E-CORD Bill of Materials

Similar presentations


Presentation on theme: "E-CORD Bill of Materials"— Presentation transcript:

1 E-CORD Bill of Materials

2 Per-Site LxVPN configuration Per-Site LxVPN configuration
High-Level Overview Metro Orchestration: Identifies transport path(s) and End-to-End resource constraints given services and virtual network type Conveys constraints and service requirements to each CORD site(s) CORD sites configure fabric and service(s) for LxVPN LxVPN service request Service Portals Service/Network provisioning application(s) Metro Orchestration Per-Site LxVPN configuration XOS ONOS Per-Site LxVPN configuration Connectivity policy CORD CORD Transport Network (SDN or existing) Controller Central Office (CORD site) CORD HQ Branch Stepping back, what’s unique about E-CORD is that it will need to coordinate multiple CORD sites together to provide end-to-end services to enterprise locations. So we chose to take a hierarchical approach where there is a metro orchestration layer, which manages multiple CORD sites and the transport network in between them. Now let’s look at how we will provision an end-to-end service. 1) First, users will request for a service through their service portal running on the metro orchestrator, for example user can request something like 'give me a L2VPN between these two sites’. 2) In response to that request, metro orchestrator will determine - which sites needs to be involved - which path to go through the transport network - what kind of services and policies needs to be applied. (such as bandwidth profiles) High-level description of, what actions each CORD sites and transport network must take will be sent down to each CORD sites. Details of how the requested action is realized will be up to each CORD site to determine. Now let’s look at what will happen on one of CORD site. Regional HQ

3 Single Central Office 4x EdgeCore 6712 (32x 40G QSFP28)
Minimum of 1 per CO (limited leaf/spine fabric), 4 is full leaf/spine 2x Quanta Stratos S210-X12RS-IU 1SRS000059 2x Intel XEON E GHz 2x 32GB DDR3 2x Intel XL170 dual 40GbE QSFP+ 1x Ethernet Edge switch, multiple options Centec V350 EdgeCore AS5912 (Qumran) MicroSemi EA1000 One per enterprise location Minimum one per central office 1x mangement switch E.g., Netgear M4100 Cables to connect leaf/spine fabric and servers: QSFP-40G-03C QSFP+ 40G direct attach passive copper cable, 3m or 5m length Minimum of 8

4 E-CORD Minimum of two Central Offices Global orchestrator
1x Quanta Stratos S210-X12RS-IU 1SRS000059 2x Intel XEON E GHz 2x 32GB DDR3 2x Intel XL170 dual 40GbE QSFP+

5 Transport Network Multiple Options Packet based
Minimum of 1x EdgeCore 6712 (32x 40G QSFP28), or Disaggregated optical network Transponders 2x Lumentum WaveReady 3100 2x Fujitsu T300 2x Ciena Waveserver Backplane 1x Calient S160 1x Polatis 48x48 ports ROADMs 2x Lumentum ROADM Whitebox A 2x Oplink SDN ROADM 2x CoAdna ROADM Optional extras 2x Oplink Optical Protection Switch 1x Oplink EDFA

6 Disaggregated Optical Network


Download ppt "E-CORD Bill of Materials"