Presentation is loading. Please wait.

Presentation is loading. Please wait.

The Desk Jet Supply Chain

Similar presentations


Presentation on theme: "The Desk Jet Supply Chain"— Presentation transcript:

1 The Desk Jet Supply Chain
Vancouver PCAT - printed circuit card assembly and test FAT - final assembly and test 1 week cycle time no inventory Transport To San Jose, 1 day To EU 4-5 weeks To Asia 4-5 weeks

2 Stock vs Pull DC’s - Target stock levels Vancouver - Pull
Forecasted sales Safety stock to ensure availability Vancouver - Pull Replenish DCs to target levels just-in-time

3 The Physical Supply Chain
Supplier IC Mfg US DC Customer Supplier PCAT FAT EU DC Customer Supplier Mech Mfg Supplier AP DC Customer

4 Variability Material Availability Process Yields and Downtime
Transport time to Asia and Europe Demand

5 DCs Standard Process Some demand for “integration”
Receive Pick Pack and Label Ship Some demand for “integration” Little support for it

6 Forecasts Very bad in Europe Overstock on some models
Shortages of others

7 Proposals New Plant in Europe More Inventory Air freight to Europe
More complex forecasting methods ...

8 Demand Data


Download ppt "The Desk Jet Supply Chain"

Similar presentations


Ads by Google