1 Sewerage & Water Board of New Orleans
ACEC Luncheon May 12, 2016

2 Power resiliency efforts Design projects Construction projects
Automatic Meter Reading Water/Streets replacement Drainage funds Green infrastructure Sewerage & Water Board of New Orleans

3 Power Resiliency Power fluctuations
Evaluating power supply alternatives 60 cycle alternatives Michoud tower repairs Water plant towers DR-UPS Sewerage & Water Board of New Orleans

4 $150 Million Power Plant HMGP
In construction Turbine 4 Generator $7.9 million 60hz Feeders $3.4 Generator testing load bank $5.5 Replacement of critical feeders $28.0 Emergency fuel storage $6.4 Structural refurbishment $3.8 In design Oak street intake $16.7 Refurbish boiler room $44.7 Turbine 5 refurbishment $17.3 Turbine 3 refurbishment $16.9 Sewerage & Water Board of New Orleans

5 Projects in Design 33 different prime consultants active
$1.4 billion in estimated construction Katrina PA Water, Sewer Power plant HMGP SELA SSERP Replacement Program Sewerage & Water Board of New Orleans

6 Projects in Construction
Over $200 million Sewerage & Water Board of New Orleans

7 Automatic Meter Reading
Installing new software-on line this year! Selected and installing new meters Will be selecting AMR equipment On line by 2018? Sewerage & Water Board of New Orleans

8 FEMA Funded Replacement
$2.2 billion settlement announced in December 80% for street and drainage and 20% water mains FEMA proposal review due in June Sewerage & Water Board of New Orleans

9 Drainage Funded by 3 separate millages generating $40 million
Over $40 million in capital maintenance currently unfunded 1 millage expires at the end of 2016, reducing drainage funds by 20%. Lakefront stations come online in 2017, increasing drainage costs Sewerage & Water Board of New Orleans

10 Green Infrastructure SELA expansion success federally funded
Drainage expansion is expensive $1.5 m in SWB funds committed to date on 25 different projects over the last 3 years Sewerage & Water Board of New Orleans

11 Sewerage & Water Board of New Orleans
Re-Building the City’s Water Systems for the 21st Century