The Next Generation of a Gamma Irradiation Facility GIF++
presented to SBA
2
Contents Users’ requirements Layout
Adaptation to minimize impact on H2 (extension) Wall and roof shielding, raised floor Dennis Irradiator: filter system Dennis Radiation field Dorothea Users’ installation of permanent trackers Dorothea Technical infrastructure Schedule, budget 14/03/2013 A. Fabich
3
Users’ requirements Document “Users’ requirements” under approval
Re-establish former GIF functionality Secondary muon beam intercepting a photon field Space for installing detectors to be tested max. MDT (few meter) and calorimeters(few tons) Common infrastructure and several gases 14/03/2013 A. Fabich
4
Temperature/humidity
Users’ requirements: °C, humidity 30-50%. Optional: small ventilation unit (if really required) Not required for safety aspects Measurements: autumn 2012 – spring 2013 (courtesy: R. Guida) 14/03/2013 A. Fabich
5
Irradiator Photons 662 keV (Cs-137 source, 16 TBq)
Prompt radiation only, no activation Tender completed, order placed these days Irradiator direct photon fields 9 m 4.80m 6 m 14/03/2013 A. Fabich
6
H4 – PPE 154 Maintain possibility for H2 extension
Maintain minimum 2m wide corridor (central) 14/03/2013 A. Fabich
7
GIF++ implementation Bunker Gas zone Counting rooms Preparation zone
Central corridor 14/03/2013 A. Fabich
8
Technical systems Electricity, light (+emergency), Ethernet, cabling, cable trays, demineralised water, NO cryogenics Beam equipment Gases Neutral and mixtures (containing flammable gases) 15 gas supplies from the gas hut (build. 909) 10 patch panels in bunker/preparation zone Each for 4 neutral and 4 hazardous gases Supply lines should mainly be installed in raised floor 14/03/2013 A. Fabich
9
Safety responsibility
with SBA (together with CERN expert groups) Radiation shielding Flammable gas detection and ODH (in bunker) Fire detection Access system/personnel protection Interlock(s), also with irradiator Gas zone: ATEX conform (PH) 14/03/2013 A. Fabich
10
Access: PPE, PPG, PPX and MAD
Roof access for large equipment (using the bridge crane) PPX PPX/PPE: standard PPG: concrete, motorized MAD Material access device for small equipment of computer size PPG MAD PPE PPE+turnstile single person entrance at a time without need for patrol 14/03/2013 A. Fabich
11
PH responsibilities Defining users’ requirements
Irradiator procurement Equipment in the gas (mixing) zone analysers, mixers … + ATEX conformity Construction of permanent m-detectors Slow control of irradiator, gas equipment, logging DAQ system 14/03/2013 A. Fabich
12
Cost estimate Material+FSU Excluding PH contributions
To be reviewed within functional design Excluding PH contributions 14/03/2013 A. Fabich
13
D. Pfeiffer (EN-MEF-LE) – 17/10/2012
Schedule FINISHED: Tender documents ready ONGOING: Bunker design (false floor, roof, cable trays) about to be finished ONGOING: First draft ready to be circulated STARTED: Discussions with users about DAQ 13/02/2013 D. Pfeiffer (EN-MEF-LE) – 17/10/2012 14/03/2013 A. Fabich
14
Outlook Until summer 2013 From summer 2013 Completed by summer 2014
Functional design to be completed Operation scheme(s) (beam, irradiator access) From summer 2013 Area cleaning Installation Completed by summer 2014 14/03/2013 A. Fabich