Download presentation
Presentation is loading. Please wait.
1
Central Mining Institute
Department of Geology and Geophysics COmplex Mining EXploitation - optimizing mine design and reducing the impact on human environment COMEX WP1: Exploitation with overlying old shallow mines or open pit mines COMEX meeting October 2013, Nottingham 1
2
Geophysical measurements started in July 2013 and included:
Central Mining Institute Department of Geology and Geophysics Task 1.3: Field measurements at chosen sites and verification of developed methods. Geophysical measurements started in July 2013 and included: GPR measurements on selected profiles gravity survey in regular grid of points seismic refraction and MASW on selected profiles TEM soundings in points on selected profiles seismometric measurements of surface vibration underground mining seismic network subsidence measurements COMEX meeting October 2013, Nottingham 2
3
COMEX meeting 23-24 October 2013, Nottingham
Central Mining Institute Department of Geology and Geophysics Bobrek Mine Karb district COMEX meeting October 2013, Nottingham 3
4
COMEX meeting 23-24 October 2013, Nottingham
Central Mining Institute Department of Geology and Geophysics deep coal exploitation in seam 503 COMEX meeting October 2013, Nottingham 4
5
COMEX meeting 23-24 October 2013, Nottingham
Central Mining Institute Department of Geology and Geophysics …and in seam 504 COMEX meeting October 2013, Nottingham 5
6
COMEX meeting 23-24 October 2013, Nottingham
Central Mining Institute Department of Geology and Geophysics The area for numerical modeling Bobrek Mine - Karb district COMEX meeting October 2013, Nottingham 6
7
COMEX meeting 23-24 October 2013, Nottingham
Central Mining Institute Department of Geology and Geophysics First stage of GPR - Ground-Penetrating Radar - survey COMEX meeting October 2013, Nottingham 7
8
COMEX meeting 23-24 October 2013, Nottingham
Central Mining Institute Department of Geology and Geophysics Example of GPR profile on Bobrek - Karb COMEX meeting October 2013, Nottingham 8
9
COMEX meeting 23-24 October 2013, Nottingham
Central Mining Institute Department of Geology and Geophysics Second stage of GPR survey COMEX meeting October 2013, Nottingham 9
10
COMEX meeting 23-24 October 2013, Nottingham
Central Mining Institute Department of Geology and Geophysics Seismic survey on Bobrek - Karb COMEX meeting October 2013, Nottingham 10
11
COMEX meeting 23-24 October 2013, Nottingham
Central Mining Institute Department of Geology and Geophysics MASW profile no 1 refraction profile no 1 COMEX meeting October 2013, Nottingham 11
12
COMEX meeting 23-24 October 2013, Nottingham
Central Mining Institute Department of Geology and Geophysics MASW profile no 2 refraction profile no 2 COMEX meeting October 2013, Nottingham 12
13
COMEX meeting 23-24 October 2013, Nottingham
Central Mining Institute Department of Geology and Geophysics TEM – Transient Electromagnetic Method – survey on Bobrek - Karb COMEX meeting October 2013, Nottingham 13
14
COMEX meeting 23-24 October 2013, Nottingham
Central Mining Institute Department of Geology and Geophysics Results of TEM surveys on Bobrek - Karb COMEX meeting October 2013, Nottingham 14
15
COMEX meeting 23-24 October 2013, Nottingham
Central Mining Institute Department of Geology and Geophysics Gravity surveys on Bobrek - Karb COMEX meeting October 2013, Nottingham 15
16
COMEX meeting 23-24 October 2013, Nottingham
Central Mining Institute Department of Geology and Geophysics Bouger anomaly map on Bobrek - Karb COMEX meeting October 2013, Nottingham 16
17
COMEX meeting 23-24 October 2013, Nottingham
Central Mining Institute Department of Geology and Geophysics Monitoring of surface vibrations 7 surface stations within a distance of 4km COMEX meeting October 2013, Nottingham 17
18
COMEX meeting 23-24 October 2013, Nottingham
Central Mining Institute Department of Geology and Geophysics Underground seismic network 26 geophone stations (some of them 3-components) COMEX meeting October 2013, Nottingham 18
19
COMEX meeting 23-24 October 2013, Nottingham
Central Mining Institute Department of Geology and Geophysics Task 1.1: Developing combined techniques to assess the effects of mine exploitation on overlying old shallow mines and in open pit mines. Within the confines of this task Geocontrol will make numerical modeling on the basis of the geological model All the information from geophysics surveys will be used for building the near-surface part of the model Deep geological building comes from archived data COMEX meeting October 2013, Nottingham 19
20
COMEX meeting 23-24 October 2013, Nottingham
Central Mining Institute Department of Geology and Geophysics COMEX meeting October 2013, Nottingham 20
21
COMEX meeting 23-24 October 2013, Nottingham
Central Mining Institute Department of Geology and Geophysics COMEX meeting October 2013, Nottingham 21
22
COMEX meeting 23-24 October 2013, Nottingham
Central Mining Institute Department of Geology and Geophysics Map of subsidence on Bobrek - Karb The measured subsidence may be compared with modeling results COMEX meeting October 2013, Nottingham 22
23
COMEX meeting 23-24 October 2013, Nottingham
Central Mining Institute Department of Geology and Geophysics Task 1.2: Study of the influence of strong seismic events induced by mining on formation of sinkholes and cracks. In this task we will conduct numerical modelling with dynamic loads in Plaxis The recordings of surface vibrations will be added to the static model Model will include geological formations to the depth of old ore exploitation COMEX meeting October 2013, Nottingham 23
24
COMEX meeting 23-24 October 2013, Nottingham
Central Mining Institute Department of Geology and Geophysics Draft version of shallow model on Bobrek - Karb Example of surface vibrations recording PGA [mm/s2] COMEX meeting October 2013, Nottingham 24
25
COMEX meeting 23-24 October 2013, Nottingham
Central Mining Institute Department of Geology and Geophysics Example of total displacements calculated for Piaskowy shaft COMEX meeting October 2013, Nottingham 25
26
COMEX meeting 23-24 October 2013, Nottingham
Central Mining Institute Department of Geology and Geophysics vibrations added to model vibrations calculated on surface (blue) on building (red) COMEX meeting October 2013, Nottingham 26
27
COMEX meeting 23-24 October 2013, Nottingham
Central Mining Institute Department of Geology and Geophysics THANK YOU COMEX meeting October 2013, Nottingham
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.