Workshop Topics and Deliverables
Lloyd Gordon - Workshop Chair Los Alamos National Laboratory July 19, 2016
2
Topics Overall workshop goals Working Groups Workshop Logistics
Deliverables Presentations Guidance for Workshop Leads
3
Overall Workshop Goals
Share methods and successes in electrical safety across the complex.
4
Working Groups 1 DC Systems 2 Hazardous Energy Control
3 10CRF851 Flowdown, and Subcontractors 4 DOE Electrical Safety Handbook 5 Risk Assessment per 70E-2015 The following Topics and proposed deliverables are meant to stimulate ideas. They are not meant to be fixed or limiting.
5
Working Group 1 DC Systems
Leads Gary Dreifuerst, ex LLNL Stan Berry, ex Navy Alan Tatum, current ORNL Peter McNutt, NREL
6
Working Group 1 DC Systems
Leads – Gary Dreifuerst, Stan Berry, et. al. Description – This working group continues efforts from last year to quantify the degree of hazard posed by DC sources, especially where it differs from AC system hazards, and safe work procedures for DC systems, such as battery and photovoltaic systems, where de-energization methods are not obvious or practical. It provides input to standards-making bodies where justified Proposed Deliverable – Open
7
Working Group 2 Hazardous Energy Control
Stephanie Collins, LBNL Eric Stromberg, LANL Etc.
8
2016 ESW HEC Goals and Priorities – Break into 4 Groups
Finalize format of the LOTO Cross-walk and begin work on generic LOTO program (with draft program completed NLT end of 2016) Determine 2017 ES Month topic and assign folks to work on it (with draft completed end of January 2017) Look Alike Equipment Best Practice Proposal ARMS/ERMS (Arc Reduction Maintenance Switch)/(Energy Reduction Maintenance Switch) control
9
HEC WG Schedule Tuesday Afternoon Wednesday
Break into 4 groups and get to work LOTO 2017 Electrical Safety Month Look Alike Equipment ARMS/ERMS Control Generate products for HEC Working Group review Finalized LOTO crosswalk format; Generic program template ES Month Topic Look Alike Equipment draft BPP ARMS/ERMS Control draft BPP
10
HEC WG Schedule (continued)
Thursday Morning Thursday Afternoon Finish up working on products for this Workshop Identify continuing work and assign members & get commitment for completion Present HEC Working Group Progress
11
Working Group 3 Electrical Safety Subcontractors and 10CFR851 Flowdown
Jeff Williams, NNSA, Los Alamos etc.
12
Working Group 3 10CF851 Flowdown and Subcontractors
Lead: Jeff Williams, et.al. Description – This working group continues efforts from last year to improve flow-down of electrical safety requirements found in 10 CFR 851 and other contractual requirements to general and electrical contractors working for the DOE site contractors. Proposed Deliverable – Open
13
Working Group 4 DOE Electrical Safety Handbook
Lloyd Gordon, LANL Mike Hicks, Idaho DOE
14
Working Group 4 DOE Electrical Safety Handbook
Leads – Lloyd Gordon, Mike Hicks Description – This working group will renew efforts to keep the DOE Electrical Safety Handbook consistent with the most recent standards and incorporate appropriate measures gleaned from best practices and lessons learned. Proposed Best Practice – A summary comparison of site electrical AHJs and their processes, and how site AHJs can work together to achieve common goals.
15
Working Group 5 Risk Assessment
Tommy Martinez, LANL etc.
16
Working Group 5 Risk Assessment
Leads – Tommy Martinez, et.al. Description – This new working group will discuss implementation of the 2015 NFPA 70E, focusing on electrical system operations and minimum inspection, testing, and maintenance of overcurrent protective devices to assist in assigning arc flash controls. A consensus product is needed to establish thresholds for making risk based determinations. It provides input to standards- making bodies where justified . Proposed Best Practice – Open
17
Workshop Working Sessions
The workshops are working sessions everyone is expected to participate. Share issues/concerns you may have at your site. Distribute members from your organizations among the groups Have your deliverables ready to present on Thursday at 2:00 pm, 30 minutes each group
18
2016 Workshop Guidance EVERYONE must sign in, in their working group
Participants will break out into 5 working groups Groups may break into subgroups Each group will have 1 or more workshop leaders to assist with the continuity, scope, and direction All participants are encouraged to contribute to a workshop group Participants will remain in the same group End result is to produce usable product(s) and present the product(s) on Thursday afternoon Groups must develop a continuity plan to complete unfinished work In presentation define deliverable(s) and dates
19
Guide for Workshop Leads
Set goals and schedule Determine product Establish subgroups and facilitators Keep groups focused Develop presentation, pick presenter Plan for followup, set deadlines