About Calpine Founded in 1984 Headquartered in San Jose, Calif.

Similar presentations


Presentation on theme: "About Calpine Founded in 1984 Headquartered in San Jose, Calif."— Presentation transcript:

0 PI-BASED PERFORMANCE MONITORING SYSTEM FOR COMBINED CYCLE POWER GENERATION TECHNOLGY
4/21/2004

1 About Calpine Founded in 1984 Headquartered in San Jose, Calif.
Calpine has 87 energy centers in 21 states in the U.S., as well as in Canada and the United Kingdom with a total capacity of about 22,000 megawatts Uses clean, proven technologies: natural gas combined-cycle and geothermal energy

2 A Large Portfolio Calpine offices Corporate headquarters Boston, MA
Calgary, Canada Dublin, CA Ft. Collins, CO Houston, TX Jupiter, FL Northbrook, IL Portland, OR Tampa, FL Folsom, CA Corporate headquarters San Jose, CA As of 4/21/2003

3 Growth History Other for Calpine includes only geothermal and TL simple cycle.

4 Performance Monitoring Necessity
Large, regionally diverse fleet requires central performance monitoring to provide the following; Standard fleet reporting/comparison Operational benchmarking Asset improvement and degradation quantification Value Economic decisions based on operating performance data Internal knowledge and understanding of equipment Efficient and reliable operation Other for Calpine includes only geothermal and TL simple cycle.

5 Why Use PI? Calpine chose to use OSI-PI as the foundation for our Performance Monitoring System Existing PI infrastructure eliminated additional capital expense Internal reliance and control PI provides all the required functional components of 3rd party systems Development team and end-users already familiar with PI tools/systems Value Zero additional capital cost associated with PI Zero new training Zero external reliance Zero risk Other for Calpine includes only geothermal and TL simple cycle.

6 PERFORMANCE MONITORING SYSTEM ARCHITECTURE
Consumable Products Wholesale Energy Products Retail Power Renewable Energy Overview of Calpine PI network PI Performance Equations PI Process Book as GUI PI Datalink and Excel employed as on-line QC

7 Calpine PI Infrastructure
PI at Calpine Calpine standardized on PI as their operations historian in early 2001 PI is installed at 86 of Calpine’s 89 generating facilities The fleet PI infrastructure consists of 62 production PI servers and 24 PI API nodes Calpine PI data for every site is available remotely to every Calpine employee, from plant personnel to executive management, because all Calpine PI systems are connected to the Calpine WAN Other for Calpine includes only geothermal and TL simple cycle.

8

9 PI Performance Equations
PI Performance Equation Subsystem used as backbone to calculate performance data Average of 350 Performance Equations per site constructed by Calpine Performance Engineers Calculations based on standard calculations as well as plant specific calculations Daily averaging functions used to easier identify performance trends and create summary reporting Other for Calpine includes only geothermal and TL simple cycle.

10 PI Process Book as GUI PI Process Book used to view raw and calculated performance data 13 Monitoring Displays and 14 Trend Displays Multiple individual PDI files used as opposed to a single PIW file Navigation created using VB Code Other for Calpine includes only geothermal and TL simple cycle.

11 Specific values: Net MW 12/31/1997 = 1268 12/31/2002 = 20,000
C O M P OU N D A N N U A L G R O W T H R A T E T O Specific values: Net MW 12/31/1997 = 1268 12/31/2002 = 20,000 CPN Stock 12/31/1997 = $1.86 12/12/2002 = $3.47

12

13 PI Datalink as On-Line Quality Control
Data Quality Critical PI Datalink used to ensure data integrity Standard statistical evaluation of data used to evaluate data integrity PI Datalink used to summarize data and draw conclusions Other for Calpine includes only geothermal and TL simple cycle.

14 TECHNICAL CHALLENGES Text Based Filtering in Performance Equations
TECHNICAL CHALLENGES Text Based Filtering in Performance Equations Getting the Most out of the Performance Equation Subsystem Correction Calculation Challenges

15 Text Based Filtering Identified a need to display why corrections were not being applied Solution must not affect summary data Early solution was to display “-1” when corrections not applied Other for Calpine includes only geothermal and TL simple cycle.

