rs crore) Rehabilitate existing drains (Rs crore) Initiate Phytorid system (Rs crore) Initiate DEWATS (Rs crore) and settled sewer as conveyance system
31
WASTEWATER MANAGEMENT – Conventional Sewer and DEWATS
Centralised treatment plant (Rs crore) Channelisation of river and natural drains (Rs crore) Pilot for UGD in Prabhag 4 (Rs crore) Initiate conventional UGD for zone 2 (Rs crore) Initiate DEWATS (Rs crore) and settled sewer as conveyance system
32
ON-SITE SANITATION SYSTEM
User interface Collection Conveyance Treatment Reuse/disposal Centralised or decentralised fecal sludge treatment facility Reuse for industrial/ Agriculture/energy conversion Septic tank Effluent disposed through soak pit Vacuum suction emptier trucks/trolley To achieve . . . Universal access to toilets Universal access to improved septic tanks & soak pits Safe conveyance of septage for treatment/reuse Adequate treatment of septage Economic revenue from reuse of treated septage By what means . . . Individual toilet Community toilet Public toilet Bathrooms New/refurbishment of septic tanks Connection of septic tank and grey water to household/ community level soak pits Possibility of DEWATS Provision of adequate vacuum suction emptier trucks and a regulated service Possibility of outsourcing services to private sector Provision treatment facility like sludge drying beds for collected septage Decentralised treatment sites to reduce transportation cost Revenue from sale of treated septage for agriculture purpose or conversion to energy
33
EXPLORING A CITYWIDE OSS PROPOSAL
User Interface Collection Conveyance Treatment Reuse / disposal Universal access to toilets Universal access to improved septic tanks & soak pits Safe conveyance of septage for treatment/reuse Adequate treatment of septage Economic revenue from treated septage New individual toilets (1,626) , and refurbishment of community (39 blocks), public toilets (2 blocks), public urinals (8 seats) Up-gradation (1,960) and refurbishment (3,852) of non-functional septic tanks New soak pits (14,007) Additional emptier trucks (5) with linked service Treatment of fecal sludge (9,206 sq mt) Income through sale of compost (4,249 tonne /year sold at Rs. 500/ tonne) or for energy Promotion programme for use of toilets, ‘septic tank conversion’ and ongoing regulatory monitoring Rs. 3.3 crore Public funds (subsidy), micro credit, PPP Rs. 7.2 crore Public funds (subsidy), micro credit, household own funds Rs. 0.5 crore Public funds, PPP, private entrepreneur Rs. 0.1 crore Public funds, PPP, private entrepreneur Public funds, PPP, private entrepreneur Business model for community/public toilets, explore microcredit options Develop separate or integrated business models for septic tank emptying, treatment and explore option for reuse or energy conversion
34
Decentralised Fecal sludge treatment facility
WASTEWATER MANAGEMENT – ON-SITE SANITATION OPTION Decentralised Fecal sludge treatment facility
35
COMPARISON OF WASTEWATER OPTIONS
Aspects OPTION 1 OPTION 2 Option 3 Description of Option Conventional Sewer Settled sewer On-site Sanitation System Financial Aspects Capital Costs Rs. 91 crore Rs. 45 crore Rs. 8.5 crore O&M Costs (average/annum) Rs. 3.8 crore Rs. 1.2 crore Rs crore Revenues (average/annum) Project Period 5 Sanitation Score Access Both options will have the same outcomes as per NUSP “Universal Access to All and 100 % Sanitised City” Waste management Other consideration Institutional Required technical knowledge for implementation and operation of this project Flexibility Extension of conventional sewer to new areas is difficult and expensive Can be easily extended to new areas, possibility of DEWATS in some areas Funding options Grants funding is essential Grants may be required or can be funded from ULB funds Can be funded from ULB funds Other parameters Appropriate design essential Need to assess soil permeability and water table levels for this proposal
36
SOLID WASTE MANAGEMENT
PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED
37
Mechanical composting
