Hammer Project KV020 S-KPI CBO
Project CA project S00102 oss KPI justification - Appendix © Ericsson AB 2016
2
Multitech 2G kpi Justification
PROJECT BAU MODERNIZATION Multitech 2G kpi Justification
3
Refer to OSS Justification
S G oss kpi justification # Description Target Value Technology Baseline KPI Result PASS/FAIL comments 2G (12/16/ /22/16) (3/22/2017-3/28/2017) A Cell Availability Maintain/Improved 99.95 99.90 Fail Refer to OSS Justification A CSSR_Voice 99.33 99.29 A DCR_Voice 0.32 0.31 PASS A PS_Drop 1.02 0.92 A Timing Advance A CS Traffic (Erl) A TCH attempt 119074 119709 A PS traffic (GB) 92.53 95.46
4
S00102 2G oss kpi justification
Analysis: Availability only having 0.05% discrepancy with baseline and others kpi all showed good result during result calculation period .
5
S00102 2G oss kpi justification
Analysis: Availability only having 0.04% discrepancy with baseline and others kpi all showed good result during result calculation period .