2 Background Construction industry is unique in nature (Rijn, 2005)
Procurement is the process used to deliver construction projects (Ey, Zuo, & Han, 2014) Adoption of an accurate procurement method is an essential requirement (Kumaraswamy & Dulaimi, 2001) Based on Selection Parameters an appropriate procurement method can be adopted (Thanh, Thomas, & Swee, 2003) Project Characteristics Client’s Requirements and Characteristics External Environmental Factors. MERCon 2016

3 Research Problem Numerous surveys has been carried out on ‘Construction Procurement Selection’ According to Hauf (1976), the four comparison categories of construction comparisons are; Private construction vs. Public construction Covered by Jayasena (2009) Building construction vs. Heavy/civil construction (Infrastructure) Investment building vs. Consumption building Total construction vs. New construction This research tends to get the solution for the problem of “Is there any significant difference between Building Construction and Infrastructure construction regarding the procurement selection criteria, in Sri Lanka?” A null assumption is made as; “There is a difference between Building Construction and Infrastructure construction regarding the procurement selection criteria, considering the Sri Lankan Cotext” MERCon 2016

4 Aim and Objectives Aim Objectives
This research aimed to determine the level of significant difference between Building Construction and Infrastructure construction regarding the procurement selection criteria in Sri Lanka Objectives Identify the various procurement selection criteria and parameters which are used both in Building and Infrastructure projects Identify the top twenty substantial parameters influencing the procurement selection Rank the identified parameters in both Building and Infrastructure projects Compare the ranked parameters in both sectors to analyse the significance of difference of procurement selection criteria MERCon 2016

5 Literature Findings Procurement Methods are majorly classified as Traditional and non-traditional systems Initially, only three requirements were considered; Time, Cost, and Quality Now, it is complicated due to complexity of clients’ expectations and construction projects Having two major categories; Building and Infrastructure, both categories have their own requirements and characteristics Thus, a procurement method should be compatible with the project type, address the technical topographies, financial and other possible risks to lead the project towards the success MERCon 2016

6 Literature Findings Contd…
Trend of Construction Projects in Sri Lanka Type of Construction 2009 2011 2013 Value of work done (Rs. Mn) % Building 28,633 45.5 37,623 48 57,960 51.1 Highway 19,581 31.1 25,505 32.6 30,381 26.8 Bridge 825 1.3 3,301 4.2 10,429 9.2 Water supply & Drainage 10,103 16 7,226 1,058 0.9 Irrigation & Land Drainage 443 0.7 962 1.2 6,697 5.9 Dredging & Reclamation 180 0.3 44 0.1 1 0.0 Other 3,230 5.1 3,659 4.7 6,904 6.1 Total 62,995 100 78,320 113,430 Source: (Department of Census & Statistics, 2010, 2012, 2015) MERCon 2016

7 Literature Findings Contd…
Available Procurement Methods (Source: Ratnasabhapathy, 2006, p.7) MERCon 2016

8 Literature Findings Contd…
Client’s Requirements Cost related Factors Capital Cost Maintenance cost Cost Certainty Price Competition Financial Risk Tendering Cost Time Related factors The early start of project Time for Planning and Designing Time for Tendering and Evaluation Construction time and Speed of construction Quality Related factors Design improvement and Reliability Workmanship Aesthetic appearance Complexity of the project Other general factors Allocation of Responsibilities Accountability Transparency Familiarity Flexibility Disputes and Arbitration Project Characteristics Project Type Project Size Project Cost Time Constraints Payment method of the project Integration of Design and Construction of the Project Project Funding Method Site Risk Factors Construction Method Degree of Innovation Technology Involvement Client’s Characteristics Types of client Experience level of the client Technical and financial capability of the client Willingness of client to bear risks Client’s willingness to be involved Client’s trust towards other parties Clear express of end user’s requirements CONSTRUCTION PROCUREMENT SELECTION External Environment Internal Environment MERCon 2016

9 Literature Findings Contd…
Factors influencing in procurement adoption were identified Client Requirements Client Characteristics Project Characteristics Influence on the choice of procurement method in both Building and Infrastructure projects in Sri Lanka??? MERCon 2016

10 Research Methodology Research Approach Quantitative Approach
Delphi Technique (Questionnaire Survey) Series of questionnaires to experts Reiterating same questions Providing group feedback from previous rounds Delphi Rounds Numbers of rounds – 3 Panel of experts Experience in SL construction industry Good knowledge on procurement systems Size of panel – 36 Quantity Surveyors, Manager Contracts, Civil Engineers Client and Consultancy Organizations MERCon 2016

11 Research Methodology Contd…
Evaluation Methodologies Mean weighted rating Mean weighed rating of each parameter is computed to deliver an indication of the importance of the factor Relative Important Index (RII) Relative Importance Index was used to rank the factors according to their significance in affecting procurement system selection Coefficient of Variation (COV) Coefficient of Variation (COV) delivers the standard deviation as a percentage of the mean and it is effective to evaluate relative variability of numerous responses Hypothesis Testing Statistical test using Spearman’s and Pearson’s Rank Correlation Coefficient Spearman’s and Pearson’s coefficients (r) can indicate the relationship between ranks MERCon 2016

