Stormwater Management
Flood Insurance Forum Stormwater Management Frank Galosi Section Head Stormwater Management Division Department of the Environment
2
STORMWATER MANAGEMENT DIVISION
3
CAPITAL IMPROVEMENT PROJECTS LOCATION MAP
4
PROJECT SITE INDEX CIP Projects
Fordham Street Drainage Channel Stabilization Design University Boulevard Cricket Field Stormwater Retrofit Project Allison Street Levee Project Ridgecrest/Ceasar Chavez Elementary School Water Quality Project North Brentwood Bio-Retention/Rain Garden Facilities Brentwood Bio-Retention/Rain Garden Facilities nd Street Storm Drainage Improvement Project th Place Storm Drainage Improvement Project
5
Fordham Street Drainage Channel Stabilization Design
PROJECT TYPE – Drainage Channel Stabilization and Wetland Creation PROJECT LOCATION – Intersection of West Park Drive & Fordham Street in Hyattsville, MD (Watershed: Northwest Branch) DRAINAGE AREA ac IMPERVIOUS AREA – 108 ac IMPERVIOUS AREA TREATED – 3.25 ac PROJECT PHASE – Completed (100%) TOTAL COST ESTIMATE – $560,000 (DESIGN: $107,000, CONSTRUCTION: $453,000) CONSTRUCTION COMPLETED – February 2017 PERMITTING – LOCAL, MDE, USACE
6
University Boulevard Cricket Field Stormwater Retrofit Project
PROJECT TYPE – Wet Pond PROJECT LOCATION – 7801 West Park Drive, Hyattsville, MD (Watershed: Northwest Branch) DRAINAGE AREA – ac IMPERVIOUS AREA – ac IMPERVIOUS AREA TREATED – 7.61 ac PROJECT PHASE – Design (90%) TOTAL COST ESTIMATE - $649,000 (DESIGN: $149,000, CONSTRUCTION: $500,000) ANTICIPATED CONSTRUCTION NOTICE TO PROCEED – August 2017 PERMITTING – LOCAL, MDE, USACE
7
Allison Street Levee Project
PROJECT TYPE – Flood Control PROJECT LOCATION – Allison Street, Mt. Rainier/Hyattsville/Brentwood, MD (Watershed: Northwest Branch) PROJECT PHASE – Bid COST ESTIMATE – $12,090,000 (DESIGN: $1,500,000, CONSTRUCTION: $10,590,000) ANTICIPATED CONSTRUCTION NOTICE TO PROCEED – July 2017 PERMITTING: LOCAL, MDE, USACE, DPIE, DPW&T, & SCD mnmn
8
Allison Street Levee Project
Project Description: Background Existing Levee system constructed by WSSC in late 1970’s to early 80’s to protect communities of Brentwood and North Brentwood and areas along the North West Branch from flooding due to major storm events Rehabilitate Allison Street Pumping Station Update electrical, mechanical and ventilation systems, Install new exterior generator Repair exterior concrete Levee System Raise system embankments and walls Extend levee system at 31st Street and Chillum Road Replace 34th Street Bridge
9
Ridgecrest/Ceasar Chavez Elementary School Water Quality Project
PROJECT TYPE – Submerged Gravel Wetland PROJECT LOCATION – 6120 Riggs Road, Hyattsville, MD (Watershed: Sligo Creek) DRAINAGE AREA – 1.29 ac IMPERVIOUS AREA – 0.73 ac IMPERVIOUS AREA TREATED – 0.73 ac PROJECT PHASE – Completed (100%) TOTAL COST ESTIMATE – $482,000 (DESIGN: $192,000, CONSTRUCTION: $290,000) CONSTRUCTION COMPLETED – June 2016 PERMITS REQUIRED: USACE, MDE, & SCD
10
Ridgecrest/Ceasar Chavez Elementary School Water Quality Project
SUBMERGED GRAVEL WETLAND #3
11
North Brentwood Bio-Retention/ Rain Garden Facilities
