University of Turkish Aeronautical Association Faculty of engineering EEE department TESTING AND MAINTENANCE OF POWER TRANSFORMER Supervision Prof. Dr. Ibrahim Mahariq Department of Electrical Engineering TAA. University Ankara , Turkey Presented by Othman Al Darraji Department of Electrical Engineering TAA. University Ankara , Turkey Presented by Omar Saadi Alshear Department of Electrical Engineering TAA. University Ankara , Turkey Turkey – Ankara TESTING AND MAINTENANCE OF POWER TRANSFORMER
2
DEFINITION OF THE TRANSFORMER
DISCUSSION DEFINITION OF THE TRANSFORMER TEST REQUIRMENTS TESTING OF TRANSFORMER ROUTINE TESTS REGULAR MAINTENANCE FOR POWER TRANSFORMERS TESTING AND MAINTENANCE OF POWER TRANSFORMER
3
WHAT IS TRANSFORMER? Transformer is a static device which transforms A.C electrical power from one voltage to another Voltage keeping The frequency same by Electromagnetic induction. TESTING AND MAINTENANCE OF POWER TRANSFORMER
4
WHAT IS TRANSFORMER? IRON CORE
TESTING AND MAINTENANCE OF POWER TRANSFORMER
5
DEFINITION OF THE TRANSFORMER
DISCUSSION DEFINITION OF THE TRANSFORMER TEST REQUIRMENTS TESTING OF TRANSFORMER ROUTINE TESTS REGULAR MAINTENANCE FOR POWER TRANSFORMERS TESTING AND MAINTENANCE OF POWER TRANSFORMER
6
TEST REQUIREMENTS 1- NAME PLATE FOR TRANSFORMER S.N: 925 554 1=50KVA
TESTING AND MAINTENANCE OF POWER TRANSFORMER
7
2-TESTING DEVICES TEST REQUIREMENTS
TESTING AND MAINTENANCE OF POWER TRANSFORMER
8
4 - MECHANICAL EQUIPMENT
TEST REQUIREMENTS 3- SAFETY EQUIPMENT 4 - MECHANICAL EQUIPMENT TESTING AND MAINTENANCE OF POWER TRANSFORMER
9
DEFINITION OF THE TRANSFORMER
DISCUSSION DEFINITION OF THE TRANSFORMER TEST REQUIRMENTS TESTING OF TRANSFORMER ROUTINE TESTS REGULAR MAINTENANCE FOR POWER TRANSFORMERS TESTING AND MAINTENANCE OF POWER TRANSFORMER
10
TESTING OF TRANSFORMER
Types of testing 1- Routine tests 2- Type tests 3- Special tests TESTING AND MAINTENANCE OF POWER TRANSFORMER
11
TESTING OF TRANSFORMER
1-ROUTINE TESTS 1.1- Measurement of voltage ratio 1.2-Vector group verification 1.3-Measurement of winding resistance 1.4-Impedance voltage test(z) 1.5-Dielectrics Test A-Measurement of insulation resistance. B- Dissipation power factor / insulation power factor (tan∂) C- OIL TEST TESTING AND MAINTENANCE OF POWER TRANSFORMER
12
THESE TESTS ARE CARRIED OUT ON ONE TRANSFORMER OF THE LOT.
TESTING OF TRANSFORMER 2- TYPE TESTS THESE TESTS ARE CARRIED OUT ON ONE TRANSFORMER OF THE LOT. 2.1- All routine tests. 2.2- Additionally following tests are included in type tests. A- Lightening impulse test. B- Temperature rise test.
