Download presentation
Presentation is loading. Please wait.
1
2015 Resource Expansion Plan
OTC:CIBG 2015 Resource Expansion Plan DEVELOPING A MILLION OUNCE GOLD RESOURCE IN NEVADA February-March 2015
2
CAUTIONARY STATEMENT OTC:CIBG www.Nevada-Goldmine.com
This presentation contains “forward-looking statements” within the meaning of applicable Canadian securities regulations and Section 21E of the United States Securities Exchange Act of 1934, as amended and the Private Securities Litigation Reform Act of All statements other than statements of historical fact herein including, without limitation, statements regarding potential resources and reserves, exploration results, production rates and future plans and objectives, are forward-looking statements that involve various risks and uncertainties. Such forward-looking statements include, without limitation, (i) estimates and projections of future gold production and cash operating costs, (ii) estimates of savings or cost reductions, (iii) estimates related to financial performance, including cash flow and capital expenditures, (iv) estimates and projections of reserves and resources, (v)estimates and opinions regarding geologic and mineralization interpretation and (vi) estimates of exploration investment and scope of exploration programs. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements, in particular the estimates do not include input cost increases or gold price variations that could occur in future. Important factors that could cause actual results to differ materially from the companies’ expectations are disclosed in documents filed from time to time with the U.S. Securities and Exchange Commission (SEC). Forward-looking statements are based on the estimates and opinions of management on the date the statements are made, and the companies do not undertake any obligation to update forward-looking statements should conditions or management’s estimates or opinions change. Forward-looking statements are subject to risks, uncertainties and other factors, including gold and other commodity price volatility, political and operational risks, which are described in the companies’ 10K Form on file with the SEC ( as well as the companies' other regulatory filings. Cautionary Note to U.S. Investors ‐ The U.S. Securities and Exchange Commission permits U. S. mining companies , in their filings with the SEC, to disclose only those mineral deposits that a company can economically and legally extract or produce. We use certain terms in this presentation, such as “measured”, “indicated”, and “inferred” “resources”, which the SEC guidelines strictly prohibit U.S. registered companies from including in their filings with the SEC. U.S. investors are urged to consider closely the disclosure in our form 10‐K which may be secured from us or our website at James Ashton, P.E., and a Qualified Person as defined by NI , has reviewed and verified the technical information contained in this article as applicable. CURRENCY: All monetary amounts refer to United States dollars unless otherwise specified. February-March 2015
3
Precious metals oriented junior exploration & production company
OTC:CIBG CORPORATE OVERVIEW Precious metals oriented junior exploration & production company Technically strong management team Flagship Property: Independence Mine Project 1 million ounce gold & 4 million ounce silver resource (measured, indicated & inferred) Completed NI Technical Report and Update February-March 2015
4
Daniel J. Forbush, CPA President, CEO & Director
OTC:CIBG KEY PEOPLE Management Daniel J. Forbush, CPA President, CEO & Director Bryson Goodwin V.P. – Corporate Development, Director Donald J. McDowell, PLS V.P. – Project Development, Director P. Brenton Forbush, CPA Chief Financial Officer Non-Executive Directors Technical Advisers Walter Marting, Jr. Shane K. Dyer Larry Max Bigler Dr. Thom Seal, Phd., P.E.–Metallurgical Jeffrey Rassuchine - Geology James Ashton, P.E. – Mine Engineering, Robin Hendrickson– Geologic Engineer Dr. Steven Garwin, Phd., Chief Geologist William “Bill” Matlack, M.Sc., Geology -Investment Banking February-March 2015
5
INDEPENDENCE PROJECT OVERVIEW
OTC:CIBG INDEPENDENCE PROJECT OVERVIEW Located in Lander County, Nevada Total historic drilling: 241 drill holes over 92,680 feet (included in Cibolan Gold’s geological modeling) Cibolan Gold has drilled, logged, and modeled more than 40,000 feet from 128 RC drill holes and 3 core holes Multiple deposits at the property Near surface epithermal system Deep, high-grade underground target Numerous high grade intercepts including several multi-ounce 5 foot intercepts Mineralization open in multiple directions February-March 2015
6
Nevada is the 2nd largest silver producer in the U.S.