16 Other for Calpine includes only geothermal and TL simple cycle.

17 Text Based Filtering Solution
Final solution was to display text when corrections not applied Text to be used in the tags must be present in the “System” Digital Set within the PI System Text is not taken into account when summary equations are applied Other for Calpine includes only geothermal and TL simple cycle.

18 Other for Calpine includes only geothermal and TL simple cycle.

19 Maintaining the PI-PE Subsystem
Found that 200 calculations is the approximate limit for a Performance Equation Scheduler Set up multiple schedulers to spread the load With the number of equations, and the complexity of the equations, Performance Equation Schedulers would fail from time to time Set up Performance Equation Schedulers to be restarted regularly to minimize impact. Used 3rd Party Software to notify when calculations are experiencing issues Other for Calpine includes only geothermal and TL simple cycle.

20 Technical Challenges The Challenges The Solutions
Site instrumentation errors / lack of site instrumentation Each plant uses different tag naming conventions PI was originally configured primarily as a Data Historian – PI tags typically have various levels of compression and exception enabled Gas Turbine based performance indicators vary drastically with load and ambient conditions The Solutions Correction, re-calibration, procurement of critical site instrumentation Standard PI tag naming convention applied to primary site tags (fuel, power, ambient conditions) PI compression and exception removed on critical performance tags – filtering applied where required Load Normalization Apply OEM ambient corrections at normalized (base) load Use PI-based text substitution to allow functional averaging and Process Book trending Specific values: Net MW 12/31/1997 = 1268 12/31/2002 = 20,000 CPN Stock 12/31/1997 = $1.86 12/12/2002 = $3.47

21 Performance Trend of CTG Corrected MW

22 Value Realization Examples Value
Use PI based Performance Monitoring to conduct DWR contractual annual capacity tests on (15) simple cycle peakers in CA Quantify recoverable CTG degradation by analyzing pre and post offline water wash performance Remote monitoring identifies operational procedure mispractice and optimizes plant performance Value Eliminate dedicated on-site test personnel and temporary test instrumentation – Estimated savings of $200K annually Accurate recoverable degradation data allows the sites to optimize CTG water washing based on market conditions In a low spark spread market, every optimization opportunity can significantly contribute to Calpine’s profitability

23 Performance Monitoring System vs. Performance Test
Calpine Simple Cycle Peaker Plant Performance Test Results Comparison Calpine 3 x 1 Combined Cycle Plant Performance Test Results Comparison Other for Calpine includes only geothermal and TL simple cycle. The Performance Monitor calculations fall within the 1% uncertainty band for power and slightly outside the 1.5% uncertainty band for heat rate. This is very good considering that the tests use different instrumentation and the acceptance test uses more measurements and more corrections in their calculations.

24 Performance Quantification
Specific values: Net MW 12/31/1997 = 1268 12/31/2002 = 20,000 CPN Stock 12/31/1997 = $1.86 12/12/2002 = $3.47

25 Performance Quantification

26 Performance Quantification
CTG 2 Water Wash CTG 1 Water Wash CTG 2 Water Wash CTG 1 Water Wash

27 Performance Reporting
Specific values: Net MW 12/31/1997 = 1268 12/31/2002 = 20,000 CPN Stock 12/31/1997 = $1.86 12/12/2002 = $3.47

28 Performance Reporting
Specific values: Net MW 12/31/1997 = 1268 12/31/2002 = 20,000 CPN Stock 12/31/1997 = $1.86 12/12/2002 = $3.47

29 Summary Calpine is successfully leveraging OSI-PI technology in a Performance Monitoring environment directly resulting in; Increased plant availability and reliability Predictive maintenance scheduling A historical plant performance database that can be used to effectively optimize plant and fleet performance Better decision support data available to dispatch and trading INCREASED CALPINE PROFITABILITY ! Specific values: Net MW 12/31/1997 = 1268 12/31/2002 = 20,000 CPN Stock 12/31/1997 = $1.86 12/12/2002 = $3.47


Download ppt "About Calpine Founded in 1984 Headquartered in San Jose, Calif."