13
TESTING OF TRANSFORMER
3-SPECIAL TESTS 3.1- Measurement of zero Phase sequence. 3.2- Measurement of acoustic noise level. 3.3- Measurement of harmonics of the no load current. 3.4- Magnetic balance test. TESTING AND MAINTENANCE OF POWER TRANSFORMER
14
DEFINITION OF THE TRANSFORMER
DISCUSSION DEFINITION OF THE TRANSFORMER TEST REQUIRMENTS TESTING OF TRANSFORMER ROUTINE TESTS REGULAR MAINTENANCE FOR POWER TRANSFORMERS TESTING AND MAINTENANCE OF POWER TRANSFORMER
15
Transformer Breakdowns
TESTING AND MAINTENANCE OF POWER TRANSFORMER
16
Sources of faults in transformer
TESTING AND MAINTENANCE OF POWER TRANSFORMER
17
TESTING AND MAINTENANCE OF POWER TRANSFORMER
18
Apply Tests Routine on Power Transformer
1-ROUTINE TESTS Apply Tests Routine on Power Transformer Type: 132/33 /11.5KV ,63 MVA VECT. GROUP: YnYnd11 TESTING AND MAINTENANCE OF POWER TRANSFORMER
19
1-1-Measurement of voltage ratio
1- This test measures the voltage ratio as per the customer’s requirement. 2- V1/V2 = N1/N2 3-The voltage ratio is equal to the turns ratio in a transformer. Using this principle, the turns ratio is measured with the help of a turns ratio meter. If it is correct , then the voltage ratio is assumed to be correct. 4- apply the rated ratio for all tab (1-17). 5-apply the rated ratio for (132 kv,33kv 11kv) 6- Equipment used : Transformer Turns Ratiometer ( T T R) TESTING AND MAINTENANCE OF POWER TRANSFORMER
20
1-1-Measurement of voltage ratio
Type: 132/33 /11.5KV ,63 MVA VECT. GROUP: YnYn0d11 Rated ratio (Ynd11)H.V-L.V=( 132 / √3 ) / 11.5= FOR TAP (9) Tap pos. TAP Voltage (kv) (A-N) / (a-c) (Measured value) (B-N) / (b-a) (C-N) / (c-b) Rated Ratio (Rated value ) 1 145.2 / 11.5 9 10 11 132.0 (132 ⁄ √3) ⁄ 11.5 = 6.627 17 118.8 TESTING AND MAINTENANCE OF POWER TRANSFORMER
21
TEST: 1-1-Measurement of voltage ratio
VECT. GROUP: Ynd11 FOR H.V – L.V b c C B A L.V H.V M.V Ratio meter n TR. TR. TESTING AND MAINTENANCE OF POWER TRANSFORMER
22
The no-load deviation of the turn ratios should be ≤ % 0,5
1-1-Measurement of voltage ratio APPLLY THIS LAW The no-load deviation of the turn ratios should be ≤ % 0,5 TESTING AND MAINTENANCE OF POWER TRANSFORMER
23
The use of modern equipment
1-1-Measurement of voltage ratio The use of modern equipment . TTR (Transformer Turns Ratio) TESTING AND MAINTENANCE OF POWER TRANSFORMER
24
1-2-Vector Group Verification
This test is very important for an engineer to figure out directional connectivity for transformers. (( Dy11 ,Yd11, Dy1,Yd1)) TESTING AND MAINTENANCE OF POWER TRANSFORMER
25
Dy11 Yd11 TESTING AND MAINTENANCE OF POWER TRANSFORMER
26
Dy1 Yd1 TESTING AND MAINTENANCE OF POWER TRANSFORMER
27
1-2-Vector Group Verification
Steps to implement the test STEP 1 Connect H.V STEP 2 S.C STEP 3 Take V B-b , B-c ,C-b , C-c TESTING AND MAINTENANCE OF POWER TRANSFORMER
28
1-2-Vector Group Verification
C-b > C-c ≈ B-b ≈ B-c B-c > B-b ≈ C-c ≈ C-b B-c ≈ C-b>B-b ≈ C-c Dy11 Dy1 Dd0 Yd11 Yd1 Yy0 TESTING AND MAINTENANCE OF POWER TRANSFORMER
29
1-3-Measurement of winding resistance
D.C RESISTANCE This test measures the resistance of the H.V , M.V& L.V winding. The values of resistance should be balance for all three phases and should match the designed values. Equipment used : Digital resistance meter. TESTING AND MAINTENANCE OF POWER TRANSFORMER
30
1-3-Measurement of winding resistance
Type: 132/33 /11.5KV ,63 MVA VECT. GROUP: YnYn0d11 FOR H.V, USES TAP POS FOR M.V , USES TAP POS FOR L.V , USES TAP POS. 1 Tap pos. A-N ohm B-N C-N Resistance 3-ph Oil Temp Rest. At 75C˚ 1 9 0.4108 0.4104 0.4192 1.2305 19C˚ 1.5023 17 TESTING AND MAINTENANCE OF POWER TRANSFORMER