OTC:CIBG MINING IN NEVADA Nevada is ranked among the Top 10 most favorable mining jurisdictions in the world Nevada is responsible for nearly 80% of annual gold production in the U.S. Nevada is the 2nd largest silver producer in the U.S. Cibolan Gold’ Independence Project is located in the Battle Mountain-Cortez Gold Trend in Lander County February-March 2015
7
PROLIFIC BATTLE MOUNTAIN MINING REGION OTC:CIBG February-March 2015
8
OTC:CIBG SURROUNDING MINES Encircled by several large scale historic deposits – Fortitude, Marigold, McCoy/Cove, Phoenix, and Sunshine The Fortitude Mine’s historic production totaled 2.2 million ounces of gold and 9.7 million ounces of silver Fortitude is considered to be among the most lucrative mines in Nevada history * The historic Fortitude Mine lies only 4,000 feet northeast of the Independence Mine. February-March 2015
9
The Independence Project sits atop the same trend as the Phoenix Mine
OTC:CIBG SURROUNDING MINES: The Phoenix Mine, owned and operated by a major gold producer, flanks the Independence Project on three sides Phoenix Mine annually produces over 250,000 ounces of gold and 900,000 ounces of silver The property contains proven and probable reserves worth in excess of $20 billion The Independence Project sits atop the same trend as the Phoenix Mine * The Phoenix Mine also produces 22 million pounds of copper each year February-March 2015
10
Cibolan Gold Corporation acquired the Independence Project in 2005
OTC:CIBG PROPERTY HISTORY Independence Mine was intermittently in production from 1938 through 1987 Historic production: 11,000 ounces of gold and 750,000 ounces of silver Historic grades: 0.17 ounces gold per ton of and ounces of silver per ton Cibolan Gold Corporation acquired the Independence Project in 2005 February-March 2015
11
GEOLOGY AND MINERALIZATION
OTC:CIBG GEOLOGY AND MINERALIZATION Three targets of mineralization at Independence Project Multiple near surface epithermal systems A deep high grade, gold rich skarn Potential for a deeper gold-copper porphyry system * Geotechnical gold and silver survey for near-surface epithermal mineralization February-March 2015
12
NEAR SURFACE EPITHERMAL DEPOSIT
OTC:CIBG NEAR SURFACE EPITHERMAL DEPOSIT Shallow, open pit mineable target Measured & Indicated resource: 223,300 ounces of gold; 3,784,400 ounces of silver All 131 Cibolan Gold’ drill holes encountered mineralization Strike length of over 3,000 feet and depth of 400 feet Cibolan Gold is on track to complete a Preliminary Economic Assessment by the end of 2015 February-March 2015
13
High-grade, gold rich deep underground target
OTC:CIBG DEEP SKARN DEPOSIT High-grade, gold rich deep underground target From a limited number of drill holes, an Inferred resource of 796,000 ounces of gold already has been established Zone of mineralization is more than 1,400 feet wide and 3,400 feet long Potential for multi-million ounce gold resource February-March 2015
14
GOLD COPPER PORPHYRY TREND
OTC:CIBG GOLD COPPER PORPHYRY TREND Underlies the Independence Project’s deep skarn target One deep drill hole intercepted 2 oz/t gold This zone appears to be part of the highly prolific Battle Mountain-Eureka Trend, responsible for 23 million ounces of historic gold production The Battle Mountain-Eureka Trend could contain even greater resource potential than the parallel running Carlin Trend, which has produced over 180 million ounces of gold Cibolan Gold is planning to conduct additional deep drilling that could substantially expand the Independence Project’s resource base
