Download presentation
Presentation is loading. Please wait.
Published byScarlett Boone Modified over 7 years ago
1
Beacon Station Scheme Philip Webb & Iain Hardcastle
Performance Review Team May 2009
2
Beacon Station Scheme History :- Need to improve productivity
Need to increase efficiency Need to reduce carbon footprint Need to embed performance management into culture of HFRS Shift changes – move to 12 hour shifts
3
Beacon Station Scheme Introduced in April 2008 Aim:
To improve the overall performance of the Service to enable it to better deliver the Service Plan; and to ensure there is a clear customer focus and commitment to excellence in all our activities.
4
Beacon Station Scheme Beacon Station Status Indicators: Target
Loss/ theft of PPE zero Completed Home Fire Safety visits (WT only) 100% Vehicle accidents (low speed) zero Short term sickness (WT only) days Completed workplace assessments %
5
Beacon Station Scheme Beacon Station Status Indicators (cont’d) Target
IRS process completed in 14 days 100% Station energy usage below 3 year average Compliance with Working Time Directive PDR process Turn out times WT–1 min/ RDS–5 mins Completed PDRs % Appliance availability (RDS only) 100%
6
Beacon Station Scheme Pre-requirement for introduction:
Access to accurate performance information on all levels Accountability and responsibility Devolved budgets Focus on outcomes instead of outputs
7
Beacon Station Scheme Publicity:
“Performance Matters” publication includes highlights of performance Routine Notice Managers’ Seminars HFRS Celebrating Success event Service Delivery (Performance Management Group)
8
Beacon Station Scheme Reward Menu
Arrangement of cover for Xmas (WDS only) One day’s extra leave Flexible Working Routines Recognition of merit (certificate) Team linking/ development day Recognition of Achievement (HFRS Celebrating Success event) £5,000 extra to spend on fabric and furniture on stations
9
Achievement of Beacon Status
Beacon Station Scheme Anticipated outcome Achievement of Beacon Status
10
Beacon Station Scheme Actual outcomes include: Turnout times improving
Station altering accommodation arrangements Sickness down by almost 50% Energy consumption reducing Significant reduction in missing kit
11
Beacon Station Scheme Next Steps: Review indicators and targets
Introduce Beacon Department scheme
12
Beacon Station Performance Indicators
Beacon Station Scheme Beacon Station Performance Indicators
13
Beacon Station Scheme
14
Beacon Station Scheme County level Hampshire
15
Beacon Station Scheme Group level Basingstoke group
16
Beacon Station Scheme Station level Basingstoke station
17
Beacon Station Scheme Watch level Basingstoke blue watch sickness
18
Beacon Station Scheme Previous Performance
19
Beacon Station Scheme Commentaries
20
. . . or was it really that bad?
Beacon Station Scheme Any questions? . . . or was it really that bad?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.