1 Vassar strong vision Inspire Future Excellence…Learn, Achieve, Succeed
Bond Campaign Information

2 The issues for Vassar Public Schools….
The bond campaign will address three main points: Community: Inspire connections to the surrounding community through rejuvenating all buildings, providing a space for Future Excellence in programming for seniors, alternative education, early college, and an early childhood center to enhance the growing business area downtown. Efficiency: Providing quality Learning environment for all our students by updating roofing, electrical, plumbing, heating, and lighting, so the educational experience will promote Achievement, with our great Vulcan staff. Safety: Ensuring safe entrances, lobbies, security, bussing, seating, and parking so students have the best possible chance to Succeed, because every student deserves a safe place to learn.

3 Growing Business Community Candyland, Riverside, Sambuca, Vassar Vision, Assisted Living Center

4 Quality Learning Environment
Efficiency with updating through out all buildings and inspiring the future with a new academic wing.

5

6 Ensuring our students a Safe place to learn and succeed!

7 Bond Millage Information: CURRENT Existing millage based on an average $65,000 home with $32,500 SEV
The current millage of 2.5 mills to be rolled into new bond millage 32.5 SEV x 2.5 mills = $81.25/year is $6.77/month is $1.56/week is $0.22/day The Vassar Strong Vision Bonds in 2 series Everything priority listed from input from present/past bond meetings including a new academic wing Repairs and renovations at Townsend North, Central, Bus Garage, MS/Gym/Auditorium PROPOSED – 30 years – 3 mill increase on top of existing 2.5 mills 32.5 SEV x 5.5 mills maximum = $178.75/year for the first 6 years then averages to 4.2 mills at $136.50/year is $11.38/month is $2.63/week is $0.37/day $19,700,000

8 Calculate approximate cost of Vassar Strong Vision Bond
House Value SEV Yearly Monthly Weekly Daily 40,000.00 20,000.00 110.00 9.17 2.12 0.30 60,000.00 30,000.00 165.00 13.75 3.17 0.45 80,000.00 220.00 18.33 4.23 0.60 100,000.00 50,000.00 275.00 22.92 5.29 0.75 150,000.00 75,000.00 412.50 34.38 7.93 1.13 200,000.00 550.00 45.83 10.58 1.51 250,000.00 125,000.00 687.50 57.29 13.22 1.88 300,000.00 825.00 68.75 15.87 2.26 5.5mill bond to raise $19,700,000  

9 Priority Items Ranking School Item Cost estimate 1 Central Metal roof
913,275 2 Add secure entry to office 30,750 3 Central/TN Boiler Replacements 363,000 4 Upgrade fire alarm system 116,850 5 HS Asbestos removal 159,654 6 Replace Roof 716,168 7 Replace boilers 446,490 8 Anti-Scald show valves 5,905 9 Replace primary and secondary power systems 210,638 10 Upgrade security 109,532 11 Replace domestic water line/patch 67,650 Total $3,139,912

10 Priority Items Items Ranking School Item Cost estimate 1 HS
Add secure entry at Main Entrance New academic 2 BG New Buses 885,600 3 Central/TN Technology allowance 246,000 4 Upgrade emergency lighting 63,192 5 Replace Roof 58,056 6 Central Air conditioning in computer lab 33,825 7 MS Replace exterior doors/entrances 135,300 8 Replace lighting 79,827 9 Upgrade public address and bell system 109,532 10 Add variable frequency drives to pumps 39,914 11 Replace classroom unit ventilators 532,180 12 Upgrade Kitchen HVAC 152,520 13 Replace plumbing fixtures with low flow 32,964 14 49446 15 BS Lawn Mowers 44,280

11 Priority Items Ranking School Item Cost estimate 16 MS
Upgrade HVAC in office 74,415 17 CE Playground 215,250 18 Replace site lighting 79,827 19 Replace ceilings 78,360 20 MS/Central Replace exterior single pane windows 255,840 21 HS Upgrade HVAC in gym/aud/cafe 595,320 22 BG Renovate exterior 11,070 23 Remodel Auditorium 541,200 24 Central Replace fence 33,210 25 Replace water heater 7,442 26 FSE upgrades for old hood and ovens, sinks 35,670 27 Replace pneumatic controls 283,978 28 Add outlets 40,590 29 Automated lighting control 70,994 30 Replace carpet 228,596

12 Priority Items Ranking School Item Cost estimate 31 CE
Automated lighting control 90,651 32 MS Replace flooring 127,722 Total $5,183,325

13 Priority Items Ranking School Item Cost estimate 1 Central
Replace interior lighting fixtures 18,450 2 Re-grade ,tile and catch basins for play area 196,800 3 HS/MS Gym bleachers w/ADA compliant 255,446 4 HS Replace restroom exhaust 29,766 5 Replace plumbing fixtures 48,462 6 MS Replace/add electric water coolers 21,648 7 Add retaining wall 61,500 8 BG Replace/repair asphalt at bus garage 219,186 9 Add direct digital controls 241,818 10 Classroom furniture allowance 86,100 11 TN Demo octagon/asbestos removal 51,045 12 Repair/replace asphalt parking drives 344,892 13 Renovate Exterior 67,650 14 Replace window blinds 64,944 15 Central/TN Classroom furniture 16 Replace/Repair parking lots 435,420

14 Priority Items Ranking School Item Cost estimate 17 HS
Remodel locker rooms 507,375 18 MS Replace classroom casework 153,258 19 Replace football bleachers 221,400 20 Replace hall lockers 47,662 Central Paint and repair lockers 45,682 21 TN Replace roof/insulation 364,080 22 Replace exterior doors/entrances 37,208 23 Public restrooms for athletics 209,100 Total $3,814,996 24 New Academic Wing replacement 7,011,00 $19,149,229 Bond Costs 550,000 Final Total $19,700,000

15 Farm Land Preservation Credit Program

16 Meetings Sept. 13th Board of Education 6:30 pm
Sept. 14th Sanford/Bullard Library 5:30pm & 7:30pm Oct. 12th Vassar Theater 6pm Oct. 26th TBD Dec. 8th 1:30 Lansing meeting with treasury