SOLID WASTE MANAGEMENT SOLID WASTE GENERATION SOLID WASTE MANAGEMENT Generation Transportation On-site management 17.87MT/day 13.25 MT/day Vermin-composting Mechanical composting Dump 1.50 MT/day 5.75 MT/day 6.00 MT/day Open dump 4.82 MT/day 27% 73% 1% 40% 55% SOLID WASTE COLLECTION LOCATION OF COMMUNITY BINS Dumping along natural drains Household level Door to door collection (70%) Collection from bins (119) No regularity in collection Daily collection Dumping ground (4 km away from the city) No Segregation Waste bins in the city PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED
38
SOLID WASTE MANAGEMENT – COLLECTION AND TRANSPORTATION
COVERAGE OF SOLID WASTE COLLECTION INFRASTRUCTURE FOR WASTE TRANSPORTATION Vehicle type No. Capacity in MT Trips/ day Operated by Total waste collected Dumper placer 1 0.35 10 ULB 3.5 Loader tractor 1.25 Used on landfill site -- Tractor trailer 2 2.5 Contract 5.0 3 wheeler auto tipper (ghantagadi) 7 0.05 5 1.75 SHG 0.5 Total 13.25 MT/day Vehicles for transportation of waste Newly developed areas from south and western side are not covered by Ghantagadi SANITATION IN SLUMS Sadar bazaar slum is neither covered by Ghantagadi nor community waste bin Waste dumped in open area, nallas PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED
39
SOLID WASTE MANAGEMENT – TREATMENT AND DISPOSAL
MECHANICAL AND VERMI-COMPOSTING Segregation of waste happens only at dump site Composting plant processes bio-degradable waste of about 5.75 MT/day (45%) of total waste. The capacity of plant is 20 MT/day though Inadequate human resource results into low efficiency of composting plant Minimal output from Vermi-composting unit (1% of total waste), used for gardening Operation and maintenance is now done by ULB. The contract of O&M dissolved due to affordability issues SANITARY LANDFILL SITE Sanitary landfill site (SLF) is located near processing facility Total area of dumping site is 10 acres Landfill site is designed for disposal of refuse from processing unit and inert material such as leachates SLF is designed considering waste generation for 25 years span in future 45% of total waste processed by composting plant Inadequate human resource at landfill site Minimal output of vermi-composting unit PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED
40
SOLID WASTE MANAGEMENT
Drains get clogged due to solid waste dumping PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED
41
SOLID WASTE MANAGEMENT
Improper maintenance of solid waste Overflowing waste bins PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED
42
SOLID WASTE MANAGEMENT
Dumping of solid waste in River Jaywanti Solid waste dumping in open areas, along road side gutters PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED
43
Collection and Transportation Non-residential Areas
KEY ISSUES IN SOLID WASTE MANAGEMENT Collection Transportation Treatment Reuse/Disposal Key issues 70% coverage by Ghantagadi (3 wheeler vehicles) Managed by ULB and Private contractor Collection and Transportation Dumping on existing landfill site for segregation Local Authority (ANP) New developments not covered daily Non-functioning bells of Ghantagadis increase dumping on open plots Residential Areas Collecting waste in waste bins which are cleaned by dumper placer managed by ANP No periodical emptying and transportation of waste. Inadequate number of bins in public areas Street sweeping of market areas and old town by 32 ULB workers and collection of waste by tractors No provision of litterbins for street sweeping. Considerable waste goes in open drains. Irregular street sweeping 20-25% of waste is used for composting infrastructure for mechanical composting is in place Inert landfill site is under construction Drain cleaning by 26 ULB workers. Daily collection of waste from road side drains by tractors Nalla cleaning is carried out once or twice in a year by borrowing JCB on rent Waste received at landfill site is treated as above No Treatment for waste from Nallas Nalla/Drain Cleaning Due to inadequate human resource, only part of area is covered for drain cleaning No regular Nalla cleaning Non-residential Areas Street Sweeping PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED
44
SUGGESTED IMPROVEMENTS IN SOLID WASTE MANAGEMENT