12 Research Findings Delphi Round One
Factors influencing on procurement selection in SL: 21 Client requirements 07 Client characteristics and 11 project characteristics were accepted by more than 50% of the experts for both categories 05 additional client requirements and 02 project characteristics influencing on procurement selection were introduced by experts. Maintenance Cost, and Aesthetic appearance were suggested for building projects. Quality and safety policy, Number of long lead-time items involved were suggested for Infrastructure projects. Tendering cost is removed since it suggested by less than 50% of respondents MERCon 2016

13 Research Findings Contd…
Delphi Round Two To achieve the second objective… Identification of Top Twenty Significant Factors Influencing Procurement Selection for Building and Infrastructure projects Category Building projects Infrastructure projects Cost Related Factors 05 04 Time Related Factors 01 Quality Related Factors 02 Other General Factors Client's Characteristics 03 Project Characteristics 06 08 Client Requirements MERCon 2016

14 Research Findings Contd…
Delphi Round Three Final ranking of the parameters have been done as per the utility scores given by the experts The panel was requested to enter a utility score between 10 and (to exterminate the zero error) with 10 representing ‘very least favorable’ and 110 representing ‘very most favorable’ Cannot reject the null hypothesis (H0) since the Spearman’s Rank Correlation Coefficient and Pearson's Ranked Correlation Coefficient were bigger than alpha Null hypothesis H0: ρ= 0 (There is no correlation between rankings) Alternative hypothesis H1: ρ≠ 0 (There is a correlation between rankings) MERCon 2016

15 Conclusions This study was completely grounded on Delphi methodology in order to extort a gang of exclusive parameters which highly manipulating the procurement selection. Several Client requirements, Client characteristics, and project characteristics were identified. Top Twenty Significant Factors Influencing Procurement Selection for building projects and civil projects were identified. final ranking of the parameters have been done as per the utility scores given by the experts. While comparing the rankings, it was identified There is no correlation between rankings. MERCon 2016

16 Recommendations Success outcome of the projects will extremely hinge on apposite planning of works and correct selection of procurement path. Consideration of proper selection parameters were obtained a special place on procurement selection of construction projects. Professionals who involving in procurement selection of construction projects, must have extensive knowledge on selection parameters which influencing the choice of procurement path for a project Consideration of more factors may help the construction projects to obtain the subsidy of newly evolving procurement systems by evading the cultural influence of selection. MERCon 2016

17 Further Studies According to Hauf (1976), the four comparison categories of construction comparisons are; Building construction vs. Heavy/civil construction Private construction vs. Public construction Investment building vs. Consumption building Total construction vs. New construction. The first category was covered by a previous research by Jayasena (2009) and the second category was covered through this study. Since the third and fourth categories are not covered, it can be suggested as a further research. Further research can be carried out to identify the relationship between proper consideration of the procurement selection parameters and performance level of construction projects. As a further research to this study, identification of suitability of available procurement systems for each factors can be suggested. MERCon 2016

18 References Hauf, D. H. (1976). Building Contracts for Design & Construction (2nd ed.). John Wiley & Sons Inc. Jayasena, H. (2009). Factors Affecting Construction Procurement Selection: Study of Private sector vs. Public sector. Department of Building Economics. (Unpublished B.Sc. in Quantity Surveying Dissertation). University of Moratuwa: Sri Lanka. MERCon 2016

19 Thank You

20 Format of Delphi rounds
Instrument Questionnaire 1 Questionnaire 2 Questionnaire 3 Purpose To gather an exclusive group of selection parameters which influence the procurement selection To identify the top twenty significant parameters separately in both categories. To assess the level of significance and rank the parameters against building and civil procurement selection criteria. Number of experts selected 34 Data base for the design of Questionnaire Literature review Results from round one Results of factor analysis carried out for round two results MERCon 2016

21 Percentage of Response
Panel of experts Designation Number of Experts First Round Second Round Third Round Project Manager 04 Manager Contracts 03 02 01 Civil Engineer Chief Quantity Surveyor 07 05 Senior Quantity Surveyor 13 12 11 Quantity Surveyor Total Responses 34 30 26 Percentage of Response 100% 88.24% 76.48% MERCon 2016

22 Top 10 measures in Building construction procurement choice
Selection Parameter Rank Avg. Utility Factor Cost Certainty/Completion within the budget 1 95.23 Project Cost 2 83.85 Financial Risk 3 83.50 Construction Method 4 81.42 Project Size 5 81.19 Price Competition 6 74.73 The early start of project 7 73.92 Complexity of the project 8 73.65 Project Type 9 73.50 Time Constraints 10 70.23 MERCon 2016

23 Top 10 measures in Civil construction procurement choice
Selection Parameter Rank Avg. Utility Factor Time Constraints 1 93.23 Project Size 2 89.96 Quality and safety policy of the Client / Government 3 89.12 Price Competition 4 83.15 Project Cost 5 79.96 Construction Method 6 79.00 Cost Certainty/Completion within the budget 7 76.77 Project Funding Method 8 75.42 Financial Risk 9 75.04 Professional team performance 10 74.65 MERCon 2016