Download presentation
Presentation is loading. Please wait.
1
Oracle & HPE 3PAR
2
Legacy Configuration In this example, an Oracle server farm consisting of: 6x servers, each with 1x CPU. Under Oracle licensing rules any machine that is capable of running Oracle must be licensed for Oracle. There are 3 types of redundant configuration: …we deliver bespoke multi vendor IT solutions enabling your organisation to achieve its business and technological objectives. …we provide fast, flexible and resilient IT infrastructure that forms the backbone your organisation. …our comprehensive suite of end-to end IT services ensures complete support to your business and IT infrastructure.
3
Redundant Configuration 1
Active/Active/Passive Oracle recommended configuration Incurs the maximum licensing cost. eg: Server Hardware Cost = £30,000 Oracle Licensing Cost = £90,000 …we deliver bespoke multi vendor IT solutions enabling your organisation to achieve its business and technological objectives. …we provide fast, flexible and resilient IT infrastructure that forms the backbone your organisation. …our comprehensive suite of end-to end IT services ensures complete support to your business and IT infrastructure.
4
Redundant Configuration 2
Active/Active/Active Reduces server hardware costs Still incurs the maximum licensing cost Not truly redundant as all nodes active eg: Server Hardware Cost = £18,000 Oracle Licensing Cost = £90,000 …we deliver bespoke multi vendor IT solutions enabling your organisation to achieve its business and technological objectives. …we provide fast, flexible and resilient IT infrastructure that forms the backbone your organisation. …our comprehensive suite of end-to end IT services ensures complete support to your business and IT infrastructure.
5
Redundant Configuration 3
Active/Active/Cold License reduction Requires MANUAL failover! Time to live minimum of 90 minutes to bring the cold server online then propagate WWN & MAC. eg: Server Hardware Cost = £30,000 Oracle Licensing Cost = £60,000 …we deliver bespoke multi vendor IT solutions enabling your organisation to achieve its business and technological objectives. …we provide fast, flexible and resilient IT infrastructure that forms the backbone your organisation. …our comprehensive suite of end-to end IT services ensures complete support to your business and IT infrastructure.
6
Legacy Configuration Additional costs Top of rack switching
Bottom of rack switching Optical transceivers 10GB Networking Cards Fibre HBA’s Cabling Infrastructure constraints North/South contention with East/West Available power and power connectors Legacy Configuration …we deliver bespoke multi vendor IT solutions enabling your organisation to achieve its business and technological objectives. …we provide fast, flexible and resilient IT infrastructure that forms the backbone your organisation. …our comprehensive suite of end-to end IT services ensures complete support to your business and IT infrastructure.
7
In Summary Under Oracle licensing rules, any machine that is capable of running Oracle must be licensed for Oracle Only Active/Active/Active and Active/Active/Passive methods give adequate continuity with a standard rack server installation Active/Active/Cold is not realistic due to manual failover and time taken to bring the system back online Additional CAPEX Costs, lack of scalability and North/South East/West contention …we deliver bespoke multi vendor IT solutions enabling your organisation to achieve its business and technological objectives. …we provide fast, flexible and resilient IT infrastructure that forms the backbone your organisation. …our comprehensive suite of end-to end IT services ensures complete support to your business and IT infrastructure.
8
What we propose: Aim: Reduce licensing cost inline with Active/Active/Cold but the same reliance of Active/Active/Passive. Our method achieves: A reduction in Oracle licensing costs of 1/3 A large increase in East/West Server to Server bandwidth Removes the requirement for both TOR and BOR Switching Increases Oracle redundancy, resiliency and performance Introduces other workloads to same resilience with service prioritisation An considerable increase in density Reduces power and cooling costs …we deliver bespoke multi vendor IT solutions enabling your organisation to achieve its business and technological objectives. …we provide fast, flexible and resilient IT infrastructure that forms the backbone your organisation. …our comprehensive suite of end-to end IT services ensures complete support to your business and IT infrastructure.