Short-term Collection and Transportation of Waste On-site Management of Solid Waste Collection Transportation Treatment Reuse/Disposal Improve waste collection Increase coverage of door to door collection to 100% Increase human resource for road side drain cleaning and street sweeping Involve informal groups for waste collection and segregation through Pilot in Sadar Bazaar Initiating pilot for segregation at source Augment and up grade vehicles for transportation Upgrade functioning of existing Ghantagadis Augment vehicles for newly developing areas Increase frequency of dumper placer Up grade existing infrastructure of treatment Up grade efficiency of vermi-composting plant considering waste generation Developing inert landfill site Mid/long-term Collection/segregation Transportation Treatment /Disposal Initiate segregation at user end Upgrade collection system by segregation at user end Introduce contractual arrangement for D2D collection, street sweeping nalla cleaning Formulate/enforce bye-laws and guidelines to prohibit littering Augment and vehicles for transportation Augment vehicles considering increasing population demand Implement user charges for solid waste management services Development of landfill site to cater waste generation Developing landfill site and vermi-composting plant with improved efficiency Developing a regional approach- Considering the regional urban centres near Ambajogai PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED
45
SUGGESTED IMPROVEMENTS IN SOLID WASTE MANAGEMENT
Parameter Issues Strategies Short term Mid term Long term Collection Only 74% of D2D collection and rest of waste is dumped into open space 100% door to door collection through increasing human resource on contractual basis -- Achieve sustainability through efficient collection system No D2D collection in newly developed areas Augment vehicles for newly developing areas Out of 119 waste collection bins, most are not usable Increase frequency of dumper placer or augment vehicles for collection of solid waste from the community bins Transportation Inadequate infrastructure for collection from community bins and door to door collection Augment vehicles for transportation Augment vehicles considering increasing population demand Non-functioning bells of Ghantagadis increase dumping on open plots Upgrade functioning of existing Ghantagadis Segregation No regular formal segregation. Groups of rag-pickers segregate some amount of waste Initiating pilot for segregation at source Involve rag pickers for waste collection and segregation through Pilot in Sadar Bazaar Initiate segregation at user end to town Treatment No monitoring system for regular checking of vehicles Inadequate human resource for monitoring and at landfill site Upgrade existing treatment mechanisms for bio degradable and recyclable wastes. Disposal Development of landfill site is under process - Developing landfill site and vermi-composting plant with improved efficiency Develop improved treatment and disposal through technological innovations Human resource Inadequate human resource for sweeping and regular cleaning leads to dumping in open areas Increase human resource for road side drain cleaning and street sweeping Monitoring Lack of periodic documentation of gap between waste generated and collected Initiate regular weighing for vehicles PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED
46
User interface Collection Conveyance Treatment Reuse/disposal
AMBAJOGAI - SUMMARY OF SANITATION PROPOSAL User interface Collection Conveyance Treatment Reuse/disposal Access to toilets and Waste Water Proposal Individual toilets on Pilot basis in Dhobighat & Dhorpura / Gowripura slum Rehabilitation and Closing of drains in zone 2 (if settled sewer in full city) (Rs crore) Phytorid treatment in zone 2 (Rs. 7.4 crore) Reuse for Agriculture and Irrigation Purposes Conventional sewer: 75.2 crores Settled sewer: 47.5 crores OR Refurbishment of all CTs in Slum and non-slum areas (Rs crore) Initiating citywide Settled Sewer Network OR Initiating city wide UGD network (Rs crore/Rs crore) Provision of Individual toilets in Slum areas (Rs crore) Pilot DEWATS at Jogaiwadi Lake (zone 4) (Rs crore) Refurbishment of Existing PTs (Rs crore) Refurbishment of Public Urinals (Rs crore) Pilot DEWATs at Borda lake (zone 2) (Rs crore) Interceptor Sewer along the river (if settled