Presentation is loading. Please wait.

Presentation is loading. Please wait.

Status of the ALIBAVA system and the Telescope

Similar presentations


Presentation on theme: "Status of the ALIBAVA system and the Telescope"— Presentation transcript:

1 Status of the ALIBAVA system and the Telescope
ALIBAVA Report, 11 December 2009, Valencia, Spain Status of the ALIBAVA system and the Telescope Marco-Hernández, R.a a Instituto de Física Corpuscular (IFIC), Universidad de Valencia-CSIC,Valencia, Spain. Ricardo Marco-Hernández IFIC(CSIC-Universidad de Valencia)

2 ALIBAVA In the last episode... ALIBAVA current status.
Status of the ALIBAVA system and the Telescope ALIBAVA Report, 11 December 2009, Valencia, Spain Outline In the last episode... ALIBAVA current status. ALIBAVA future plans. Telescope concept. Telescope status. Telescope future plans. ALIBAVA Ricardo Marco-Hernández IFIC(CSIC-Universidad de Valencia)

3 27 MBs produced, tested and assembled.
Status of the ALIBAVA system and the Telescope ALIBAVA Report, 11 December 2009, Valencia, Spain In the last episode… 27 MBs produced, tested and assembled. Two of them (MB4 and MB5) failed after working correctly: both MBs repaired. Other two (11/ and 11/ ) with problems after assembly: one fully repaired. 26 DBs tested. 19 full systems tested . 20 boxes for the MB machined. 20 flat cables assembled. Other components of the system collected or (AC/DC, USB cable, HV connectors, fanins, etc). We have developed and maintained the software and ROOT macros. We have provided technical support and documentation (twiki page, list, software and hardware documentation, etc). We have shipped 19 full systems (packaging and tracking). Ricardo Marco-Hernández IFIC(CSIC-Universidad de Valencia)

4 Already distributed (19 full systems and 7 extra DBs).
Status of the ALIBAVA system and the Telescope ALIBAVA Report, 11 December 2009, Valencia, Spain In the last episode… Already distributed (19 full systems and 7 extra DBs). CERN (Michael Moll): 1 full system. Freiburg (Ulrich Parzefall): 3 full systems. Florence (Mara Bruzzi): 1 full system. Glasgow (Richard Bates): 1 full system and 1 DB extra (free). Prague (Peter Kodys): 1 full system. Ljubjana (Andrej Gorisek): 1 full system and 3 DBs extra Rochester (Sergey Korj): 1 full system. Lancaster (Alex Chilingarov): 1 full system. Munich (Richard Nisius): 1 full system and 1 DB extra. IFCA (Iván Vila): 1 full system and 1 DB extra. Karlsruhe (Alexander Dierlamm): 1 full system and 1 DB extra (free) . Sheffield (Richard French): 1 full system. Louvain (Eduardo Cortina): 1 full system. Santiago de Compostela (Eliseo Perez): 1 full system. Cambridge (Dave Robinson): 1 full system. Heidelberg (Michael Schmeling): 1 full system (free). BNL (Zheng Li): 1 full system. An ALIBAVA session in 15th RD50 workshop: Feedback from users. Users are happy with the system: some minor problems. CERN, Freiburg (Louvain) and Liverpool have developed their own mechanical setups for the ALIBAVA system. Henry Brown from Liverpool has customized the ROOT macros. Ricardo Marco-Hernández IFIC(CSIC-Universidad de Valencia)

5 ALIBAVA current status
Status of the ALIBAVA system and the Telescope ALIBAVA Report, 11 December 2009, Valencia, Spain ALIBAVA current status We have new orders for the system: Lausanne (Silvia Anserment): 1 full system. Hamburg (Robert Klanner): 2 full systems. Wien (Thomas Bergauer): 1 full system. CERN (Michael Moll): 1 full system and 2 extra DBs. Freiburg (Ulrich Parzefall): 2 extra DBs. Karlsruhe (Alexander Dierlamm): fanins. CNM will be in charge of the distribution in the future (Joaquin Rodriguez). We have produced and assembled 20 MBs. 10 MBs for ALIBAVA. 10 MBs for the Telescopes. We have repaired 3 MBs (MB4, MB5 and 11/ ). We are working in a new MB box: more aesthetic. We have designed and produced new detector boards. A new version of the software has been released. Ricardo Marco-Hernández IFIC(CSIC-Universidad de Valencia)

6 An upgrade of the FPGA firmware incorporating new features.
Status of the ALIBAVA system and the Telescope ALIBAVA Report, 11 December 2009, Valencia, Spain ALIBAVA future plans An upgrade of the FPGA firmware incorporating new features. Beetle chip masking for single chip operation. Digitalization of the Beetle readout data header. Programmable delay scan (1 ns resolution-255 ns range) for the calibration: pulse reconstruction from calibration data. Test of the new MBs. Production of the new MB boxes. Shipment of MBs (with corresponding box) as required by CNM. Ricardo Marco-Hernández IFIC(CSIC-Universidad de Valencia)