31
1-3-Measurement of winding resistance
Type: 132/33 /11.5KV ,63 MVA VECT. GROUP: YnYn0d11 WHEATSTON BRIDGE a N WIND. REST. FOR H.V b c C B A L.V H.V M.V WHEATSTON BRIDGE n TR. TESTING AND MAINTENANCE OF POWER TRANSFORMER
32
RESISTANCE WINDINGS AT 75 C˚
Where : T: CONSTANT == for copper T1: 75C˚ T2: The temperature at which the measurement (19C ˚). Rt1: Resistance value at the temperature (75C ˚). Rt2: Resistance value at measured temperature Rt1= ohm TESTING AND MAINTENANCE OF POWER TRANSFORMER
33
A V V V 1-3-Measurement of winding resistance
Type: 132/33 /11.5KV ,63 MVA VECT. GROUP: YnYn0d11 VOLTMETER – AMMETER Apply ohm law H.V N B C D.C 12V V A N B M.V C A V L.V C B TESTING AND MAINTENANCE OF POWER TRANSFORMER
34
1-3-Measurement of winding resistance
Type: 132/33 /11.5KV ,63 MVA VECT. GROUP: YnYn0d11 WINDING REST. H.V The use of modern equipment a N b c C B A L.V H.V M.V n TR. 2 1 The use of modern equipment TESTING AND MAINTENANCE OF POWER TRANSFORMER
35
1-3-Measurement of winding resistance
What is the benefit of? 1- It is to compare the design calculations in terms of volumes conductors used 2- Resistance winding test used in calculating copper losses TESTING AND MAINTENANCE OF POWER TRANSFORMER
36
S.C ON L.V 1-4-IMPEDANCE VOLTAGE TEST(Z) A A A
Type: 132/33 /11.5KV ,63 MVA VECT. GROUP: YnYn0d11 VOLTMETER - AMMETER S.C ON L.V A A A TESTING AND MAINTENANCE OF POWER TRANSFORMER
37
IMPEDANCE VOLTAGE TEST(Z)
Type: 132/33 /11.5KV ,63 MVA VECT. GROUP: YnYn0d11 IMPEDANCE VOLTAGE (Z) :( H.V—L.V) (1,9,17) TAP POS. IMPEDANCE VOLTAGE (Z) :( H.V—M.V) (1,9,17) TAP POS. Tap pos. A-B B-C C-A A B C 1 420V 422V 429V 3.5AMP 3.3AMP 3.4AMP 9 17 TESTING AND MAINTENANCE OF POWER TRANSFORMER
38
Why do we apply the equation below?
IMPEDANCE VOLTAGE TEST(Z) Why do we apply the equation below? FOR EXAMPLE: Rated voltage =145.2kv , Rated current =250.5 Applied voltage Measured current AB= A=3.5 BC= B=3.3 CA= C=3.4 Apply the law : Z=+ -7.5% FOR TWO WINDINGS Z=+ - 10%FOR THREE WINDINGS TESTING AND MAINTENANCE OF POWER TRANSFORMER
39
IMPEDANCE VOLTAGE TEST(Z)
What is the benefit of? 1- In the case of connecting a power transformer in parallel with the other Test engineer must calculate the value of impedance. A impedance value should be close. 2- When measuring three windings currents, they are roughly equal. In the case of a damage in one winding .the current size. it will be bigger than two windings remaining. This gives an indication of the presence of a defect in winding. 3- Read the short circuit level FOR EXAMPLE: Rated voltage =145.2kv , Rated current =250.5 TESTING AND MAINTENANCE OF POWER TRANSFORMER
40
1-5-Dielectrics Test The dielectrics are separation between the parts of the electrical system, and it may be solid or gaseous or liquid or free space , and there is no insulating material full electrical insulation , there is a certain electric current passes through it , in spite of the low value of the electric current .You should know the value of this electric current. The dielectric value less over a period of time. Because of their exposure to different pressures TESTING AND MAINTENANCE OF POWER TRANSFORMER
41
1-5-Dielectrics Test Types of dielectric tests
1- Measurement of insulation resistance 2- Dissipation power factor / insulation power factor (tan∂) 3- Test oil TESTING AND MAINTENANCE OF POWER TRANSFORMER
42
1-5-1- Measurement of insulation resistance.