sewer in full city) Pilot for Outsourcing O &M of CT to Private/ CBO in Sadar bazaar Dukan Kendra Suitable DEWATs for zone 1 and 3 Prabhag 4 - Initiate pilot for UGD (if UGD in full city) Initiating outsourcing of O&M practices private operator of CTs Channelisation of river and 3 nallas (Rs crore) AIWSP in zone 2 (long-term) (Rs crore) IEC campaigns Solid Waste Management Increasing Door – Door collection of Waste (Rs crore) Upgrade existing treatment mechanisms for bio-degradable and recyclable wastes (Rs crore) Developing landfill site and vermi-composting plant with improved efficiency (Rs crore) Rs crores Augmentation of Vehicles (Rs crore) Initiate pilot project for segregation of waste in newly developed area (Prabhag 4) (Rs crore) Involve rag pickers for waste collection and segregation through Pilot in Sadar Bazaar
47
POST IMPLICATIONS OF CITY SANITATION PLAN
PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED
48
POST - CSP SCENARIO PROJECTS INITIATED
Access to sanitation facility – Household, Community and public level Sanitation Augmentation of infrastructure in community blocks Outsourcing of the community blocks for O&M New models for public toilet blocks will be initiated soon Wastewater Management DPR Prepared for wastewater conveyance system Pilot projects for DEWATS will be initiated in next year Periodic cleaning of Jaywanti River and natural drains Solid Waste Management Coverage of Door to Door collection system is augmented Existing sanitary landfill site will be developed PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED
49
POST - CSP SCENARIO PROJECTS INITIATED – WASTEWATER MANAGEMENT
DPR for underground sewerage network for zone 2 is at sanction stage Zone 1, 3 and 4 are not included in DPR. Also, new addition from extended boundary is not included in DPR Requirement from ANP Suggestion through CSP ZONE 3 ZONE 1 ZONE 2 ZONE 4 Zone 4 and surrounding extended residential area (from D. P. Ambajogai) is included in a pilot for DEWATS Zone 1 is institutional and agricultural area; while zone 3 is agricultural area from D. P. Ambajogai, generating minimal sewage Extended area on northern side (adjacent to zone 2 & 3) is proposed residential area covered under pilot for DEWATS PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED
50
MUNICIPAL FINANCE ANALYSIS
SECTION III: MUNICIPAL FINANCE ANALYSIS MUNICIPAL FINANCE AND FINANCING PLAN PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED
51
SUMMARY OF FINANCES AFTER RECASTING
AMBAJOGAI: SUMMARY OF BUDGETS SUMMARY OF FINANCES AFTER RECASTING Rs. in crore 2006 2007 2008 2009 2010 2011 Items Actual RE Opening Balance 2.31 3.37 4.68 3.63 4.56 4.06 Revenue Account Revenue Receipts 5.52 6.68 6.91 6.95 840 10.41 Revenue Expenditure 4.21 5.13 5.15 5.54 6.74 11.17 Operating ratio 0.76 0.77 0.75 0.80 1.07 Capital Account Capital Receipts 5.44 5.01 3.80 3.03 6.43 15.07 Capital Expenditure 5.66 5.22 6.37 3.57 9.52 14.88 Capital Utilisation 104% 168% 118% 148% 99% Extra-ordinary Account Extraordinary Receipts 0.24 0.54 0.29 0.46 1.56 0.63 Extraordinary Expenditure 0.26 0.57 0.51 0.40 0.62 0.95 Summary Total Receipts 11.20 12.22 10.99 10.43 16.39 26.11 Total Expenditure 10.14 10.92 12.04 9.51 16.88 27.00 The municipal expenses have increased from Rs crore in to Rs crore in at a CAGR of 14% Similarly, municipal receipts have increased from Rs. 9.3 crore to Rs crore at a CAGR of 10%
52
Almost all the capital works are carried out from grants
AMBAJOGAI: O&M EXPENSES Property and water taxes are the major sources of own taxes. Property tax contributes 13% to all municipal revenue A/C receipts NP assistance grants, entertainment tax grants, Mudrank Shulka grants are the major grants received by ANP Octroi compensation and 12th Finance Commission (FC) grants were among major grants before they were discontinued The non-tax items include rents from properties, development charges, service charges, various fees etc. Almost all the capital works are carried out from grants 62% of revenue expenses are towards WSS 43% expenses towards permanent establishments
53
AMBAJOGAI: WATER SUPPLY AND SANITATION (WSS) FINANCES
