Preparation Phase of the FAIR Project
S. Reimann, U. Scheeler, P. Schuett operation department GSI Helmholtzzentrum Darmstadt Germany
2
Preparation Phase of the FAIR Project
Outline: The Fair Accelerator facility Beam time balance from Long term service program of the GSI accelerator Main topics of machine development FAIR Main Control Room project group Changes for the operation crew members Outlook and future activities 10/30/2014 U.Scheeler WAO
3
Preparation Phase of the FAIR Project
FAIR start version: SIS 100 p-Linac HESR CR cry-ring exp. caves 10/30/2014 U.Scheeler WAO
4
Preparation Phase of the FAIR Project
annual beam time from decrease in beam time until 2011 long shutdown in 2013 increase in interruption (break down, setup time and ion source service) -> aging of components, increasing user requirements, managing more tasks in parallel 10/30/2014 U.Scheeler WAO
5
Preparation Phase of the FAIR Project
long term service program since 2010 post stripper section: mechanical service of Alvarez cavities I, IIA, IIB (seals, cables, water hoses, fittings), repair of 2 drift tubes in AIII and AIV and exchange of vacuum components (pumps and controllers) ESR: service of vacuum system of the ESR to improve vacuum pressure and repair of stochastic cooling system (kicker chamber) 10/30/2014 U.Scheeler WAO
6
Preparation Phase of the FAIR Project
upgrade program NEG coating of SIS vacuum system new injection beam section of the synchrotron new collimator system to reduce desorption new switching station for main power supply new bipolar ps for correction coils of COC system new ppm and ppp systems ion source development for uranium 3Hz operation new design for HSI-RFQ rods upgrade of gas stripper section intensive machine experiment program for improvement of the beam quality control system upgrade: new HW, VMS->Linux 10/30/2014 10/30/2014 U.Scheeler WAO U.Scheeler WAO 6
7
Preparation Phase of the FAIR Project
FAIR MCR project group design proposal for new MCR data collection for building and infrastructure like cable connections, air condition design, console arrangement test console installation in GSI control room only a few people are involved beamtime 2014 caused a break in work progress next step: discussion and definition of function and layout of operation software The goal: a fully digital control room 10/30/2014 U.Scheeler WAO
8
Preparation Phase of the FAIR Project
changes for the operation shift staff: due to the (expected) long operation break the redirection of personnel to new working tasks was organized the development of a new version of the electronic logbook was started in order to keep the operation knowledge available the decrease in salary due to long shutdown in 2013 was partly compensated at the end of last year 10/30/2014 U.Scheeler WAO
9
Preparation Phase of the FAIR Project
outlook and future activities: taking part in magnet testing of the superconducting dipoles of the SIS 100 provides the opportunity of 24/7 shift work a three month UNILAC operation period in 2015 is under discussion taking part in cry-ring operation to get in contact with new control software tools providing a training program for future operators concerning machine layout, control system, the operation parameters and the parallel operation modes 10/30/2014 U.Scheeler WAO
10
Preparation Phase of the FAIR Project
Thank you for your attention ! Many thanks to the GSI operation team! Further information: web: 10/30/2014 U.Scheeler WAO