1 Bass Lake Protection Activity
Annual Meeting, June 3, 2017

2 Updated Bass Lake Management Plan
Completed December 2016 All Lake District Owners/Residents Involved Participate in planning meetings Respond to survey One of major concerns was water quality Many Factors One of biggest is phosphorous loading Controllable and Uncontrollable Focus on Controllable Loading from Shoreline Properties June 03, 2017 Footer text here

3 Shoreline Assessments
County Sponsored project 3 years ago Both County employees involved moved on before completion Data lost? Little or no follow up BLRD to revisit with newly updated plan Move forward with initial Grant (One month turn) Original plan to have Demonstration sites showing Best Management Practices (BMP’s) Use as showcases for others to copy/get ideas Found there was time to also apply for an extensive grant to support more sites and implementation. June 03, 2017 Footer text here

4 General Process Cost sharing Process First Year Next Two Years
Home owner pays 30% of cost, Grant pays 70% Process Site Assessment What can be done, is owner willing to do what should be done Design (Assuming something can be done & owner willing) Implementation Owner can do some of the work to account for their 25% of project First Year Targeting sites through assessment and implementation Next Two Years Cycle sites through each year. Interested? – Sign up if interested in next year or the following. June 03, 2017 Footer text here

5 Lake Management Planning Implementation Project
LAKE PROTECTION GRANT AWARDED $77,520 ($77,520.00/$25, BLRD match) GRANT TIMEFRAME /11/2017 – 12/31/2019 PROJECT IS AIMED AT: Reducing Phosphorous Loads Protecting and Improving diverse aquatic life through Shoreland Restoration projects and Best Management Practices(BMPs) installation June 03, 2017 Footer text here

6 Lake Management Planning Implementation Project
PROJECT ACTIVITIES: Conduct Site Analysis and Design for storm water runoff, fisheries, and shoreland restoration practices Provide Technical Assistance to develop designs and how-to information(DIY and/or landscapers) Establish and Install BMPs at Demonstration Sites (12-15 in 2017) Promote Installation of Shoreland BMPs using Demonstration Sites Install 40 additional Fish Cribs (over 3 years) June 03, 2017 Footer text here

7 Lake Management Planning Implementation Project
PROJECT DELIVERABLES: All Data Collected List and Map of Demonstration and Fish Crib Sites Before and After Photos Individual Site Analysis Reports All Outreach and Event Materials (Including this one ) Agenda and Minutes from Advisory Committee Meetings June 03, 2017 Footer text here

8 Lake Management Planning Implementation Project
SPECIAL CONDITIONS: Wisconsin Department of Natural Resources (WDNR) Lake Management Coordinator will be provided with all data and maps The Scope on previous pages summarizes the detail Date, records, reports, including Graphical Information System(GIS) –based maps, and digital images, must be submitted in a specified format to the Lakes Coordinator June 03, 2017 Footer text here

9 Rain Gardens June 03, 2017 Footer text here

10 Shoreline Buffers June 03, 2017 Footer text here

11 Waterfront Projects June 03, 2017 Footer text here

12 Rock Trench to Rain Gardens
June 03, 2017 Footer text here

13 Bass Lake Protection Activity
Annual Meeting, June 3, 2017

14 July 22, 2012 Footer text here