WSS contributes only 32% towards overall revenue receipts but accounts for 62% of the revenue expenses Water tax (Rs. 1,500 per connection per annum) and 12th FC solid waste management (SWM) grants are major revenue streams but 12th FC grants have ceased The high contribution towards overall municipal receipts is due to high collection efficiency of water tax (88%) Around 43% expenses in WSS are towards establishments 47% of expenses in water supply are towards electricity and bulk water purchase Per capita spending on WSS (Rs. 619) is 67% of by High Powered Expert Committee (HPEC), 2011 norm of Rs. 926
54
Revenue expenses will grow at a CAGR of 9.3%
I) MUNICIPAL FINANCE FORECASTS Revenue expenses will grow at a CAGR of 9.3% While the revenue receipts at 8.2% The budget size will grow to more than Rs. 31 crore by 2022 registering a CAGR of 5% from the last actual figure The revenue receipts will grow to around Rs crore against expenses of Rs crore in 2022 The revenue surplus is projected to be around Rs. 2 core after covering WSS deficit of more than Rs. 6 crore Past trends Future projections ‘Business as Usual’ scenario ‘Full CSP Comparison of wastewater systems– a) Underground sewerage system (USS) b) Settled sewer system (SSS) c) On-site sanitation system (OSS) Financing Plan for Ambajogai CSP is prepared for three scenarios
55
Water supply Wastewater Solid waste
II) FULL CSP (INCLUDING TOILETS, WASTEWATER, SOLID WASTE MANAGEMENT, WATER SUPPLY) - 1 Water supply Regularise illegal connections Convert public stand posts to group connections Collection efficiency of taxes Wastewater Community and public toilets Individual toilet provision Sewerage network Wastewater treatment facility Storm water drains De-silting and channelisation of drains IEC campaign Solid waste Segregation of waste Private contract for D2D solid waste collection New vehicles for solid waste transportation Repair solid waste processing plant New sanitary landfill site
56
Revenue Income and Expenditure
II) FULL CSP (INCLUDING TOILETS, WASTEWATER, SOLID WASTE MANAGEMENT, WATER SUPPLY) - 2 Revenue Income and Expenditure Surplus/(Deficit) of Revenue Account With implementation of CSP proposals, revenue account shows high deficit
57
WSS Operating Plan WSS Capital Plan
II) FULL CSP (INCLUDING TOILETS, WASTEWATER, SOLID WASTE MANAGEMENT, WATER SUPPLY) - 3 WSS Operating Plan Increment in tariff required to sustain operating costs Property tax, water supply tax, wastewater tax and solid waste charges WSS Capital Plan Grants of around Rs. 85 crore is required to implement all the proposals of CSP
58
COMPARISON OF OPERATING COSTS FOR WASTEWATER TECHNOLOGIES
III) COMPARING WASTEWATER (WITH TOILETS) PROPOSALS - 1 COMPARISON OF OPERATING COSTS FOR WASTEWATER TECHNOLOGIES Status of Revenue Account a) Underground Sewerage System b) Settled sewer system c) On-site Sanitation System
59
III) COMPARING WASTEWATER (WITH TOILETS) PROPOSALS - 2
COMPARISON OF OPERATING PLANS a) Underground Sewerage System ~ Rs. 3.9 crore/annum operating expenditure b) Settled sewer system ~ Rs. 1.3 crore/annum operating expenditure c) On-site sanitation system ~ Rs. 0.2 crore/annum operating expenditure
60
III) COMPARING WASTEWATER (WITH TOILETS) PROPOSALS - 2
COMPARISON OF CAPITAL PLANS a) Underground Sewerage System Rs. 92 crore Capital expenditure requirement b) Settled sewer system Rs. 46 crore Capital expenditure requirement c) On-site sanitation system Rs. 10 crore Capital expenditure requirement
61
SUMMARY AND FINANCING ALTERNATIVES
SECTION IV: SUMMARY AND FINANCING ALTERNATIVES PERFORMANCE ASSESSMENT SYSTEM (PAS) PROJECT MICRO CLOUD COMPUTING PRIVATE (INDIA) LIMITED
62
Tariff increase required
SUMMARY OF FINANCING PLAN CSP options Capital Finances Operating Finances Tariff increase required Base tariff = Rs. 4,070/HH/ annum Sources of funds (Rs. in crore) Average per annum Grants ULB funds Private (HHs, PPP, micro-credit) Total Capex Additional Opex Additional Revenue Internal funds Debt I) Business As Usual (BAU) scenario - Rs. 7,002 (72%) II) Full CSP Proposal with water supply actions 84.5 7 20.8 1.4 114 4.7 1.3 Rs. 9,222 (127%) III) Proposal with only Wastewater Technology Options A. Citywide sewerage network 78.8 8.7 4.2 91.7 3.9 Rs. 7,316 (80%) B. Citywide settled sewer 37.4 6.1 0.8 1.6 45.9 3 Rs. 5,460 (34%) C. On-site sanitation system 5.6 9.5 0.2 Rs. 5,632 (38%)
