Download presentation
Published byDoris Hancock Modified over 7 years ago
1
Business Development, Acquisitions and Strategies
Hydro-Québec Setting new sights with our clean energy Gary Sutherland Business Development, Acquisitions and Strategies JPAC Session, Ottawa November 7, 2016
2
OUR REALITY HYDRO-QUÉBEC
3
Québec: vast land area and water resources
HYDRO-QUÉBEC
4
Our energy, an asset to Québec
99% OF ELECTRICAL POWER GENERATED USING WATER clean, renewable and reliable HYDRO-QUÉBEC
5
Greenhouse gas emissions from different power generation options
Hydroelectric - HQ: run-of-river Boreal Reservoirs = Low GHG Emitters Continuous generation Intermittent generation Nuclear Wind Hydroelectric - HQ: with reservoir Photovoltaic solar Thermal: natural gas Thermal: coal HYDRO-QUÉBEC
6
Evolution of inflation and energy prices in Québec 1963-2015
Index (1963 = 100) Electricity Natural gas Oil CPI HYDRO-QUÉBEC
7
TODAY’S ENERGY TRADING RELATIONSHIP
RADISSON DES CANTONS SANDY POND Ontario 3.6 TWh QUÉBEC ONTARIO NOUVEAU- BRUNSWICK ME VT NH MA NY New Brunswick 2.4 TWh New England 15.2 TWh New York 7.2 TWh THE NORTHERN PASS HYDRO-QUÉBEC
8
Avoiding greenhouse gases through electricity exports
HYDRO-QUÉBEC EXPORTS AVOIDED 7.4 MILLION METRIC TONS OF CO2 EQUIVALENT EMISSIONS, EQUAL TO: EMISSIONS FROM 1.85 MILLION CARS 25% OF EMISSIONS FROM NEW ENGLAND’S THERMAL GENERATING STATIONS HYDRO-QUÉBEC
9
600 $130 M Our context IN R&D CHARGING STATIONS More than
Annual investment of IN R&D HYDRO-QUÉBEC
10
Our Strategies for the Future
HYDRO-QUÉBEC
11
Develop new growth avenues
Increase exports Acquire assets or stakes Commercialize our innovations Increase the capacity of our generating fleet HYDRO-QUÉBEC
12
Enhancing the clean energy trading relationship Nuclear refurbishment
RADISSON DES CANTONS SANDY POND Nuclear refurbishment QUÉBEC ONTARIO NOUVEAU- BRUNSWICK ME VT NH MA NY Ambitious GHG reduction goals 40% GHG reduction and 50% renewable goal by 2030 Integration of renewable energy 100% renewable energy THE NORTHERN PASS HYDRO-QUÉBEC
13
Optimizing grid integration to reduce GHG emissions
RADISSON DES CANTONS SANDY POND QUÉBEC ONTARIO NOUVEAU- BRUNSWICK ME VT NH MA NY A significant agreement: Energy 2 TWh per year to Ontario Capacity 500 MW of winter capacity for Québec Energy cycling making the electricity market more efficient THE NORTHERN PASS
14
Massachusetts: new business opportunities
RADISSON DES CANTONS SANDY POND QUÉBEC ONTARIO NOUVEAU- BRUNSWICK ME VT NH MA NY Hydro: 9.45 TWh Long-term contracts THE NORTHERN PASS
15
Business Development, Acquisitions and Strategies
Hydro-Québec Setting new sights with our clean energy Gary Sutherland Business Development, Acquisitions and Strategies JPAC Session, Ottawa November 7, 2016
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.