PROJECT TYPE – LID (Bio-retention/Rain Garden) PROJECT LOCATION – Pennwood Road, Part of Parcel 186, North Brentwood, MD (Watershed: Northwest Branch) DRAINAGE AREA – 0.90 ac IMPERVIOUS AREA – 0.62 ac IMPERVIOUS AREA TREATED – 0.62 ac PROJECT PHASE – Completed (100%) COST ESTIMATE – $100,000 (DESIGN: $25,000, CONSTRUCTION: $75,000) CONSTRUCTION COMPLETED – December 2009 PERMITS- DPW&T, SCD, MNCPPC
12
Brentwood Bio-Retention/ Rain Garden Facilities
PROJECT TYPE – LID (Bio-retention/Rain Garden) PROJECT LOCATION – Lot 88, Rhode Island Avenue, Brentwood, MD (Watershed: Upper Anacostia River) DRAINAGE AREA – 1.43 ac IMPERVIOUS AREA – 1.02 ac IMPERVIOUS AREA TREATED – 1.02 ac PROJECT PHASE – Complete (100%) COST ESTIMATE – $135,000 (DESIGN: $17,000, CONSTRUCTION: $118,000) CONSTRUCTION COMPLETED – November 2009 PERMITS- DPW&T, SCD, M-NCPPC, SHA
13
4522 32nd Street Storm Drainage Improvement Project
PROJECT TYPE – Drainage Improvement PROJECT LOCATION – nd Street, Mount Rainier, MD (Watershed: Northwest Branch) DRAINAGE AREA – 3.68 ac IMPERVIOUS AREA – N/A IMPERVIOUS AREA TREATED – N/A PROJECT PHASE – Construction (5%) COST ESTIMATE – $221,000 (DESIGN: $61,000, CONSTRUCTION: $160,000) ANTICIPATED PROJECT COMPLETION DATE – TBD PERMITS- DOE, DPIE, M-NCPPC
14
4307 40th Place Storm Drainage Improvement Project
PROJECT TYPE – Drainage Improvement PROJECT LOCATION – th Place, Brentwood, MD (Watershed: Upper Anacostia River) DRAINAGE AREA – 1.43 ac IMPERVIOUS AREA – 1.02 ac IMPERVIOUS AREA TREATED – 1.02 ac PROJECT PHASE – Complete (100%) COST ESTIMATE – $135,000 (DESIGN: $17,000, CONSTRUCTION: $118,000) CONSTRUCTION COMPLETED – November 2009 PERMITS- DPW&T, SCD, M-NCPPC, SHA
15
Prince George’s County Government
16
Flooding due to Drainage Issues
Investigation and remediation of: Property Flooding Home Flooding In addition to flood risks associated with stream level rise, adverse drainage conditions pose flood risks for property owners. Lack of positive drainage; collapsed or blocked storm drain inlets, pipes and outlets; excessive overland flow volumes etc. could result in property flooding or home flooding The Sustainable Initiatives Division (SID) responds to citizen complaints regarding drainage problems on private properties. Drainage complaints range in nature from private property flooding to home flooding and include such concerns as erosion and problems associated with sump pump discharges. Groundwater-associated problems are investigated with remedial actions suggested for homeowners, along with the provision of a residential drainage manual. SID investigates an average of 500 complaints per year, some of which evolve into corrective projects. Projects are initiated each year as a result of either homeowner complaints, referrals by other agencies, or requests by County Council Members. Should you have a drainage issue, please call Your concern will be addressed to the appropriate County agency for investigation.
17
Developing, Improving and Maintaining Properties in the Floodplain
Flood Insurance Forum Next Developing, Improving and Maintaining Properties in the Floodplain Reynaldo De Guzman Engineer Site Road Plan Review Division Department of Permitting, Inspection and Enforcement Vernon Stinnett, Chief Storm Drain Maintenance Division Office of Highway Maintenance Department of Public Works and Transportation