63
Capital cost assumption Operating cost assumption
ASSUMPTIONS FOR CSP ACTIONS CSP Actions - AMBEJOGAI Capital cost assumption Operating cost assumption Funding source (All costs in Rs. in crore) Unit costs Capex Unit cost O&M Grants ULB Private Committed projects Construction of 947 individual toilets in SC/ST HHs under MSNA 1.3 90.00% 10.00% Ongoing water supply scheme under MSNA including water audit, energy audit, hydraulic modeling, computerised water billing and collection system Details are not available Water supply actions Regularising illegal connections (4.5% illegal connection) Rs. 500/ connection is the penalty charges Increasing number of connections using existing distribution network (1,000 connection ) Convert stand posts/ public taps into group connections Improvement in collection efficiency of water supply charges and taxes Sanitation Actions Construct new soak pits (14,007) Rs. 3,000/ soak pit 4.2 - 50% Provision of safe sanitation disposal system in existing unsanitary toilets (50% septic tanks of individual toilets – 3,852+ Upgrade pits to septic tank-1,960 + upgradation of septic tanks in 38 CT and 2 PT) Rs. 5,000/ septic tank Rs. 15,000/CT-PT septic tank 3.3 100% Improve condition of existing community and public toilets (38 blocks of CT + 2 blocks of PT) Rs. 1.5 lakhs/CT block Rs. 3.5 lakhs PT block 63.0 Rs. 5,000/block/ month (for all CT and PT) Construction of community and public toilets (addition of urinals in existing PT) Rs. 1.5 lakhs/PT block 0.03 Rs. 5,000/block/ month Construction of additional individual toilets in non-sewered areas (Total 2,181 HHs ) Rs. 14,000/Seat 3.1
64
Capital cost assumption Operating cost assumption
ASSUMPTIONS FOR CSP ACTIONS CSP Actions - AMBEJOGAI Capital cost assumption Operating cost assumption Funding source (All costs in Rs. Cr) Unit costs Capex Unit cost O&M Grants ULB Private Wastewater actions Expanding or laying of new sewerage network (280 km) (15,000 new connection) Rs lakhs/km 53.20 5% of capex/annum 90% 10% Connecting households to sewerage network (15,000 HH to be connected) 3.00 Information, education and communication (IEC) campaigns for open defecation (OD) free cities 0.40 100% Upgradation of open drains to closed drains ( Km length rehabilitation of drains in Zone 2) Rs. 6.5 lakhs/km 9.30 Procurement of suction emptier trucks (5 trucks, 75 trips/month) 10 lakhs/truck 0.50 10% of capex/ annum Construction/augmentation of sludge treatment facility (160 cu. m) Rs lakhs/cu. m 0.01 5% of capex/ Construction/augmentation of primary treatment facility for waste transmitted through surface drains (construction of DEWATS and Phytorid System, MLD of water to be treated) Rs. 73 lakhs/MLD 16.20 7% of capex/ annum Construction/augmentation of wastewater treatment plant (construction of Advanced Integrated Wastewater Pond Systems technology and treatment facility, 4.20 MLD) Rs lakhs/MLD 3.30 Intercepting sewer along river (18.96 km) 5.8 lakhs/km 1.10 5% of capex/ annum Citywide settled sewer ( km) 8.21 lakhs/km 14.1 2% of capex/ annum Wastewater -Channelisation of rivers and nallas 1.06
65
Capital cost assumption Operating cost assumption
ASSUMPTIONS FOR CSP ACTIONS CSP Actions - AMBEJOGAI Capital cost assumption Operating cost assumption Funding source (All costs in Rs. Cr) Unit costs Capex Unit cost O&M Grants ULB Private Solid waste actions Segregation of waste collection and transportation (2,493 HHs ) 0.61 100% Engage with private service providers [resident welfare associations (RWAs)/non-governmental organisations (NGOs)/ establishments] for providing sanitation services (3,744 HH to be served) Rs lakhs/ month 0.00 654.10 Information, education and communication (IEC) campaign for compliance and segregation 0.18 Procurement of new vehicles for collection and transportation (6 two wheeler auto tripper, 2 trips per day) Rs lakhs/auto tripper 0.24 10% of capex/annum Repairing of existing processing plant (upgrading existing treatment to bio-degradable and recyclable wastes) 7% of capex/annum Construction of sanitary landfill facility (develop existing landfill site + vermi-composting) (1 MT) 3.32 5% of capex/annum 90% 10%
66
Thank you!! CITY SANITATION PLAN, AMBAJOGAI