15
Cibolan recently undertook a fresh review of the data
OTC:CIBG WHAT’S NEW AND WHY NOW Cibolan recently undertook a fresh review of the data Goal: Identify 4 to 5 million tons grading 0.05 ounces per ton to put on the preliminarily engineered leach pad Incorporate known data from other properties in area Focused on near surface, near term production opportunities Identified range front fault system along western edge of current drilling Several holes with multi ounce intercepts drilled west of the fault Tenth ounce or greater intercepts in other holes were on trend Proposed plan to expand this interpretation anticipates identifying up to 2.0 million tons grading an average of 0.30 OPT at a depth of approximately feet below the surface
16
New Resource Development Target Zones
OTC:CIBG New Resource Development Target Zones High Grade Gold: Range-front Structural Target Area Existing Oxide Au-Ag Resource C-1 Zone & Hill Zone TQP Low Grade Au Porphyry Oxide Resource Expansion Target C-1 Zone Oxide Resource Expansion Target N.E. Structure Target Au Oxide Delineation High Grade Gold N.E. Structure IND-2 Untested Outcropping Gold Zone N.S. Structure Target February-March 2015
17
Geologic Map Showing the Structural Outcroppings
OTC:CIBG Geologic Map Showing the Structural Outcroppings (Red inside C-3 unit) indicating the H.G. Range Front Target Area February-March 2015
18
High Grade Gold Delineation & Confirmation
OTC:CIBG High Grade Gold Delineation & Confirmation Proposed Core Drill Locations #1 Priority Proposed High Grade Gold Resource Expansion Delineation Core Drilling Plan X-Section in PPT Hill Resource Zone High Grade Gold: Range-front Structural Target Area IND-2- High Grade Gold N.E. Structure Target PDH Resource Expansion, HG Delineation & New Discovery Target Area February-March 2015
19
High Grade Range Front Discovery Zone
OTC:CIBG High Grade Range Front Discovery Zone Conceptual Resource Based on Drill Intercepts February-March 2015
20
Cross Section: 3100 GM-107 GM-108 Slst PDH GM-109 C-1 GM-111 PDH C-3
OTC:CIBG GM-107 GM-108 Slst PDH GM-109 C-1 GM-111 PDH C-3 Slst C-3 C-1 GM-111 Au-Opt Ag-Opt GM 0.049 0.230 GM 0.073 0.235 GM 0.022 0.364 GM 0.052 1.916 GM 0.119 1.714 GM 0.146 1.692 GM 0.039 0.811 GM 0.040 1.004 GM 0.083 0.700 GM 0.081 1.081 GM 0.042 0.912 GM 0.023 0.817 GM 0.018 0.492 GM 1.136 GM 0.056 1.113 GM 0.026 0.976 Slst 100’ C-1 C-1 C-2 High Grade Gold: Range-front Structural Target Area High Grade Gold Hill Resource Zone Slst C-2 C-1 50’ 100’ February-March 2015
21
Cross Section: 3200 C-1 High Grade Gold Hill Resource Zone High Grade
OTC:CIBG GM-68 Au-Opt Ag-Opt GM68 230 0.113 6.0 GM68 235 0.052 6.1 GM68 240 0.032 3.1 GM-52 Au-Opt Ag-Opt GM52 080 0.019 0.8 GM52 085 0.025 2.1 GM52 090 0.050 3.1 GM52 095 0.311 3.9 GM52 100 0.034 High Grade Silver Zone with Gold 7.0 opt Ag to 30.0 opt Ag GM-70 Au-Opt Ag-Opt GM70 345 0.012 1.5 GM70 350 0.072 31.7 GM70 355 0.017 3.0 GM-53 GM-24 C-1 GM-25 GM-52 GM-68 GM-69 C-1 PDH GM-70 PDH Slst C-1 C-3 C-2 Slst C-1 High Grade Gold Hill Resource Zone C-3 Range-front Structural Target Area Slst 100’ GM-70 Au-Opt Ag-Opt GM70 375 0.013 0.9 GM70 380 0.016 0.8 GM70 385 0.054 2.8 GM70 390 0.115 3.9 GM70 395 0.028 C-2 Slst 100’ C-1 February-March 2015
