1 Greetings from Spa Eco City & the creators of Frangipani Country Estates!! 

2 We would like to list below an update on the Progress of the Project.

3 SPA Eco City : Dream shaping to Realty

4 Underground Infrastructure

5 “ 80 % Sewage Manhole Construction Completed”
April May

6 “70 % Eco drain pipe(110 mm, 160 mm & 210 mm) laying for sewage lines Completed ”
April May

7 “80 % Storm water drainage chamber construction Completed ”
April May

8 “80 % Storm water drainage Hume pipes( RCC 300 MM) laying Completed ”
April May

9 “75 % Electrical HT pipe( 225 MM) laying Completed”

10 “ 65 % Electrical LT line cabling ( HDPE Pipe 50 MM)Completed ( Feeder pillar to individual plot) ”

11 “65 % Water supply line( 40 MM) laying Completed

12 “ 70 % Plot sewage chamber construction Completed ”

13 “Soil formation & Consolidation for water stream Under progress”

14 “Mock up villa- setting out on ground in progress”

15 “Wet mix laying for road formation Under Progress”
April May

16 Parks

17 My play ground : Park formation completed & Kerb stone fixing work Under progress

18 Senior citizen Park : Park formation completed & Kerb stone fixing Under progress”

19 Finishing Work

20 “Chamber covers fixing in plots Under Progress’

21 “LED street light sampling done”

22 “LED street light sampling done”

23 “Kerbstone fixing work Under progress”

24 “Pathway paver fixing Under Progress”

25 Individual plot marking Under Progress

26 “In & Out signage work Done”

27 “Other Work in progress”

28 “Chain link fence fabrication completed for installation above water stream”

29 “Site hoarding installation Under progress”

30 Current views of the Project

31 Current Views of Project

32 Current Views of Project

33 Current Views of Project

34 Project Approval Status
“No Objection Certificate" No. 9442/2014  from revenue department issued by Tahsildar - Hosur. Resolution No. 03/2014 passed by the "The President, Eachangur Panchayat Union" Land conversion processing File No. ROC No. 1263/2014 generated by "HNTDA - Hosur."    Statutory Public Notice in local News Papers was Published by HNTDA on 15th Sep 2014 and 30 days tenure completed without any objection. NOC from PWD Dtd: 19/12/14 received, issued by chief Engineer(Water Resources Organisation Govt Tamil Nadu),Chennai. HNTDA(Hosur New Town Development Authority) - Hosur, authority meeting concluded on 30/12/2014 adapting agenda No.2 held at sub collector office, Hosur, passed resolution to forward the file to DTCP - Chennai for conversion of the lands from Agriculture to Residential Zone. Conversion Order No. 43/ for Residential conversion of property issued by Housing and Urban Development Ministry Govt Of Tamil Nadu(Chennai)

35 Conversion Order No. 43/ for Residential conversion property received from Housing and Urban Development Ministry Govt. Of Tamil Nadu(Chennai)

36 Development charges as per demand notice dated 22/4/2015 are paid on 28/4/2015.
File No. 820/2015 is generated for Residential layout approval from DTCP Chennai through HNTDA- Hosur and received final verification/approval of road pattern for the layout from DTCP, and submitted for final approval. Layout plan is submitted to DTCP for final approval which is expected by the end of June 2016 as there is procedural delay due to assembly election of Tamilnadu.

37 Surrounding Infrastructure Development
Two flyovers under construction on Hosur road are now open for traffic. We are glad to inform that the existing Sarjapur Hosur road (Kagganoor Nallur Road) is getting widened to double the existing width by the State Highway Department in two phases. Phase 1 is completed. Phase -2 work is Under Progress.

38 “Sarjapur- Hosur Road (Kagganoor Nallur Road) Widening of the road from one side ( Phase-1) is completed.”

39 Sarjapur- Hosur Road (Kagganoor Nallur Road) Widening of the road ( Phase-2) is Under Progress.”

40 Sarjapur Town By-pass Road Widening Completed and Now Open for Traffic.

41 Sarjapur - Bagalur Road (NH207) is getting Widened.

42 Road from SIPCOT –I (Ashok Leyland) has been taken up for widening two culverts are currently being widened, this road would substantially reduce the distance and travel time via Hosur road to the project.  We are glad to inform that Karnataka BUDGET has enhanced the infrastructure development and connectivity for our project Frangipani and SPA Eco City by announcing the road widening from outer ring road junction to Dommasandra circle from the existing 60ft road to 150ft road, also the entire varthur road widening till sarjapur. Please find enclosed a screen shot of 14th March 2015 “Times of India” Page 8 and Deccan Herald article Dtd: 17th March 2015 for your ready reference.

43

44 Price : Current Pre-launch offer price for SPA Eco City : In light of the extremely encouraging development we are glad to announce that the offered price for SPA ECO CITY with effective form 7th May 2016 is Rs.2,000/- Per Sft for plots only.


Download ppt "We would like to list below an update on the Progress of the Project."

Similar presentations


Ads by Google