1- Measures the insulation resistance of HV & LV windings with respect to earth (body) and between LV & HV winding. 2- Voltage used: 1000 V to 5000 V 3- Recommended Values are ( M)Ohms for HV & 500 Mohms for LV. 4- Equipment used: MEGGER IS USED. TESTING AND MAINTENANCE OF POWER TRANSFORMER
43
1-5-1- Measurement of insulation resistance.
Type: 132/33 /11.5KV ,63 MVA VECT. GROUP: YnYn0d11 insulation resistance :( H.V—L.V) a N b c C B A L.V 11.5kv H.V 132kv M.V33kv n TR. TESTING AND MAINTENANCE OF POWER TRANSFORMER
44
1-5-1- Measurement of insulation resistance.
TESTING AND MAINTENANCE OF POWER TRANSFORMER
45
1-5-2-Dissipation power factor
this test done on the electrical transformer to see the quality of isolators used in the TRANSFORMER WINDINGS . and isolators operate among themselves capacitors as in the illustration. 132 kv 33 kv 11.5 kv TESTING AND MAINTENANCE OF POWER TRANSFORMER
46
1-5-2-Dissipation power factor
1- In capacitor ideal has no losses. The electric current precedes voltage an angle of (90˚). TESTING AND MAINTENANCE OF POWER TRANSFORMER
47
1-5-2-Dissipation power factor
2- In practical, all capacitors find where the loss in insulation TESTING AND MAINTENANCE OF POWER TRANSFORMER
48
1-5-2-Dissipation power factor
TESTING AND MAINTENANCE OF POWER TRANSFORMER
49
1-5-2-Dissipation power factor
TESTING AND MAINTENANCE OF POWER TRANSFORMER
50
1-5-2-Dissipation power factor
b c C B A L.V 11.5kv H.V 132kv M.V33kv n TR. Tan TESTING e REPEAT THIS TEST: M-HLE: MEDIUM – HIGH , LOW , EARTH L-HME : LOW – HIGH , MEDIUM , EARTH H-M / H-L / M-L / TESTING AND MAINTENANCE OF POWER TRANSFORMER
51
1-5-2-Dissipation power factor
To find good values TESTING AND MAINTENANCE OF POWER TRANSFORMER
52
1-5-3- OIL TEST 1- Oil breakdown voltage is checked as per IS-335.
100 mm L X 70 mm B X 80 mm Ht. glass pot. 500ml Oil sample. 2- Spherical electrodes with gap of 2.5 mm 3- Recommended value : 60KV 4- Equipment used : OIL BDV TEST SET. TESTING AND MAINTENANCE OF POWER TRANSFORMER
53
DEFINITION OF THE TRANSFORMER
DISCUSSION DEFINITION OF THE TRANSFORMER TEST REQUIRMENTS TESTING OF TRANSFORMER ROUTINE TESTS REGULAR MAINTENANCE FOR POWER TRANSFORMERS TESTING AND MAINTENANCE OF POWER TRANSFORMER
54
Regular maintenance for power transformers
1- Periodic checking of any loose connections of the terminations of HV & LV side. TESTING AND MAINTENANCE OF POWER TRANSFORMER
55
Regular maintenance for power transformers
2-Breather examination. Dehydration of Silica gel if necessary. 3-Explosion vent diaphragm examination. 4-Conservator to be cleaned from inside after every three years. TESTING AND MAINTENANCE OF POWER TRANSFORMER
56
Regular maintenance for power transformers
5- Regular inspection of OIL & WINDING TEMPERATURE METER readings. 6- Cleanliness in the Substation yard with all nets, vines, shrubs removed. TESTING AND MAINTENANCE OF POWER TRANSFORMER
57
TESTING AND MAINTENANCE OF POWER TRANSFORMER
University of Turkish Aeronautical Association Faculty of engineering EEE department TESTING AND MAINTENANCE OF POWER TRANSFORMER Thank you for your attention! Questions? TESTING AND MAINTENANCE OF POWER TRANSFORMER
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.