22
Cross Section: 3750 GM-73 Slst C-3 GM-128 100’ C-1 PDH C-1 PDH C-3 C-1
OTC:CIBG GM-73 Slst C-3 GM-128 100’ C-1 PDH C-1 PDH C-3 C-1 Slst C-2 C-3 Slst C GM – 73 High Grade Gold Hill Resource Zone High Grade Gold: Range-front Structural Target Area 100’ GM High Grade Gold C-2 GM-73 Au-Opt GM73 350 0.060 GM73 355 0.029 GM73 360 0.369 GM73 365 0.109 GM73 370 0.025 GM73 375 0.012 GM73 380 0.010 GM73 385 0.069 Slst 100’ GM-128 Au-Opt GM 2.897 GM 0.137 GM 0.033 GM 0.021 C-1 C-2 February-March 2015
23
Cross Section: 4100 GM-117 Slst C-1 100’ C-3 PDH PDH GM-127 C-3 PDH
OTC:CIBG GM-117 Slst C-1 100’ C-3 PDH PDH GM-127 C-3 PDH Slst C-1 C-3 Slst C-1 High Grade Gold: Range-front Structural Target Area GM-127 FA30 SAMPLES Au-OPT GM 1.586 GM 0.407 GM 0.220 GM 0.123 GM 0.093 GM 0.043 GM 0.012 GM GM 0.025 C-1 GM-127 High Grade C High Grade Gold Hill Resource Zone C-2 Slst 50’ C-1 C-2 100’ February-March 2015
24
Wilson Independence Project Proposed Budget
OTC:CIBG Wilson Independence Project Proposed Budget Direct Resource Development Drilling Costs February-March 2015
25
Cibolan Gold Proposed Budget Overhead and Expansion
OTC:CIBG Cibolan Gold Proposed Budget Overhead and Expansion February-March 2015
26
Wilson Independence Project Estimated Timeline
OTC:CIBG Wilson Independence Project Estimated Timeline 2015 2016 2017 February-March 2015
27
Wilson Independence Project Production Plan Layout
OTC:CIBG Wilson Independence Project Production Plan Layout
28
2.9 Million Average Price $.029 Fully Diluted 25.7 Million
OTC:CIBG SHARE STRUCTURE (Week of February 12, 2015) OUTSTANDING Issued 22.9 Million Warrants 2.9 Million Average Price $.029 Fully Diluted 25.7 Million SHARE PRICE MARKET CAP US$ 1.5 Million AVG. TRADING 8,061 shares/day February-March 2015
29
THE Cibolan Gold ADVANTAGE
OTC:CIBG THE Cibolan Gold ADVANTAGE Located in Nevada: Gold and Silver mining powerhouse At A Major Mining Company’s Doorstep: The Independence Mine is located at the right address, directly adjacent to the Phoenix Mine Large Gold Resource: NI compliant 1 million ounce Measured, Indicated, and Inferred gold resource; additional 4 million ounce silver resource Excellent Logistics: Accessible by all-weather roads; water and commercial power available; skilled workforce in place Strong Technical Team: 100+ years of experience in the mining sector February-March 2015
30
Complete Preliminary Economic Analysis
OTC:CIBG FUTURE PLANS Complete Preliminary Economic Analysis Validate the substantial gold and silver values at the Project Provide detailed estimates for equipment, construction, permitting, and operational costs Establish a detailed estimate of mine life, production, and profitability Conduct Additional Drilling Programs Continue drilling programs as to further delineate the near surface epithermal systems and the deep targets Expand the Independence Project’s overall resource base Recapitalize Cibolan Gold Corporation Raise new capital for future exploration and development Acquire a TSX listing for the Company February-March 2015
31
OTC:CIBG FUNDING PROPOSAL February-March 2015
32
Cibolan Gold Corporation
OTC:CIBG CORPORATE INFO Cibolan Gold Corporation 1155 West Fourth Street, Suite 210 Reno, NV 89503 Daniel J. Forbush, President & CEO Tel: Fax: February-March 2015
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.