9
How? Server blades are connected via a 7Tb Midplane achieving exceptional East/West bandwidth Density is increased and power and cooling costs reduced due to convergence and control …we deliver bespoke multi vendor IT solutions enabling your organisation to achieve its business and technological objectives. …we provide fast, flexible and resilient IT infrastructure that forms the backbone your organisation. …our comprehensive suite of end-to end IT services ensures complete support to your business and IT infrastructure.
10
How? Redundant Virtual Connect modules de-couple MAC & WWN addresses from the server blades. The service profile stays live and visible to the network, but can be instantly virtually assigned to any one of 16,384 blades in 1024 chassis. Redundant Virtual Connect Modules …we deliver bespoke multi vendor IT solutions enabling your organisation to achieve its business and technological objectives. …we provide fast, flexible and resilient IT infrastructure that forms the backbone your organisation. …our comprehensive suite of end-to end IT services ensures complete support to your business and IT infrastructure.
11
How? Virtual Connect allows Direct FC connection to the system without the need for a licensed switch HPE 3PAR Storage System Server blades boot from SAN automatically orchestrated by Virtual Connect. The end solution is virtualised end-to-end: Compute Interconnects Storage …we deliver bespoke multi vendor IT solutions enabling your organisation to achieve its business and technological objectives. …we provide fast, flexible and resilient IT infrastructure that forms the backbone your organisation. …our comprehensive suite of end-to end IT services ensures complete support to your business and IT infrastructure.
12
Our method In this example an Oracle server farm consists of 6x Blade servers, each with 1x CPU. System configuration: 4x Blade servers are Oracle-Active - Licensed 2x Blade Servers are Reserved, Cold - Unlicensed 10x Blade servers are running other workloads The Virtual Connect presents service profiles to the Network, and dynamically maps these to each blade server. WWN and MAC addresses never change even if the physical servers do. …we deliver bespoke multi vendor IT solutions enabling your organisation to achieve its business and technological objectives. …we provide fast, flexible and resilient IT infrastructure that forms the backbone your organisation. …our comprehensive suite of end-to end IT services ensures complete support to your business and IT infrastructure.
13
Our method In this example an Oracle server farm consists of 6x Blade servers, each with 1x CPU. Failover Scenario: 1) Virtual Connect senses server down 2) Virtual Connect boots cold spare 3) Cold Spare boots to Virtual Connect and is assigned the boot LUN for Oracle on the attached 3PAR 4) Cold Spare comes online as Oracle server 5) Recovery Complete, time taken ~ 90-seconds …we deliver bespoke multi vendor IT solutions enabling your organisation to achieve its business and technological objectives. …we provide fast, flexible and resilient IT infrastructure that forms the backbone your organisation. …our comprehensive suite of end-to end IT services ensures complete support to your business and IT infrastructure.
14
Our method In this example an Oracle server farm consists of 6x Blade servers, each with 1x CPU. Failover with Workload Prioritisation: With Workload Prioritisation, you assign priorities to each service run by Virtual Connect. In the event of a failure where no cold spare servers are available another server running a less important function will switch roles in the event of a failure. …we deliver bespoke multi vendor IT solutions enabling your organisation to achieve its business and technological objectives. …we provide fast, flexible and resilient IT infrastructure that forms the backbone your organisation. …our comprehensive suite of end-to end IT services ensures complete support to your business and IT infrastructure.
15
Additional benefits Increases availability to 6 x 9's without increasing deployment costs Achieves increasing ROI on your licensing costs as you scale Achieves unparalleled levels of Oracle performance while reducing deployment costs Add other applications in to the solution to gain the same benefits Easier system management Reduces power and cooling Increases performance …we deliver bespoke multi vendor IT solutions enabling your organisation to achieve its business and technological objectives. …we provide fast, flexible and resilient IT infrastructure that forms the backbone your organisation. …our comprehensive suite of end-to end IT services ensures complete support to your business and IT infrastructure.
16
Oracle & HPE 3PAR
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.