7 System based on the ALIBAVA system.
Status of the ALIBAVA system and the Telescope ALIBAVA Report, 11 December 2009, Valencia, Spain Telescope concept System based on the ALIBAVA system. Crate for MBs with PS DUT XYT Master card Rotary stage Ricardo Marco-Hernández IFIC(CSIC-Universidad de Valencia)

8 DUT card: card based on the DB.
Status of the ALIBAVA system and the Telescope ALIBAVA Report, 11 December 2009, Valencia, Spain Telescope concept DUT card: card based on the DB. Readout of chilled DUT (strip or fanout pixel silicon detectors) using one or two Beetle chips. The board features a temperature sensor attached to the DUT backplane via the copper chuck. The board could operate in a self-triggering mode providing analogue and digital pulses for the readout system. A cooling system based on a Peltier element has been developed (also for the ALIBAVA). 4 XYT cards: card based on the DB. For triggering on the particle tracks in the beam test and measuring of the track space points using 2 silicon strip detectors mounted back-to-back at 90 deg. The coordinate measurements are performed with two Beetle chips. The card produces the analogue and digital trigger pulses. Its local intelligence (CPLD) allows for their conditioning: synchronizing to a common clock frequency, delaying and implementing coincidence with other XYT stations. ALIBAVA MB (one for each DUT and XYT). USB controller changed by a connector for digital parallel communication with the master card. Three dedicated inputs for external CLK, RESET and TRIGGER signals. Last upgrade of the ALIBAVA MB firmware incorporated. Ricardo Marco-Hernández IFIC(CSIC-Universidad de Valencia)

9 Master patch card: connected to the master card.
Status of the ALIBAVA system and the Telescope ALIBAVA Report, 11 December 2009, Valencia, Spain Telescope concept Master patch card: connected to the master card. Generating and distributing the common clock frequency for the DUT and XYT readout systems. Conditioning and distributing the common trigger and reset pulses for them. Data readout bus arbitration (ALIBAVA MBs). Test channel '0' or '1' of one standalone DUT or XYT card. Readout bus terminator. Replace the USB chip on each ALIBAVA MB and link all readout systems to the control and readout data bus keeping the USB controller protocol. Master card. Xilinx Spartan 3E development board. Bridge for communication between software and ALIBAVA MBs by raw ethernet. More features in the future if required. Power distribution board. Fanout +5V and +12V DC from the standard PC power supply to all ALIBAVA MBs and to the master card, scintillation trigger, DUT rotation stage and air coolers for the Peltier element of the DUT. Ricardo Marco-Hernández IFIC(CSIC-Universidad de Valencia)

10 Boards already designed. Boards also already produced.
Status of the ALIBAVA system and the Telescope ALIBAVA Report, 11 December 2009, Valencia, Spain Telescope status DUT, XYTs, master patch card, readout bus terminator and power distribution board: Boards already designed. Boards also already produced. Components specified. CNM is in charge of the production and assembly (probably in UVAX). Master card. One already purchased for Liverpool. Another two will be purchased (Valencia and Barcelona). ALIBAVA MB modifications. Already specified and conceptually designed. 10 MBs already produced and assembled for the telescopes (one at Liverpool and another one at Valencia). Ethernet comunication and control software. Already specified. Based on the ALIBAVA software. ‘Alignment’ software. Ricardo Marco-Hernández IFIC(CSIC-Universidad de Valencia)

11 Telescope future plans
Status of the ALIBAVA system and the Telescope ALIBAVA Report, 11 December 2009, Valencia, Spain Telescope future plans Ilya Tsurin (Liverpool). Boards design. Master card FPGA design. Cooling system (Peltier element) controlled by USB. Hardware-software commissioning. Joaquin Rodriguez (CNM). Control software development. Production, assembly and purchasing. Ricardo Marco (IFIC). ALIBAVA MB FPGA design. Control software specification. Help to Joaquin if possible. Sergey Burdin (Liverpool). Alignment software. Hardware almost finished. Now working in parallel (Master card FPGA, ALIBAVA MB FPGA, Control software and Alignment software). The main deadline is test beam for summer 2010. Ricardo Marco-Hernández IFIC(CSIC-Universidad de Valencia)

12 Status of the ALIBAVA system and the Telescope
ALIBAVA Report, 11 December 2009, Valencia, Spain Status of the ALIBAVA system and the Telescope Marco-Hernández, R.a a Instituto de Física Corpuscular (IFIC), Universidad de Valencia-CSIC,Valencia, Spain. Ricardo Marco-Hernández IFIC(CSIC-Universidad de Valencia)


Download ppt "Status of the ALIBAVA system and the Telescope"

Similar presentations


Ads by Google